• 제목/요약/키워드: Jeju island power system

검색결과 109건 처리시간 0.02초

제주지역 계통특성을 고려한 다기(Multi-Infeed) HVDC 시스템 운전 방안에 관한 연구 (A Study on the Operation Strategies of Multi-Infeed HVDC System in Jeju Island Power System)

  • 이승엽;윤민한
    • 전기학회논문지
    • /
    • 제66권12호
    • /
    • pp.1675-1681
    • /
    • 2017
  • As recently the demand on electric power has been increasing, the requirement of power supply reliability has been increased. Accordingly, the number of HVDC transmission systems in the world has been steadily increased, which have been installed in the power system to transmit a large capacity power to the long distant and interconnect the power grid between different countries. etc. #1 HVDC Transmission System was installed between Haenam and Jeju island in 1998, which is the first HVDC system furnished in korea. and has been operated until now. Before #1 HVDC Transmission System being installed, the power system of the Jeju Island is a isolated power system from that of Korea mainland. After the construction of #1 HVDC the system has made the Jeju power system more reliable and also been able to supply the mainland power, which was cheaper than that of Jeju island, to Jeju island. The construction of additional HVDC transmission system between mainland and the Jeju Island has been currently underway to cope with recent changes of the power market of the Jeju island, for examples the increase of power demand and the capacity of wind power generation. etc. #2 HVDC Transmission System construction was completed in 2012. #3 HVDC Transmission System will be also installed according to the plan. If all goes as planned, the Jeju power system will be operated with Multi-Infeed HVDC system connected to mainland power system. So the additional studies are needed in order to maintain the stability of the Jeju power system and get the efficiency of the Multi-Infeed HVDC system. Therefore, in this paper, the optimal operation strategies of the Multi-Infeed HVDC system between the mainland of Korea and the Jeju are suggested to ensure the stability of the power system in Jeju Island when the Multi-Infeed HVDC system is operated between two power system.

전압형 MMC-HVDC에 의한 제주계통의 풍력한계용량 증대 방안 (A Strategy of Increasing the Wind Power Penetration Limit with VSC Type MMC-HVDC in Jeju Power System)

  • 이승민;김일환;김호민;채상헌;왓나우덩
    • 전력전자학회논문지
    • /
    • 제20권6호
    • /
    • pp.550-557
    • /
    • 2015
  • The Jeju Special Self-Governing Province is currently promoting the "Carbon-free Island by 2030" policy, which requires the use of renewable energy instead of fossil fuel so that the island will have no carbon gases generated by 2030. To implement this policy, the island plans to build a wind power plant capacity of 1.09 GW in 2020; this wind power plant is currently ongoing. However, when wind power output is greater than the power demand of the island, the stability of Jeju Island power system must be prepared for it because it can be a problem. Therefore, this study proposes a voltage source-type MMC-HVDC system linked to mainland Korea to expand the wind power penetration limits of Jeju Island under the stable operation of the Jeju Island power system. To verify the effectiveness of the proposed scheme, computer simulations using the PSCAD/EMTDC program are conducted, and the results are demonstrated. The scenarios of the computer simulation consist of two cases. First, the MMC-HVDC system is operated under variable wind power in the Jeju Island power system. Second, it is operated under the predicted Jeju Island power system in 2020.

제주계통의 전압조정을 위한 MMC-HVDC 시스템 응용 (Application of MMC-HVDC System for Regulating Grid Voltage Based on Jeju Island Power System)

  • 왓나우덩;김일환;이도헌;김호찬
    • 전력전자학회논문지
    • /
    • 제19권6호
    • /
    • pp.494-502
    • /
    • 2014
  • This paper presents a control method of the modular multilevel converter - high-voltage direct current (MMC-HVDC) system to regulate grid voltage on the basis of the Jeju Island power system. In this case, the MMC-HVDC system is controlled as a static synchronous compensator (Statcom) to exchange the reactive power with the power grid. The operation of the MMC-HVDC system is verified by using the PSCAD/EMTDC simulation program. The Jeju Island power system is first established on the basis of the parameters and measured data from the real Jeju Island power system. This power system consists of two line-commutated converter - high-voltage direct current (LCC-HVDC) systems, two Statcom systems, wind farms, thermal power plants, transformers, and transmission and distribution lines. The proposed control method is then applied by replacing one LCC-HVDC system with a MMC-HVDC system. Simulation results with and without using the MMC-HVDC system are compared to evaluate the effectiveness of the control method.

전압형 HVDC에 의한 제주계통의 풍력한계용량 증대 방안 (An Strategy of Increasing the Wind Power Penetration Limit with VSC-HVDC in Jeju Power System)

  • 이승민;채상헌;김호민;김일환
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2015년도 전력전자학술대회 논문집
    • /
    • pp.461-462
    • /
    • 2015
  • The government on Jeju Special Self-governing Province has a policy named 'Carbon Free Island Jeju by 2030'. The main purpose in this policy is to install wind power system with the total capacity of 1.35 GW by 2020. When the demand load on Jeju Island power system is lower than entire output power, a lot of dump power will be produced from the large-scale wind farms. It will be able to cause the wind power limit on Jeju Island. Consequently, the additional power facility must be installed to ensure stable power system operation in Jeju Island and increase wind power limit. From this point, this paper proposes the installation of MMC-HVDC, which can supply power in real time in the desired direction. The effectiveness of MMC-HVDC based on measured data of Jeju Island power system will be verified by using PSCAD/EMTDC simulation program.

