• Title/Summary/Keyword: Jeju-Island power system

Search Result 109, Processing Time 0.027 seconds

Determination of the Hybrid Energy Storage Capacity for Wind Farm Output Compensation (풍력발전단지 출력보상용 하이브리드 에너지저장장치의 용량산정)

  • Kim, Seong Hyun;Jin, Kyung-Min;Oh, Sung-Bo;Kim, Eel-Hwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.4
    • /
    • pp.23-30
    • /
    • 2013
  • This paper presents the determination method of the hybrid energy storage capacity for compensating the output of wind power when disconnecting from the grid. In the wind power output compensation, a lot of charging and discharging time with lithium-ion battery will be deteriorated the life time. And also, this fluctuation will cause some problems of the power quality and power system stability. To solve these kind of problems, many researchers in the world have been studied with BESS(Battery Energy Storage System) in the wind farm. But, BESS has the limitation of its output during very short term period, this means that it is difficult to compensate the very short term output of wind farm. Using the EDLC (Electric Double Layer Capacitor), it is possible to solve the problem. Installing the battery system in the wind farm, it will be possible to decrease the total capacity of BESS consisting of HESS (Hybrid Energy Storage System). This paper shows simulation results when not only BESS is connected to wind farm but also to HESS. To verify the proposed system, results of computer simulation using PSCAD/EMTDC program with actual output data of wind farms of Jeju Island will be presented.

System-Level Vulnerability Analysis for Commutation Failure Mitigation in Multi-infeed HVDC Systems

  • Yoon, Minhan;Jang, Gilsoo
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1052-1059
    • /
    • 2018
  • This paper deals with commutation failure of the line-commutated converter high voltage direct current (LCC HVDC) system caused by a three phase fault in the ac power system. An analytic calculation method is proposed to estimate the maximum permissible voltage drop at the LCC HVDC station on various operating point and to assess the area of vulnerability for commutation failure (AOV-CF) in the power system based on the residual phase voltage equation. The concept is extended to multi-infeed HVDC power system as the area of severity for simultaneous commutation failure (AOS-CF). In addition, this paper presents the implementation of a shunt compensator applying to the proposed method. An analysis and simulation have been performed with the IEEE 57 bus sample power system and the Jeju island power system in Korea.

Study on the Property of Land for Fault Point Searching System of Submarine Cable (해저케이블 고장점 탐지시스템 육상 특성 연구)

  • An, Y.H.;Jo, G.J.;Yu, H.Y.;Jung, C.S.;Park, C.Y.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.578-579
    • /
    • 2005
  • HVDC(High Voltage Direct Current) is an underwater cable between Jeju Island and Haenam in main land and supplies approximately 50% of electrical usage in Jeju Island. If there is any power failure due to HVDC, it will cost approximately 50,000 US dollars per day including Thermal Electrical Generation. Therefore it is absolutely necessary to recover the problem in rapid timely basis. In conclusion, new method and new systems(ULTRA #44 Model) are needed urgently to upgrade current HVDC underwater cable survey technique in Korea to minimize the cost and time factors.

  • PDF

Web based Online Real-time Reliability Integrated Information System in Composite Power System Considering Wind Turbine Generators (풍력발전기를 고려한 복합전력계통의 웹기반 온라인 실시간 신뢰도 정보 시스템의 개발)

  • Cho, Kyeong-Hee;Choi, Jae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.7
    • /
    • pp.1305-1313
    • /
    • 2011
  • Web based online real-time reliability integrated information system is asked rapidly for more efficiency and demand response in recent. As the utilization of renewable resources has been receiving considerable attention in recent years, the information system requirement is increased. Specially, the reliability information system is more important for implementing the smart grid. This paper describes architecture of the WORRIS(Web based Online Real-time Reliability Integrated Information System) Version 7.0 system that simulates the reliability indices in composite power system considering wind turbine generators(WTG) developed successfully in this paper. And we had simulated the case study using Jeju island power system data.

