The purpose of this paper is to explain the techniques of the data verification module achieved while developing a transient stability program which is suitable to korean power system. It concentrates on the concrete explanation about modeling of the dynamic models and the method of the data verification. This proposed module enhances the performance of the developing program. This developing module has been tested with the KEPCO system, and the simulation results obtained from the program are compared to those of commercial programs.
Many Korean industrial plants including nuclear and fossil power plants use seawater as the ultimate heat sink to cool the heat generated by various facilities. Owing to the high corrosivity of seawater, facilities and piping made of metal material in contact with seawater are coated or lined with polymeric materials to avoid direct contact with seawater. However, polymeric materials used as coating and lining have some level of permeability to water and are degraded over time. Korean industrial plants have also experienced a gradual increase in the frequency of damage to pipes in seawater systems due to prolonged operating periods. In the event of a cavitation-like phenomenon, coating or lining inside the piping is likely to be damaged faster than expected. In this paper, the cause of water leakage due to base metal damage caused by the failure of the polyester lining in seawater system piping was assessed and the experience with establishing countermeasures to prevent such damage was described.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.21
no.2
/
pp.71-78
/
2009
Up until recently, the energy and the economic analysis of a cogeneration system have been implemented by a manual calculation that is based on monthly thermal loads of buildings. In this study, a cogeneration system modeling validation with a detail building energy simulation, eQUEST, for a building energy and cost prediction has been implemented. By analyzing the hourly building electricity and thermal loads, it enables users to decide proper cogeneration system capacity and to estimate more accurate building energy consumption. eQUEST also verified the energy analysis when the heat pump system is integrated with the cogeneration system. The mechanical system configuration benefits from the high efficiency heat pump system while avoiding the building electricity demand increase. Economic analysis such as LCC (Life Cycle Cost) method is carried out to verify economical benefits of the system by applying actual utility rates of KEPCO(Korea Electricity Power COmpany) and KOGAS(KOrea GAS company).
In general, the PSS/E program based on RMS mathematical models is used for analyzing the steady state and transient stability phenomena of full-scale large power system. Whereas, the EMTDC program unlike PSS/E, studies the specific reduced small-scale power systems as a basis of instantaneous value mathematical models and used to analyze the Electro-Magnetic transient characteristics. The PSS/E provides various control models such as exciter, governor and PSS models, But there are few control models in EMTDC. In this paper, we developed EMTDC models for governor which have been applied in KEPCO system. The EMTDC models are developed by examining PSS/E control block and using User Define Model in addition to default.lib provided by EMTDC. we verify the correctness of developed governor models with PSS/E and EMTDC simulation results using Governor Step(GSTEP) method.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.54
no.6
/
pp.306-314
/
2005
In this paper, a new approach that is based on EEAC & only with network solutions for CS&S in the transient stability assessment is developed. The proposed CS&S algorithm in conjunction with EEAC to include the capability of performing on-line TSA without TDS is used to calculate the critical clearing time for stability index. In this algorithm, all generators are represented by classical models and all loads are represented by constant impedance load models. The accelerating & synchronizing power coefficient as an index is determined at its disturbance through solving network equation directly. As mentioned above, a new index for generator is generally used to determine the critical generators group. The generator rotor angle is fixed for non-critical generators group, but has equal angle increments for critical generators group. Finally, the critical clearing time is calculated from the power-angle relationship of equivalent OMIB system. The proposed CS&S algorithm currently being implemented is applied to the KEPCO system. The CS&S result was remarkably similar to TSAT program and SIME. Therefore, it was found to be suitable for a fast & highly efficient CS&S algorithm in TSA. The time of CS&S for the 139 contingencies using proposed CS&S algorithm takes less than 3 seconds on Pentium 4, 3GHz Desktop.
