• Title/Summary/Keyword: KEPCO Power System

Search Result 1,267, Processing Time 0.027 seconds

Development Study on the Power System Analysis in Myanmar (해외 송변전 사업 추진사례(미얀마 전력망 진단 및 분석))

  • Mun B. S.;Bang M. J.;Choi H. J.;Kim J. H.;Kim S. H.;Choi Y. S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.51-53
    • /
    • 2004
  • KEPCO is now promoting the overseas transmission businesses on the basis of competitive transmission technology. This paper deals with a development study on the power system network analysis in Myanmar which was performed as the first overseas transmission business of KEPCO. The aim of this study is to establish comprehensive and stable power system network plan by analyzing the current and future system in Myanmar.

  • PDF

Korean Power System Security Analysis Using Benchmark Systems

  • Cho Yoon-Sung;Jang Gilsoo
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.3
    • /
    • pp.207-213
    • /
    • 2005
  • This paper deals with the development of benchmark systems based on the Korea Electric Power Corporation (KEPCO) system. A novel procedure for constructing a dynamic equivalent system of the KEPCO system is proposed. By using such a system, various scenarios can be simulated and compared with the original system. The results of the simulation show the benefits of the proposed equivalent system and its validity is confirmed by applying it to the KEPCO system.

Development of Web-based Power Plant Simulator System (원격 훈련용 발전 시뮬레이터 개발)

  • Byun, Seung-Hyun;Kang, Hae-su;Woo, Joo-Hee;Lee, Jee-Hoon;Kim, Duck-Ho
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.277-283
    • /
    • 2021
  • Power plant simulators have been used for operator training, control verification and engineering verification. In general, simulators can be used in the place where they are installed by only single user group at a time. Considering high cost of simulator development, a lot of available scenarios, the diversity of user level and accessibility based on users' work location, development of simulator system that can be used by multiple user groups regardless of location is required in order to enhance utilization of simulators. In this paper, the simulator system that can be used by multiple user group simultaneously without location limitation is proposed. The simulator system is composed of simulator servers, database servers, HMI servers, a web server, web clients. Simulator server consists of control model, process model that are developed for Circulating Fluidized Bed power plant located overseas. A web server manages user accounts, operation procedures, multiple server access between web client group and simulator server group. In other words, a web server makes a user group select a simulator server at a time. The developed simulator system is integrated after implementing process model, control model, HMI, and web server. Web client systems are installed on local site where power plant is located, while simulator servers, HMI servers, database servers, and a web server are located in KEPCO RI. The developed simulator system is verified by steady-state test, malfunction test and so on via remote access.

A Study on Methodology for Automated Contingency and Remedial Action Analysis based on Practical Approach: Development of Automated Scheduled Outage Analysis Tool (실용적 접근 기반의 전력계통 해석 프로그램 상정고장, 해소방안 자동화 기법: 휴전검토 자동화 툴 개발)

  • Song, Jiyoung;Ko, Baekkyung;Shin, Jeonghoon;Han, Sangwook;Nam, Suchul;Lee, Jaegul;Kim, Taekyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.9
    • /
    • pp.1171-1179
    • /
    • 2014
  • ISO(Independent System Operator) or TSO(Transmission System Operator) use power system analysis program to simulate contingency analysis and remedial actions to operate power system stably. Generally, power system analysis program provides automated analysis functions(or modules) to deal with wide area power system. However, because of missed contingency cases, automated contingency analysis has no practical use or has limitation. And in case of remedial action, it doesn't support automated function or takes a lot of times to study, because of simulation in manual for each cases. This paper suggests that new relation with buses and transmission line properties of power system DB used for power system analysis program to simulate automated contingency including all contingency cases needed in the field without missed cases. And it proposes automated remedial action scheme based on practical approach analysis to alleviate overloading or voltage problems. Finally it deals with automated contingency/remedial action analysis(automated scheduled outage) program which is developed by KEPCO and its performance and proposed schemes are proven by case study for real Korean power system data.

Test bed for Advanced function of Smart Inverter and Results Based on Real-Time Simulation Platform (실시간 시뮬레이터 기반의 스마트 인버터 제어기능 시험 환경 구축 및 시험 결과)

  • Sim, Junbo;Ban, Minho;Lim, Hyeonok;Cho, Seong-Soo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.1
    • /
    • pp.107-114
    • /
    • 2021
  • High penetration of renewable energy generators causes unnecessary investment for power system facilities. Especially with Korean government policies such as Renewable Energy 3020 and Inter-connection support Responsibility of KEPCO for 1 MW DERs, the applications of DER interconnection in distribution system have been increasing. To save the investment, smart control functions for DERs are required and the test bed for the inverters which have not been prepared are necessary to insure DER inter-connection stability. For this, test bed for advanced functions of a smart inverter has been constructed and the tests for necessary functions have been implemented. In this paper, the test bed and environment as well as specifications are introduced and the test results for the validation of the functions are analyzed.

