• Title/Summary/Keyword: KEPCO Power System

Search Result 1,267, Processing Time 0.042 seconds

Construction of IED Conformance Testing System (IED 적합성 인증시험 장치 구축)

  • Lee, N.H.;Kim, J.H.;Jang, B.T.;An, Y.H.;Hwang, K.C.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.489-490
    • /
    • 2007
  • In order to construct a digital substation based on IEC61850, All of the utility company should used IEDs to be verified and also vendors should get a certification from the international conformance testing organizationsuch as KEMA. So KEPRI in charge of POWER IT project related to SAS was required to IED conformance testing system, which can perform the test previously. The system, KEPCO developed, consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator etc

  • PDF

Development of AMI NMS (Network Management System) using SNMP for Network Monitoring of Meter Reading Devices (원격검침 설비의 네트워크 상태감시를 위한 SNMP 기반의 저압 AMI 망관리시스템 개발)

  • Kim, Young-Il;Park, So-Jeong;Kim, Young-Jun;Jung, Nam-Jun;Choi, Moon-Suk;Park, Byung-Seok
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.259-268
    • /
    • 2016
  • KEPCO installed AMI (Advanced Metering Infrastructure) metering system for low-voltage customers from 2008. AMI metering system of KEPCO has operated 2.55 million customers and will plan to operate 22 million customers until 2020. KEPCO developed AMI NMS (Network Management System) to operate the meter reading network efficiently. NMS monitors the network status of DCUs (Data Concentration Unit) and modems. NMS provides functionalities of data collection and analysis. It collects property data of network device, network topology information, communication performance information, fault information, and etc. It analyzes collected data and controls network devices by remote access. AMI NMS collects about 370 MIBs (Mangement Information Bases) using SNMP (Simple Network Management Protocol). This paper introduces main functionalities, designed context, and implemented service screen.

Generator Testing and Model Validation for Thermal Plant (전력계통 안정성 향상을 위한 발전기 제어계 특성시험 및 모델링)

  • Cha, S.T.;Kim, Y.H.;Oh, S.I.;Choi, J.H.;Shin, J.H.;Shim, E.B.;Kwak, N.H.;Son, H.I.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.473-474
    • /
    • 2007
  • The Jeju power grid experienced several major power disturbances over the last decade. The postmortem studies of the incidents indicated that some of the generating units did not respond as predicted by system analysis & studies. Consequently, the Korean Power Exchange (KPX) mandated that all units (generators, excitation, governor and turbine systems) in the Korean network greater than or equal to 20MVA be tested to verify the generator reactive power limits as well as the dynamic model data being used for system studies. This paper presents field experiences of the authors in testing and modeling of steam turbines and their associated governors during the generator and model validation.

  • PDF

The Development of Distribution Power Operating System using the Genetic Algorithm (유전자 알고리즘을 이용한 배전계통 운영시스템 개발)

  • Kim, Joon-Oh;Park, Chang-Ho;Lim, Sung-Il
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.480-482
    • /
    • 2000
  • The KEPCO is developing the practical power distribution operating system. The system adopt Genetic Algorithm and will be used loss reduction, load balancing, service planning for large capacity load and various kinds of simulations in the distribution power system. This paper presents the some obstacles and solutions on practical simulation system development, and some problems that need more study.

  • PDF

A study on the system to evaluate the performance of novel ground apparatus (신개발 접지장치의 성능평가시스템에 관한 연구)

  • Park, Sang-Man;Jang, Sang-Ok;Park, Chang-Ho;Kang, Moon-Ho;Choi, Jong-Kee;Lee, Mun-Seok;Choi, Ha-Ok;Lee, Yong-Han;Hwang, Kwang-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2666-2668
    • /
    • 2003
  • The most widely employed grounding apparatus in distribution systems is a driven rod. But this method has some difficulties to get a specified ground resistivity in cities or islands. Recently, the new ground apparatus are proposed. This paper describes the research which relates with the system to evaluate the performance of novel grounding apparatus.

  • PDF

MV Cable Failure Statistics Analysis and Failure Rate Utilization Method of Prioritization of Diagnosis Targets (지중 배전용케이블 고장통계 분석 및 고장률 활용 진단대상 우선순위 선정방법)

  • Cho, Chong-Eun;Lee, On-You;Kim, Sang-Bong;Kim, Kang-Sik
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.263-268
    • /
    • 2021
  • This paper statistically analyzes the time required for each failure cause and describes a diagnostic method for 159 reports of failure analysis of MV cables that occurred in the distribution system of KEPCO over the past 18 years. In addition, the manufacturer's failure rate compared to 100C-km was calculated using 381 cases of MV cable deterioration failure between 2008 and 2020. It is hoped that this paper will help those in charge of maintaining underground facilities at the business office to use the failure rate to prioritize facility diagnosis.

Evaluation of Dielectric Characteristics of HTS Cable System for the Real Power Grid Connection (실계통 연계를 위한 초전도 케이블 시스템 절연특성 평가)

  • Oh, Seung-Ryle;Hwang, Si-Dole;Yang, Hyung-Suk;Sohn, Song-Ho;Lim, Ji-Hyun;Lee, Su-Kil;Jang, Hyun-Man
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.344-345
    • /
    • 2011
  • A necessity to a superconducting cable in power transmission systems have been growing more and more due to high power density in urban areas and rapid increase of power demand. In view of these situation, it is a noteworthy fact that superconducting cable has remarkable advantages, such as lower power loss and 3-5 times higher power transmission capacity, compared with conventional power cable. For the last a few years, long-term reliability tests had been carried out in the KEPCO PT Center, and now it has been installed in KEPCO's real power grid for demonstrating commercial operation. This paper deals with the test results of dielectric properties performed at manufacturing factory for the joint box, termination and core of HTS cable system and whole system connected in real power grid.

  • PDF

Development of a Hydro Turbine Governor and Validation Test

  • Kim, Jong-An;Woo, Joo-Hee;Choi, In-Kyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.105-108
    • /
    • 2015
  • A digital Governor (GOV) has been developed for being used for a Francis hydro turbine, and the validity of the GOV has been tested. As for the hardware system for the GOV, we purchased a basic digital control system that already had proven its reliability in the power industry. We developed a set of new GOV software and integrated it with the hardware system, and finally verified the performance of the whole GOV system. For the human-machine interface (HMI), we configured and implemented appropriate graphic interfaces for the turbine operations. This paper describes the major GOV control functions, approaches we took in developing the GOV control logics, and the validity tests and the results.

Analysis of Low Frequency Oscillations in KEPCO System (한전 실계통에서의 저주파 동요현상 해석)

  • Song, K.Y.;Kwon, S.H.;Kim, D.Y.;Kim, Y.J.;Song, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.397-401
    • /
    • 1991
  • Low frequency oscillations have been observed in KEPCO system. This paper represents how to analyze the power system by using the AESOPS program and analyze the various factors affecting the damping characteristics of these oscillations in KEPCO system of 1986. The characteristics of load, the amount of power flow on the transmission line and the gain of exciter have a significant effects on the damping of the system while the governing system has only a minor one. With the Power System Stabilizers, the stability of the power system has been increased.

  • PDF