Operating performance of desalination system with solar energy (태양에너지 해수담수화 시스템 운전 성능)

  • Kwak, Hee-Youl;Yoon, Eung-Sang;Joo, Moon-Chang;Joo, Hong-Jin
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.04a
    • /
    • pp.250-255
    • /
    • 2009
  • This study was analyzed the long term performance of the demonstration system for solar energy desalination in Jeju. we used a solar thermal system as heat source of the single-stage fresh water generator with plate-type heat exchangers and a photovoltaic power system as electric source for hydraulic pumps. The demonstration system was designed and installed at Jeju-island in 2006. The system was comprised of the desalination unit with daily fresh water capacity designed as $2m^3$ a $120m^2$ evacuated tubular solar collector to supply the heat, a $6m^3$ heat storage tank, and a 5kW photovoltaic power generation to supply the electricity of hydraulic pumps for the heat medium fluids. Through the operation during about 3 years, In a clear day more than $400W/m^2$, the daily fresh water showed to produce more than about 500liter, and from January, 2007 to March, 2009 for 3 years, solar irradiance daily averaged was measured $370W/m^2$, the daily fresh water yield showed that can be produced about 330liter.

  • PDF

Development of the Control System for Fast-Responding Frequency Regulation in Power Systems using Large-Scale Energy Storage Systems

  • Lim, Geon-Pyo;Park, Chan-Wook;Labios, Remund;Yoon, Yong-Beom
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.9-13
    • /
    • 2015
  • Energy storage systems (ESS) can be used to provide frequency regulation services in a power system to replace traditional frequency regulation power plants. Battery ESS, in particular, can provide "fast-responding frequency regulation," wherein the facility can respond immediately and accurately to the frequency regulation signal sent by the system operator. This paper presents the development and the trial run results of a frequency regulation control system that uses large-scale ESS for use in a large power system. The control system was developed initially for the 4 MW ESS demonstration facility in Jocheon Jeju Island, and was further developed for use in the 28 MW ESS facility at the Seo-Anseong substation and the 24 MW ESS facility at the Shin-Yongin substation to provide frequency regulation services within mainland Korea. The ESS facility in Seo-Anseong substation responds to a sudden drop in frequency via governor-free control, while the ESS facility in Shin-Yongin responds via automatic generator control (AGC).

Development and Installation of Voltage Management System for Voltage and Reactive Power Control of Wide Area System (광역계통 전압/무효전력 관리를 위한 전압관리시스템의 개발 및 현장설치)

  • Nam, Su-Chul;Shin, Jeong-Hoon;Baek, Seung-Mook;Lee, Jae-Gul;Moon, Seung-Pil;Kim, Tae-Kyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1540-1548
    • /
    • 2010
  • KEPCO proposes enhanced voltage management system that is a coordinate voltage control system between the hierarchical voltage control system and the slow voltage control system. It has been installing in Jeju island. VMS consists of a master controller, CVC (Continuous Voltage Controller) and DVC (Discrete Voltage Controller). CVC consists of main controller, FDMU (Field Data Measurement Unit) and several RPDs (Reactive Power Dispatcher). CVC has a control scheme with AVRs of generator to maintain the voltage of a pilot bus in a power system, DVC has a control scheme with static reactive power sources, like a shunt capacitor, a shunt reactor, ULTC and so on, to maintain the reactive power reserve of a power system and a master controller is executed to recover reactive power margin of a power system through coordinated control between CVC and DVC.

A Study on Centralized Wind Power Forecasting Based on Time Series Models (시계열 모형을 이용한 단기 풍력 단지 출력 지역 통합 예측에 관한 연구)

  • Wi, Young-Min;Lee, Jaehee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.918-922
    • /
    • 2016
  • As the number of wind farms operating has increased, the interest of the central unit commitment and dispatch for wind power has increased as well. Wind power forecast is necessary for effective power system management and operation with high wind power penetrations. This paper presents the centralized wind power forecasting method, which is a forecast to combine all wind farms in the area into one, using time series models. Also, this paper proposes a prediction model modified with wind forecast error compensation. To demonstrate the improvement of wind power forecasting accuracy, the proposed method is compared with persistence model and new reference model which are commonly used as reference in wind power forecasting using Jeju Island data. The results of case studies are presented to show the effectiveness of the proposed wind power forecasting method.

Mutual Application of Met-Masts Wind Data on Simple Terrain for Wind Resource Assessment (풍력자원평가를 위한 단순지형에서의 육상 기상탑 바람 데이터의 상호 적용)

  • Son, Jin-Hyuk;Ko, Kyung-Nam;Huh, Jong-Chul;Kim, In-Haeng
    • Journal of Power System Engineering
    • /
    • v.21 no.6
    • /
    • pp.31-39
    • /
    • 2017
  • In order to examine if met-masts wind data can exchange each other for wind resource assessment, an investigation was carried out in Kimnyeong and Haengwon regions of Jeju Island. The two regions are both simple terrain and 4.31 km away from each other. The one-year wind speed data measured by 70 m-high anemometers of each met-mast of the two regions were analysed in detail. Measure-Correlate-Predict (MCP) method was applied to the two regions using the 10-year Automatic Weather System (AWS) wind data of Gujwa region for creating 10-year Wind Statistics by running WindPRO software. The two 10-year Wind Statistics were applied to the self-met mast point for self prediction of Annual Energy Production (AEP) and Capacity Factor (CF) and the each other's met mast point for mutual prediction of them. As a result, when self-prediction values were reference, relative errors of mutual prediction values were less than 1% for AEP and CF so that met masts wind data under the same condition of this study could exchange each other for estimating accurate wind resource.