DTS-based Temperature Monitoring and Analysis of Battery Cell Deterioration Characteristics by Temperature Condition (DTS 기반 온도 감시 및 온도 조건에서의 배터리 셀 열화 특성 분석)

  • SoonJong, Kwon;Soo-Yeon, Kim;Jin, Hwang;Sang-Kyun, Woo;Bong-Suck, Kim
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.143-149
    • /
    • 2022
  • As ESS safety issues increase recently, there is a need to more precisely monitor the temperature of the ESS. In this paper, DTS technology for temperature monitoring of ESS batteries is introduced and the temperature measurement principle is explained. The temperature of the battery module is measured using the DTS system, and the thermal deviation between battery cells inside the battery module is analyzed. In order to analyze how thermal imbalance affects the charging and discharging performance of the battery, an accelerated degradation test was conducted. Cycle life characteristics analysis, battery surface temperature change, and AC impedance characteristics were conducted to analyze how the performance of battery cells differs according to temperature conditions.

A Study on The Steady State Voltage Control Technique (정상상태에서의 최적전압제어 기법에 관한 연구)

  • Won, Jong-Ryul;Yoon, Yong-Beum;Yoon, Jong-Su;Choo, Jin-Boo
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.214-216
    • /
    • 1998
  • This paper presents the analysis on the voltage problems of Korea electric power system and efficient voltage control actions, when contingencies are considered. This analysis is based on the developed voltage' control techniques. It uses the reactive power-voltage nonlinear characteristics. Therefore, efficient voltage control actions can be obtained. Principal control actions of the program are mainly switched shunt capacitor and generator voltage regulating. This is tested on Korea real power system in future year.

  • PDF

Installation and Test Run of Comprehensive Analysis System for SF6 in Power Equipment

  • Lee, Jeong Eun;Kim, Kwang Sin;Kim, Ah Reum;Park, Seoksoon;Kim, Kyeongsook
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.1
    • /
    • pp.41-47
    • /
    • 2017
  • After $SF_6$, which is being used in power equipment as an insulating material, is classified as one of the 6 major greenhouse gases, the maintenance and the refinement of used $SF_6$ started to get attention. In regard to this, KEPCO Research Institute (KEPRI) is developing $SF_6$ recovery and refinement technology starting with establishing a comprehensive $SF_6$ analysis system. With the analysis system, qualitative and quantitative analyses of the purity and the impurities of $SF_6$ before and after recovery, and before and after refinement have been carried out. The analysis system is comprised of GC-DID (Gas Chromatograph -Discharge Ionization Detector) for trace impurities analysis, GC-TCD (Thermal Conductivity Detector) for analyses of $SF_6$ purity and major impurities concentration from several hundred ppm up to percent range, GC-MSD (Mass Selective Detector) for analyses of impurities not included in standard gas, FT-IR (Fourier Transform-Infrared) Spectrometer for analysis of HF and $SO_2$, and moisture analyzer for analysis of moisture below 100 ppm. With this analysis system, complete analysis method of $SF_6$ has been established. This analysis system is being used in the maintenance of power equipment and the development of $SF_6$ recovery and refinement technologies. In this paper, the analysis results of four samples - gas and liquid phase $SF_6$ samples from a $SF_6$ refinement system before and after refinement are presented.

Survey of the Effects on 154kV Electrical Power Customers' Productive Activities by the Instantaneous Voltage Sag or Interruption in Power System (전원측 정전 및 순간전압강하가 수용가에 미치는 영향 조사)

  • Lee, Seok-Kyu;Park, Hee-Woo;Kim, In-Geon;Lee, Jong-Hak;Kim, Young-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.273-274
    • /
    • 2001
  • This paper presents the effects on 154kV electrical power customers' productive activities by the instantaneous voltage sag or interruption in power system. According to the survey all respondents (8customers) experienced the breakdown of facilities when instantaneous voltage sag over about twenty percents of pre-fault occurred in power system.

  • PDF

Switching Impulse Flashover Tests and Analysis for 765kV Jumper V-strings with Damaged Insulators

  • Choi, In-Hyuk;Shin, Koo-Yong;Lee, Dong-Il;Lim, Jae-Sup;Kim, Young-Hong;Lee, Hyung-Kwon
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.359-363
    • /
    • 2013
  • The 765kV transmission line will be maintained by live-line works for efficient operation. In order to maintain the 765kV transmission lines safely by live-line works, lineman has to know switching impulse flashover characteristics of the jumper V-strings with damaged insulators in advance. In order to know the flashover characteristics this paper carried out experimental flashover mockup tests for jumper V-string with damaged insulators in the outdoors. And it suggests flashover characteristics of the 765kV jumper V-strings also. The results will be used in estimating the safety of live working for 765kV transmission lines.