• Title/Summary/Keyword: KSR-II

Search Result 73, Processing Time 0.026 seconds

An operational issues analysis of ICT-based on-board train control system (ICT기반 차상제어시스템 개발에 따른 운영 이슈 사항 분석)

  • Kim, Young-Hoon;Choi, Won-Suk
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1043-1048
    • /
    • 2011
  • In the case of a low density branch line, these areas are operating at a loss. So much money is used for infrastructure maintenance cost. To solve the problem, our institute have a project to develop the Information & Communication Technology based train operation system. In a similar research in the Europe, The UK's Transport Research Laboratory experienced analysis of operational issue for developing ERTMS from Level II to Level III. In this paper, we study about railway operational issues before development of ICT based train operation system. An analysis target of operational issues are railway business process & data, drivability and moving or virtual block system.

  • PDF

A Study on Overall Measurement System Development of HEMU-400X Performance Test (차세대고속열차 성능시험을 위한 종합계측시스템 개발 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Kim, Bong-Rae;Kim, Kyung-Taek
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1118-1123
    • /
    • 2011
  • The introduction of high speed railway(KTX) in Korea after the Korean high speed train through the KTX-II of the development is being run is made. Thus the demand for the railway technology advances and high performance, Korean government promoted the development of the next-generation high speed train system(HEMU-400X). In addition to the production of train system essential element of the train through an on-line test is to evaluate the performance. Through the on-line test of the train in order to evaluate the performance test items should be selected first and need to the test procedures are required. In addition, an Overall Measuring System(OMS) to measure the performance of the train system should be established. In this study for the on-line test of the HEMU-400X test items was selected for detailed measurements and performance evaluation of a comprehensive and efficient trains to test an OMS for the development are discussed.

  • PDF

Technique of Tension Length Calculation for 350km/h High Speed Catenary System (최고운행속도 350km/h급 전차선로 장력구간길이 계산 기법)

  • Chang, Sang-Hoon;Lee, Ki-Won;Kwon, Sam-Young;Park, Jae-Woong
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.932-939
    • /
    • 2011
  • This paper deal with technique of tension length calculation for 350km/h high speed catenary system. Tension length affects in facility investment. Possibility of overlap increasing a tension length and the equipment investor decreases in order to decrease. Considers the parameter which specifies and the grudge which is possible long the fact that decides a tension length is the aim which is important plans overhead contact line. The element which decides a tension length with next following; (i) Operating range of tension device, (ii) Change of the horizontal tension which affects possibility of the effect which operates to the line and span, (iii) Tension of wire material the tensile force which is relation, (iv) Wire thermal expantion which relates with a standard temperature, (v) Curve radius, (vi) Wind velocity, (vii) Thermal range of overhead contact wire and mechanical design of tension mechanism etc.

  • PDF

Technique of Maximum Span Length Calculation for 350km/h High Speed Catenary System (최고운행속도 350km/h급 전차선로 최대경간길이 계산 기법)

  • Chang, Sang-Hoon;Lee, Ki-Won;Ryoo, Hyang-Bok
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.924-931
    • /
    • 2011
  • This paper deal with maximum span calculation technique for 350km/h high speed catenary system. Considers a geometric interaction, possible maximum span length is between two pole. Wind condition and the train current collector is moving even to being pantograph does not escape while operating. Uses like this justice and possible maximum span length is follow next condition. (i) Operating range of pantograph fan head, (ii) The wind velocity which assumes from system, (iii) Width in pantograph from operation height moving, (iv) Type of processing Catenary system, specially tensile strength of overhead contact wire and messenger wire etc. When accurately calculates the maximum permission span, the dropper between of overhead contact wire and messenger wire and must consider the correlation.

  • PDF

Analysis and Test of CBTC Wireless Communication System in KyungSan test Line (II) (경산시험선 CBTC 시스템용 무선통신시스템 시험(2))

  • Ryu, Sang-Hwan;Cho, Bong-Kwan;Lee, An-Ho;Hwang, Hyeon-Chyeol;Yang, Doh-Chul
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2735-2744
    • /
    • 2011
  • Korean-Automated Guideway Transit (K-AGT) was successfully developed through Light Rail System Development Project. Since then, the domestic development rate of on-board signalling system of light rail has been improved up to 90% by Practical Utilization Project of Light Rail. After utilization project, furthermore, POSCO ICT has developed the wayside signalling system of CBTC, including wireless communication equipment. KRRI carried out the performance test of the wireless communication, interfacing and using the other CBTC equipments of KyungSan Test Line so as to see whether it conforms IEEE 802.11x, international communication standard in view of operational concept of CBTC. In this paper, we presents analysis results of roaming test while train runs.