  • PDF

Analyzing Stability of Jeju Island Power System with Modular Multilevel Converter Based HVDC System

  • Quach, Ngoc-Thinh;Lee, Do Heon;Kim, Ho-Chan;Kim, Eel-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권1호
    • /
    • pp.47-55
    • /
    • 2015
  • This paper proposes the installation of a new modular multilevel converter based high-voltage direct current (MMC-HVDC) system to connect between mainland and Jeju island power systems in Korea in 2020. The purpose is to combine with two old line-commutated converters (LCC)-based HVDC system to achieve a stability of the Jeju island power system. The operation of the overall system will be analyzed in three cases: (i) wind speed is variable, (ii) either one of the LCC-HVDC systems is shutdown because of a fault or overhaul, (iii) a short circuit fault occurs at the mainland side. The effectiveness of the proposed control method is confirmed by the simulation results based on a PSCAD/EMTDC simulation program.

PSS/E를 이용한 제주계통의 DFIG 풍력발전단지 및 HVDC 동적모델 개발 (Development of Dynamic Models for DFIG Wind Farms and HVDC in Jeju Power System Using PSS/E)

  • 남순열;강상희;남해곤;최준호
    • 전기학회논문지
    • /
    • 제60권12호
    • /
    • pp.2183-2189
    • /
    • 2011
  • Since main portion of the required electric power in Jeju Island is provided from the mainland through two HVDC lines, Jeju HVDC has a most significant impact on Jeju power system. Average wind speed of Jeju Island is the highest among several candidates in South Korea. So, Jeju Island has been a suitable site for the construction of wind farms where several wind farms are now operating and several others to be sited. Since the large-scale wind generation could have adverse impacts on the stable operation of Jeju power system, wind power is also important for the stability of Jeju power system. Therefore, accurate modeling of Jeju HVDC and wind farms is required for stability analysis of Jeju power system. In this paper, PSS/E-based dynamic modeling of Jeju HVDC and DFIG wind farms is proposed. Model-writing technique of PSS/E is used to develop USRAUX model and USRMDL model for controlling the frequency of HVDC and imposing an operation limit of wind power, respectively. Dynamic characteristics of Jeju HVDC and DFIG wind farms are analyzed through the dynamic simulations. The simulation results show the effectiveness of the developed models for Jeju power system.

이벤트 스터디 기법을 이용한 제주 정전의 경제적 파급효과 분석 (Economic Analysis of Jeju Island Power System Outage Using Event Study)

  • 김진아;이재희;이종욱;주성관
    • 전기학회논문지
    • /
    • 제59권1호
    • /
    • pp.46-50
    • /
    • 2010
  • Power system outages can lead to huge economic losses for various industries. Jeju island power system outage in 2006 also caused significant social and economic impacts in Korea. There have been numerous attempts to evaluate the economic costs of power system outages. Power system outages can also have financial impacts on electric power industry. This paper attempts to analyze the economic impacts of the 2006 Jeju island power system outage on the values of the firms in the power industry using event study. Empirical analysis results are presented to show the economic impacts of the 2006 Jeju island outage on the values of the firms in the power industry.

육지-제주간 2차 HVDC SYSTEM 개요 (The Introduction of #2 HVDC SYSTEM)

  • 장석한;유승환;신명식;이규용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.107-109
    • /
    • 2008
  • Cheju-Haenam HVDC transmission system start it's commercial operation since 1998. JEJU island is supplied with it's about 45% of total electric power from main land with HVDC link. In JEJU island, the demand of electric power is growing every year. With a current power supply, electric power reserve rate will be below the recommended one. For a stable power supply to JEJU island, KEPCO start a construction of #2 HVDC transmission system. This report is for introduction and understanding of #2 HVDC system which will be installed between JEJU island and main land. This report includes a specification of converter station and DC cable. KEPCO expect that this system will solve the power supply problem and maximum wind power plant capacity problem as well.

  • PDF

PSCAD/EMTDC에 의한 직류연계선 오버홀시 제주계통의 전력품질 분석 (Power Quality Analysis of Jeju Power System during HVDC Overhaul using PSCAD/EMTDC)

  • 강보승;김재홍;김일환;김세호;오성보;송기혁
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2008년도 하계학술대회 논문집
    • /
    • pp.82-84
    • /
    • 2008
  • This paper presents the modeling and power quality analysis of Jeju island power system connected with wind farm, and thermal power plant. It is for indicating the influence of wind farm operation in steady and transient state in Jeju island power system during the HVDC system overhaul period. For the computer simulation, three kinds of main item are modeled, which are 67[MW] wind farm, thermal power plant and Jeju power load. To analyze the influence of the wind power generation to the Jeju power system, two kinds of simulations are carried out by using the PSCAD/EMTDC program. One is the steady state operation under the variable speed wind, and the other is the transient state operation when all of wind farms in Jeju island are disconnected from the Jeju power grid instantaneously on the rated power output. With the comparison of these results, it is useful for analyzing the power quality of Jeju power system versus wind power generation.

  • PDF

HESS가 연계된 상명풍력발전단지의 모델링과 해석 (Modeling and Analysis of Sangmyeong Wind Farm with HESS)

  • 신현;김일환
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2019년도 전력전자학술대회
    • /
    • pp.422-423
    • /
    • 2019
  • In accordance with the Carbon-Free Island by 2030 policy of Jeju Special Self-Governing Province, renewable energy sources are increasing in Jejudo Island. Due to the intermittent output characteristics of wind turbines, one of the renewable energy sources, which can cause unbalanced system conditions between the demand load and the power generation of Jejudo Island. The Korea Power Exchange limits the output of wind turbines for stabilizing the Jeju power system. Therefore, this paper proposes a method to supply a limited output of Sangmyeong Wind Farm in Jeju Power system to Energy Storage System(ESS) and Water Electrolysis Device(WED). The voltage and frequency fluctuation of the Jeju power system is checked accordingly. The simulation results are performed using the PSCAD/EMTDC program.

  • PDF