Park, Young-Moon;Park, Jong-Bae;Won, Jong-Ryul;Jhong, Man-Ho;Kim, Jin-Ho;Choo, Jin-Boo;Jeon, Dong-Hoon
Proceedings of the KIEE Conference
/
1996.07b
/
pp.823-825
/
1996
This paper proposes a preventive maintenance scheduling system which is a user-friendly decision-making support system. The objective of the development of the package is to supply KEPCO's working experts with a useful tool for gaining a practical maintenance schedule. This program based on the MS Windows is made up of two main modules. The first is an interactive decision-making support module(IDSM). The main objective of this module is to provide various useful text and graphic information to users, and enable practicing engineers with sensitivity analysis of a targeting maintenance schedule. The second is a mathematical optimization module(MOM). In this module, the objective function of levelizing net reserve ratio with daily time-increment is optimized using the relaxation method.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.2
/
pp.264-268
/
2016
Recently, various energy efficiency optimization activities are ongoing globally by integrating conventional grids with ICT (Information and Communication Technology). In this sense, various smart grid projects, which power suppliers and consumers exchange useful informations bilaterally in real time, have been being carried out. The electric vehicle diffusion program is one of the projects and it has been spotlighted because it could resolve green gas problem, fuel economy and tightening environmental regulations. In this paper, the economics of V2G system which consists of electric vehicles and the charging infrastructure is evaluated comparing electric vehicles for V2G with common electric vehicles. Additional benefits of V2G are analyzed in the viewpoint of load leveling, frequency regulation and operation reserve. To find this benefit, electricity sales is modeled mathematically considering depth of discharge, maximum capacity reduction, etc. Benefit and cost analysis methods with the modeling are proposed to decide whether the introduction of V2G systems. Additionally, the methods will contribute to derive the future production and the unit cost of electric vehicle and battery and to get the technical and economic analysis.
The enlargement of an electric power system network gives us much challenges concerning with network operation. In addition to it, the fast aging process of network equipments requires more chance to check and maintenance, and also the increase of heavy loaded facilities and the increase of the fault current in the network need to exchange with the larger facilities in capacity. Due to these reasons, outages trend to increase. Network solution studies for outages are performed mainly for two purposes. The first one is to find the countermeasures when the outage causes a violation of the network reliability criteria. And the second one is to minimize network constraints due to outages. There are so many outages around 400 for only one month. Therefore, in order to do case studies for outage, not only skilled persons are needed, but also many available tools to help properly. Concerning with proper tools, we will introduce a program which we developed to get informations concerned with network sensitivity, and an example to apply that program.
Hwang, Kyeong Min;Lee, Kyung Jin;Yang, Hyun Jung;Kim, Won Ki
Journal of Korean Society of Steel Construction
/
v.26
no.1
/
pp.1-10
/
2014
In this study, out-of-plane flexural test was performed to analyze behavior properties for a beam specimen which imitated a structure with connection member between reinforced concrete and steel plate concrete part. Tie bars between a upper and a lower steel plate, and tie wide flange shapes between upper and lower ribs were designed to prevent the steel plate or the ribs from breakaway in the connection of the specimen. As a result of the test, ductile failure behavior of the specimen and the functionality of the tie members were conformed as originally intended. Also, tension tests were performed to evaluate the design appropriateness of two specimens produced to anchor and connect mechanically #14 bars. The two test results showed that the anchorage connection system behaves in elastic limit during the main bars yielded, and the integrity of the designed system was verified.
Nguyen, Dinh Hung;Nguyen, Minh Y.;Nguyen, Van Thang;Kim, Tae-Won;Kim, Kern-Joong;Yoon, Yong-Tae
Proceedings of the KIEE Conference
/
2011.07a
/
pp.168-169
/
2011
The aim of this paper is to present a new algorithm for the load flow problem using modified Newton-Raphson (NR) iteration method and a approach to derive a simple formula to compensate the reactive power at some heavy load bus. The reactive power source used in this research is the DG which is adjacent to the heavy load. Phenomena of low voltages may cause the load flow calculation process to diverge. In modified NR method, low voltages will be detected and corrected before the next iteration. Therefore, the results of load flow calculation process satisfy the voltage constraint i.e. higher than the lower voltage limit or higher than the critical voltage in case the conventional load flow diverges. Linearizing the power network using PTDFs is a simple method with accepted errors. A new value of voltage at the DG terminal is computed in terms of the voltage deviation of load buses. In this approach, solving the entire system is unnecessary.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.