Insulation Design and Reliability Evaluation of ±80kV HVDC XLPE Cables

  • Jung, Chae-Kyun;Park, Hung-Sok;Kang, Ji-Won
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.1002-1008
    • /
    • 2014
  • This paper describes insulation design and its reliability evaluation of ${\pm}80kV$ HVDC XLPE cable. Recently, the construction of HVDC transmission system, which is combined overhead line with underground cable, has been completed. This system is installed with existing 154 kV AC transmission line on the same tower. In this paper, the lightning transient analysis is firstly reviewed for selection of basic impulse insulation level and nominal insulation thickness. Then the electrical performance tests including load cycle test and superimposed impulse test based on CIGRE TB 496 are performed to evaluate the reliability of newly designed HVDC cable. There is no breakdown for ${\pm}80kV$ HVDC XLPE cable during electrical performance test. Finally, this system is installed in Jeju island based on successful electrical performance test (Type test). After installation tests are also successfully completed.

Development of a User-Friendly Application for Voltage Sag Analysis

  • Park Chang-Hyun;Jang Gil-Soo;Kim Chul-Hwan;Kim Jae-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • v.1 no.2
    • /
    • pp.145-152
    • /
    • 2006
  • This paper presents a windows application for voltage sag analysis and effective data visualization. The developed Voltage Sag Analysis Tool (VSAT) was designed by using the Object-Oriented Programming (OOP) concept and C++ programming language. The VSAT provides basic functions for voltage sag analysis such as power flow analysis, short circuit analysis and stochastic analysis. In particular, the VSAT provides effective data visualization through computer graphics and animation. Analysis results are expressed realistically and intuitively on geographical display. The Graphic User Interface (GUI) of VSAT was designed specifically for voltage sag analysis. In this paper, the development and implementation of VSAT is presented. In order to demonstrate the capabilities of VSAT, it is used to analyze the Jeju Island power system in South Korea.

Survey of Sedimentary Environment and Sediment at the West-Northern Site of Chagwi-do nearby Jeju Island (제주도 차귀도 서북쪽 해역 내 퇴적 환경 및 퇴적물 조사)

  • Kim, Hansoo;Hyeon, Jong-Wu;Jin, Changzhu;Kim, Jeongrok;Cho, Il-Hyoung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.19 no.2
    • /
    • pp.137-143
    • /
    • 2016
  • The sedimentary environment and sediment were surveyed at the West-Northern site of Chagwi-do nearby Jeju Island for the design of the embedded suction anchor system of 10 MW-class floating wave-offshore wind hybrid power generation system. According to the classification scheme of Chough et al.[2002], the echo type of the seismic profiles using the chirp III was classified. As a results, the center and west-northern area of survey site were proved to be type I-3 where subbottom layer with thickness 5~15 m exists under the flat seafloor. On the other hands, the east-southern area were regarded to be type I-1, I-2 and III-1 where seafloor reflection is much stronger than type I-3. Also, the physical tests (unit weight, moisture content, grain size, liquid limit, specific gravity) were performed with samples taken from 8 fixed locations. It is found that the sand (SP), the sand blended with silt (SM) and the mixture of SP-SM are distributed uniformly on the survey area.

Analysis of Factors Influencing the Measurement Error of Ground-based LiDAR (지상기반 라이다의 측정 오차에 영향을 미치는 요인 분석)

  • Kang, Dong-Bum;Huh, Jong-Chul;Ko, Kyung-Nam
    • Journal of the Korean Solar Energy Society
    • /
    • v.37 no.6
    • /
    • pp.25-37
    • /
    • 2017
  • A study on factors influencing measurement error of Ground-based LiDAR(Light Detection And Ranging) system was conducted in Kimnyeong wind turbine test site on Jeju Island. Three properties of wind including inclined angle, turbulence intensity and power law exponent were taken into account as factors influencing the measurement error of Ground-based LiDAR. In order to calculate LiDAR measurements error, 2.5-month wind speed data collected from LiDAR (WindCube v2) were compared with concurrent data from the anemometer on a nearby 120m-high meteorological mast. In addition, data filtering was performed and its filtering criteria was based on the findings at previous researches. As a result, at 100m above ground level, absolute LiDAR error rate with absolute inclined angle showed 4.58~13.40% and 0.77 of the coefficients of determination, $R^2$. That with turbulence intensity showed 3.58~23.94% and 0.93 of $R^2$ while that with power law exponent showed 4.71~9.53% and 0.41 of $R^2$. Therefore, it was confirmed that the LiDAR measurement error was highly affected by inclined angle and turbulence intensity, while that did not much depend on power law exponent.

Transmission Network Expansion Planning Using Reliability and Economic Assessment

  • Kim, Wook-Won;Son, Hyun-Il;Kim, Jin-O
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.3
    • /
    • pp.895-904
    • /
    • 2015
  • This paper presents a probabilistic approach of reliability evaluation and economic assessment for solving transmission network expansion planning problems. Three methods are proposed for TNEP, which are reorganizing the existing power system focused on the buses of interest, selecting candidates using modified system operating state method with healthy, marginal and at-risk states, and finally choosing the optimal alternative using cost-optimization method. TNEP candidates can be selected based on the state reliability such as sufficient and insufficient indices, as proposed in this paper. The process of economic assessment involves the costs of construction, maintenance and operation, congestion, and outage. The case studies are carried out with modified IEEE-24 bus system and Jeju island power system expansion plan in Korea, to verify the proposed methodology.