• 제목/요약/키워드: Job Oriented Heuristic

검색결과 6건 처리시간 0.02초

작업지향 탐색적 일정계획을 위한 LSB 기법 (LSB Algorithm for the Job Oriented Heuristic Scheduling)

  • 김현준;박창규
    • 경영과학
    • /
    • 제21권2호
    • /
    • pp.79-91
    • /
    • 2004
  • In industrial production settings, scheduling problems for detailed day-to-day operations are often ordeals to production practitioners. For those who have scheduling experiences with the Gantt Chart, the job oriented heuristic scheduling has illustrated its merits in solving practically large scale scheduling problems. It schedules all operations of a job within a finite capacity before considering the next job. In this paper, we Introduce the LSB (load smoothing backward) scheduling algorithm for the job oriented heuristic scheduling. Through a computer experiment in a hypothetical setting, we make a performance comparison of LSB scheduling algorithm with existing algorithms and also suggest a guideline for selecting the suitable algorithm for certain industrial settings.

LSB 스케줄링기법의 소개

  • 박창규;김현준
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.944-948
    • /
    • 2002
  • In industrial production setting scheduling problems of detalied day-to-day operations are often ordeals to production practitioners. For those who have scheduling experience with the Gantt Chart, the job oriented heuristic scheduling has illustrated its merits in solving practically large stale scheduling problems. It schedules all operations of a job within a finite capacity before considering the next job. This paper introduces a new LSB (load smoothing backward) scheduling algorithm for the job oriented heuristic scheduling. Through the computer simulation in a hypothetical setting, this paper provides a comparison of LSB scheduling with existing algorithms and a guideline for selecting the suitable algorithm for certain industrial setting.

  • PDF

공작기계간 연결작업을 고려한 일정계획 수립에 관한 연구 (A Study on Production Scheduling with respect to the possibility of the connection between machines)

  • 김동희;김봉선
    • 산업경영시스템학회지
    • /
    • 제17권32호
    • /
    • pp.105-112
    • /
    • 1994
  • The purpose of this paper is to develope a heuristic algorithm to maximize reduction rate of the processing time by the connection of neighbored machines. A method to calculate the start-lag and stop-lag for the overlapping production is proposed and applied. The heuristic procedure of this paper has 3 steps. In the first and second step, the job oriented procedure is applied. In the final step, the operation oriented procedure is applied. In order to evaluate the performance of this algorithm, three kinds of performance measures are selected and randomly generated problems are tested.

  • PDF

납기지연시간 단축을 위해 AGV 시간을 고려한 작업할당 방법 (A AGV time-oriented Job Dispatching Methodology for Preventing the Tardiness)

  • 김근형;고효헌;백준걸
    • 대한안전경영과학회지
    • /
    • 제13권4호
    • /
    • pp.125-137
    • /
    • 2011
  • Customers are generally requiring a variety of products, earlier due date, and lower price. A manufacturing process needs the efficient scheduling to meet those customer's requirements. This study proposes the novel algorithm named MJA(Minimum Job completion time and AGV time) that increases the performance of machines and AGV(Automated Guided Vehicles) in many kinds of job types. MJA optimizes the bottleneck of machines and efficiency of AGV with considering two types of dispatching at the same time. Suggested algorithm was compared with existing heuristic methods by several simulations, it performed better for reducing the time of tardiness.

컨테이너 셔틀운송을 위한 차량 대수 결정 (Determination of Vehicle Fleet Size for Container Shuttle Service)

  • 고창성;정기호;신재영
    • 경영과학
    • /
    • 제17권2호
    • /
    • pp.87-95
    • /
    • 2000
  • This paper presents two analytical approaches to determine the vehicle fleet size for container shuttle service. The shuttle service can be defined as the repetitive travel between the designated places during working period. In the first approach, the transportation model is adopted in order to determine the number of vehicles required. Its advantages and disadvantages in practical application are also discussed. In the second approach, a logical network which is oriented on job is transformed from a physical network which is focused on demand site. Nodes on the logical network represent jobs which include loaded travel, loading and unloading and arcs represent empty travel for the next jobs which include loaded travel, loading and unloading and arcs represent empty travel for the next job. Then a mathematical formulation is constructed similar to the multiple traveling salesman problem (TSP). A solution procedure is carried out based on the well-known insertion heuristic with the real world data.

  • PDF

An Operating System Design and Development for Efficient Painting Process

  • Chung, Kuy-Hoon;Baek, Tae-Hyun;Park, Ju-Chull;Cho, Kyu-Kab
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.183-187
    • /
    • 2000
  • In this study, we design a scheduling system for painting shop, called HYPOS(Hyundai heavy industry Painting shop Operating System) and develop a system implementing the design. The painting shop operations are currently scheduled manually by experts. Manual scheduling is a serious time consuming job and generally can not guarantee a full optimality. Building a traditional heuristic scheduling system lot this problem, however, is not promising because there are various kinds of constraints to be satisfied including space allocation of shipbuilding blocks in a painting cell. We, therefore, adopt a spatial scheduling approach and develop scheduling algorithms based on field-oriented scheduling heuristics and computational geometry. And we show that the algorithms can successfully be applied to the painting shop scheduling problem.

  • PDF