  • PDF

Aging Characteristics of Glass Fabric/Phenolic Composites in Train Carbody (철도차량용 유리섬유직물/페놀릭 복합재의 가속노화 특성)

  • Yoon Sung-Ho;Nam Jung-Pyo;Hwang Young-Eun;Shin Kwang-Bok
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.352-357
    • /
    • 2004
  • In this study. the effects of combined environmental factors on mechanical and thermal analysis properties of graphite/epoxy composites were evaluated through a 2.5KW accelerated environmental aging tester. Environmental factors such as temperature. moisture, and ultraviolet were considered. A xenon-arc lamp was utilized for ultraviolet light. and exposure times of up to 3000 hours were applied. Several types of specimens - tensile, bending, and shear specimens those are warp direction and fill direction were used to investigate the effects of environmental factors on mechanical properties of the composites. The glass fabric $\sharp$650/AP300 was used for the fabrication of specimens. Mechanical degradations for tensile, bending and shear properties were evaluated through a UTM. Also. storage shear modulus. loss shear modulus, and tan $\delta$ were measured as a function of exposure times through a dynamic mechanical analyzer. Finally exposed surfaces of the composites were examined using II scanning electron microscope.

  • PDF

The design concept of the On-Board Computer System using identification coding method (차상컴퓨터장치 식별 코딩 설계방법에 대한 연구)

  • Choi, Kwon-Hee;Ra, Joon-Ho;Shim, Jae-Chul;Kim, Hyung-In;Jung, Sung-Yun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1398-1402
    • /
    • 2007
  • In a high speed train, OBCS(On-Board Computer System) is a up-to-date computer control system that provide controlling, monitoring, maintaining and reparing of the important device, supporting a driver, status of a train, service maintenance, managing the remote control mode, driving order & control, control of a electrical or pneumatic circuit and a passenger service. In general, OBCS is located in each car but in a power car, both main and auxiliary computers are used. These avoid a network collision and maintain the independence of condition and failure records with the information of line number, train number and car number. This paper is intended to provide the information about the identification coding method of domestic and foreign OBCS, for the new high speed train (KTX-II).

  • PDF

Building up a Wireless Network Infrastructure for Rolling-Stock (철도차량에서의 무선인터넷 환경 구축)

  • Lee, Yong-Cheol;Kim, Dong-Il;Chun, Sang-Hun
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.850-856
    • /
    • 2010
  • With skyrocketing number of people who use smartphone, the technology of wireless internet that is mobile-phone, Wi-Fi, Wibro, HSDPA has been developed remarkably. The environment that one can use wireless internet easily and inexpensively anywhere has been made. So, the customer of railway have needs and desire that could use the wireless internet network as travelling in rolling-stock. Although KTX, KTX-II and some subway agency has built-up wireless internet network and serviced it, it's closed infra and inconvenient environment has been criticized. So, we survey the wireless internet network that is serviced at present and the way to build wirelee internet infra to satisfy the needs of customers.

  • PDF

A Study on Performance Evaluation Plan of Next-Generation High-Speed Prototype Train during Test Run (차세대고속열차 본선 시운전 성능평가 방안에 대한 연구)

  • Kim, Sang-Soo;Choi, Snng-Hoon;Park, Choon-Soo;Kim, Seok-Won;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1814-1820
    • /
    • 2010
  • Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And the first hish-speed prototype test train, HSR-350x, was developed and succeeded in testing of running over 350km/h. Now KTX-II based on HSR-350x was started in service run. The new high-speed train development project, HEMU-400x project, has started since 2007. The protype train is being designed and manufactured. After the train are developed completely, it will run on the commercial line and will be test to verify the estimated performance. The authors devised the performance evaluation method and process of the HEMU-400x prototype system. And we introduce the definite performance test items and the method to vitrificate them in this paper.

  • PDF

A review of test norm of Non-insulated AF Track Circuit (무절연 가청주파수(AF) 궤도회로 시험기준 고찰)

  • Chang, Seok-Gahk;Lee, Chang-Young;Kwon, Sung-Tae
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1701-1706
    • /
    • 2007
  • Jointless AF(Audio Frequency) Track Circuit is more comfortable than exist joint track circuit. This electrical circuit's function is detection train on rail, and transmit information between wayside and vehicle. 'Korea Railroad Corporation' proposed for revision of the Korean railway standards(KRS SG 0038-06 R, 2006.5.16) "Non-insulated AF Track Circuit". This proposal equipment developed to extend use for station of National Railway exist line. According to test standards Korean railway safety law and its ordinances, which were committed to Korea Railroad Research Institute, the professional committee 'Railway facility sector II' have helded on January in 2007. In this investigation, the changed test norm will be review the difference of important function test standards of new version to conform effectivity and safety test procedure according to the KS A 1025.

  • PDF