When the high speed train (KTX) departs from station in the high-speed line, sometimes on board signal disappears, which causes a hindrance of the operation punctuality, therefore, we have a research objective to verify the causes of hindrance and to find an improvement plan. In the process of research, when train left, we applied sand on the rail to improve adhesive power, whose sand has an effect on the ATC(Automatic Train Control) signal wave. We detected & analyzed signal waves which came from detecting device by changing operation condition in accordance with sand material
The shoe brake of the KTX is used in low speed when the electric brake is not effective. The main purpose of the shoe brake is to stop the train to a desired stop point at the station. Lots of defects have been encountered in the shoe brake unit since the KTX started its operation. To improve the reliability of shoe brake unit of the KTX power car, first of all, failure modes of the KTX shoe brake unit were analyzed. Main failure modes are cracks in the shoe friction material and fracture in the welded joints of the shoe backing steel structure. Several methods to remove the defects of the shoe brake unit were proposed and on-board tests were carried out: Increase of the strength of the shoe key and shoe cam, which decreased a little the occurrence of cracks in the shoe friction material; Redesign of the shoe backing steel structure, which eliminated the occurrence of the cracks in the backing plate but could not solve completely the crack problem in the shoe friction material; Development of a new friction material, which with redesign of the shoe backing steel structure could solve satisfactorily the crack problem in the shoe friction material.
Korea, a peninsular country with distances of approximate 840 kms south-north and 1,200 kms east-west, currently has only three types of rail transport mode in operation; high-speed KTX, regional railway and urban rapid rail transit. It is very unfortunate that there exists no mountain train system across the country yet, which could be able to contribute both to the promotion of tourism and to a higher affordability of public transport means in the city. This type of rail mode system is more desiring when taking account the fact that 75% of the land topographically belongs to mountainous area. With this background in mind, among others, it is suggested that a mountain train system be laid over the scenic Bukhan Mountain in Seoul linking Gupabal station in line 3 and Ssangmun station line 4. This project would surely require an advancing review on its feasibility and approving result.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.10
/
pp.1523-1527
/
2015
Traction power is supplied by three-phase alternating current of 154 kV power grid and electric trains are operated on single phase feeding system. It becomes important to use all the three phases equally and convert them into two-phase electric power (90 degree phase rotation) for traction supply. This is achieved by special transformer from the adjacent traction substation which is separated by a neutral section. Neutral section locations are in front of the substation and between the two substations. The first stage of the Seoul-Busan high-speed railway, design curve radius is larger than 7,000 m and the greatest slope is 25. The railway track conditions are evaluated as good enough to install a neutral section at the first stage, but a few factors of coasting operation of the train should be considered at the second stage of Seoul-Busan high-speed railway. The neutral section was located at Kim-cheon substation, which made some neutral section problems produced by the operating train, and the neutral section was moved about 1.5 km to the south toward Dong Dae-gu station due to the track operation condition. Some of the trains which stopped at the existing Kim-cheon Gu-mi station produced another motor block failure after moving the neutral section. In this paper, power quality, system performance and track condition, etc. are suggested to solve the problems.
Centering on KTX stations, Korea is implementing specialized development of metropolitan business zones nationwide and is in the process of building the transfer link system of transportation in order to actualize intermodalism nationwide. Daejeon station, hub of high-speed railway requires the effective transportation transfer system considering Daejeon station area reorganization plan and opening of second phase high-speed railway. Based on the analysis of the possibility and validity of building a transit center under the Transportation System Efficiency Act, it is necessary to make a mutual benefit in a regional development by installing the resonable transfer system between railway and other transportation services. Through analysis of current situations and technical, economic and environmental feasibility evaluation, design plan of effective transportation transfer system in Daejeon station is proposed.
Kim, Kyoung-Tae;Moon, Dae-Seop;Lee, Jin-Sun;Park, Bum-Hwan;Lee, Suk
Proceedings of the KSR Conference
/
2007.05a
/
pp.1890-1901
/
2007
This paper explored train frequency of intercity rail station. Main factors to decide train frequency are location of station, social-economic index and land use of station area and travel demand. In this paper, we focused on travel demand which is critical factor to decide train frequency. Tests on a KTX case show that train frequency can be efficiently decreased in weekday to transport same demand. The work has shown many subjects that need further research. It is important to include various factors influencing on train frequency decision.
Kim, Dong-Hyeon;Kwon, Hyeok-Bin;Kim, Do-Hoon;Kim, Moon-Hun;Song, Moon-Shuk
Transactions of the Korean Society of Mechanical Engineers B
/
v.28
no.6
/
pp.734-739
/
2004
The aerodynamic effect on platform during the train passage, the results of field test on the high-speed railway platform are discussed and the whole test results and conclusions are synthesized. The field test for the high-speed railway have been conducted on the Osong temporary platform in the newly constructed Seoul-Busan high-speed line and total 12 measurements have been conducted for G7 train and KTX train. The results shows that the high-speed trains have similar aerodynamic characteristics and have far better characteristics referring to the conventional trains such as Saemaul and Mugungwha trains. To discuss the actual aerodynamic effects on the platform at its own operational speed, Beaufort wind scale have been introduced and the criteria for the safety on railway platform has also been discussed.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.15
no.3
/
pp.105-117
/
2016
Recently the passenger of railway satisfaction levels are lowered. the reason why the railway station was built without considering the increased passenger due to diversification(transfer, shopping, and etc.) of the domestic railway station infrastructure. Especially, in case of KTX Gwangju-Songjeong Station, the number of its passenger has been increased about more than three times since its opening in 2015, so that there are much inconvenience generated in the station congested with passengers. his study aims to excute using Pedestrian simulation and Design Hourly Factor concepts of Highway Engineering, in order to designing the optimum area through the passenger demand forecast for each station. For this analysis was divided into the second stage. Frist, the railway passenger was calculated by using the methodology of Design Hourly Factor that is used during road design in the aspect of traffic engineering. Second, we tried to analyze the level of service in each railway station facility through the pedestrian simulation. Analytical results show that utilizing pedestrian simulation provides verification for calculation of LOS of each railway station facility. Therefore, In the future when designing railway station of facilities will be possible to suggest the facilities area based on LOS.
The noises which occurs from the rolling stock can be divided largely into three classes and they are Rolling noise, Traction noise and Aerodynamic noise. In the event of braking the rolling stock which enter into the station, Brake shoes cause Fraction noise (braking noise) and excessive braking noise makes passengers and operators uncomfortable. This study is to reduce squeal noise and minimize displeasure by measuring the braking noise and defining the major noise sources and noise mechanism
The KTX station is one of special generators that produce a lot of trips caused by special land use such as university, airport, and super shopping mall. Special generators need special attention in developing travel demand models since the standard trip generation and distribution model in the conventional four-step approach do not provide reliable estimates of their travel patterns. New modeling approach, activity-based model, considering travel behavior of person, seem to be more appropriate for those special generators. Thus, this study introduces a spatial-temporal activity-based approach and how activity-based approach can be applied to estimation of travel demand at KTX stations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.