A sensitivity analysis about reactive power according to the interconnection distance of wave-offshore hybrid generation system (복합발전 계통연계 시 보상장치 필요성 분석을 위한 거리에 따른 무효전력 민감성 분석)

  • Jung, Seungmin;Yoo, Yeuntae;Song, Sungyoon;Jang, Gilsoo
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.251-252
    • /
    • 2015
  • The designed hybrid generation system (HGS) not only consider the voltage condition of grid connection point but also do reactive power support according to the transmission system operator's directions. The PCS operation plan in HGS should be supported by precise transferred quantity expectation about reactive power because the system has large physical areas and also be interconnected with grid through long transmission system. Therefore, the realistic measuring process about transferred reactive power quantity by utilizing HGS is required to consider additional compensation plan. In this paper, an reactive power transferred capability of HGS with expected parameter is analyzed, and imposed to the simulation process that is performed on EMTDC environment. Basically, grid information and system characteristics were utilized with Jeju island in Korea, and the performance analysis is carried out based on the composed layout in ongoing project.

  • PDF

Analysis of the Capacity Credit of Wind Farms (풍력발전기의 Capacity Credit추정에 관한 연구)

  • Wu, Liang;Park, Jeong-Je;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.16-18
    • /
    • 2008
  • Because of being environmentally friendly, renewable energy resources has been growing at a high rate. Wind energy is one of the most successfully utilized of such sources for producing electrical energy. Due to the randomness of wind speed, wind farms can not supply power with a balanceable level as well as conventional power plants. The reliability evaluation of wind power is more and more important. Capacity credit is used to estimate the capacity credit of power systems including wind farms. This paper presents a method of capacity credit calculation for a power system considered wind farms and shows how it gets study on an actual power system (the Jeju Island power system). The paper describes the step of capacity credit calculation and presents test results, which indicate its effectiveness.

  • PDF

A Study on the Estimation of Optimal ESS Capacity Considering REC Weighting Scheme (REC 가중치를 고려한 최적 ESS 용량 산정에 관한 연구)

  • Lee, Sungwoo;Kim, Hyoungtae;Shin, Hansol;Kim, Tae Hyun;Kim, Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.8
    • /
    • pp.1009-1018
    • /
    • 2018
  • As the generation of renewable energy increases rapidly, the stability of the grid due to its intermittency becomes a problem. The most appropriate way to solve this problem is to combine and operate the renewable generators with the ESS(Energy Storage System). However, since the revenues of operating the ESS are less than the investment cost, many countries are implementing various incentive policies for encouraging investment of the ESS. In this paper we estimated optimal capacity of the ESS to maximize profits of renewable energy generation businesses under the incentive policy of Korea and analyzed the impact of the incentive policy on the future electric power system of Jeju island. The simulation results show that the incentive policy has significantly improved the profitability of the renewable energy businesses generation business. But the volatility of the net demand has increased as the energy stored in the ESS is discharged intensively at the time of the incentive application.

±80kV 60MW HVDC Operational Strategy in Abnormal State (비상상태에서의 제주 ±80kV 60MW HVDC 운전 방안 연구)

  • Yoon, Jong-Su;Seo, Bo-Hyeok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.5
    • /
    • pp.664-668
    • /
    • 2012
  • This paper presents the operation strategy of KEPCO(Korea Electric Power COporation) ${\pm}80kV$ 60MW Bipole HVDC system that will be applied between Guemak C/S(converter station) and Hanlim C/S in Jeju island. Unlike intertie HVDC system, this system is located in AC power grid inside. Therefore, the enhancement of system security related with line flow and bus voltages can be major operation strategy. In this paper, in particular, the optimal operation algorithm in the abnormal(not steady state) power system is presented and simulated.

A Study on the Method to Minimize Measuring Burial Depth Error for Submarine Cable (해저케이블 매설심도 측정오차 저감 방법에 관한 연구)

  • An, Yong-Ho;Kim, Yong-Hak;Han, Jeong-Yeol;Lee, You-Jin;Han, Byoung-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.2
    • /
    • pp.329-334
    • /
    • 2012
  • The distribution submarine cables are normally used for power supply at island, which are mostly installed in the southern coast of KOREA, and partially installed in the west coast and Jeju-Island. There are two way of submarine cable burying system, buried and unburied type. Since 2003, KEPCO is entirely being constructing the distribution submarine cable by buried type. In this case, 'burial depth' is key index for evaluating the suitability of the buried situation. Therefore, the measurement accuracy of 'burial depth' is a big issue for burying system in the distribution submarine cable. This paper demonstrates the measurement error of burial depth that is affected by electrical factor such as grounding type of submarine cable in case of magnetic field detection method, and indicates the method to reduce the measurement error in buried type of distribution submarine cable system.