• Title/Summary/Keyword: JIT System

Search Result 151, Processing Time 0.025 seconds

Mixed-mode execution environment using the JNI (JNI를 사용한 혼합형 실행 환경)

  • Kim Sang-Hoon
    • The Journal of Information Technology
    • /
    • v.5 no.4
    • /
    • pp.35-44
    • /
    • 2002
  • The tradeoff of Java's portability is the inefficiency of interpretation. Also, the standard Java class library may not support the platform-dependent features needed by your application. Several solutions have been proposed to overcome these problems, such as JNI, JIT, off-line bytecode compilers. In this paper, we present an mixed-mode execution model which Java virtual machine executes together with native code. This execution model and its translator preserves the ability to dynamically load bytecode, and reduce the difficulties of JNI usages. Our system is more efficient than JIT, and helps programmer to write C implementation for the native method without the concept of JNI.

  • PDF

A Simulation Analysis of Productivity Increasement Effect of JIT System Application (JTL시스템 적용에 의한 생산성향상 효과의 시뮬레이션 분석)

  • 신현표;구일섭
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.115-121
    • /
    • 1995
  • The objective of this study is to develope an effectiveness measurement technique for U-shaped JIT production line by computer simulation. A small and medium sized automobile brake master cylinder manufacturing plant is studied for productivity improvement The production line is analysed and improved by applying Low Cost Automation, special jigs and fixtures, and facilities layout changes. An experimental simulation model is built using SIMAN(SIMulation ANalysis) simulation software for the production system analysis.

  • PDF

Understanding and Implementation Strategy of Tact Time, Pitch Time and Cycle Time (택트타임, 피치타임, 사이클타임의 이해와 적용방안)

  • Choe, Seong-Un
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.557-561
    • /
    • 2011
  • The study proposes three types of production lead time according to the production or demand pattern. First of all, it discusses the difference of three lead times. While pitch time and cycle time are used in push system with process stock and mass conveyor production, the tact time is used in pull system like as JIT based lean production system.

  • PDF

A Study on the Optimal Design of JIT Kanban System under Uncertain Environment (불확실한 환경하에서의 JIT 간판 시스템 최적설계에 관한 연구)

  • 김용범;김우열
    • Journal of the military operations research society of Korea
    • /
    • v.24 no.1
    • /
    • pp.176-188
    • /
    • 1998
  • In this paper, it is identified that the optimal level of each performance measures (service and inventory level) is not sensitive to an uncertain environment under JIT Kanban system designed by Moeeni. Moreover, it is proposed that the optimal design method considering multiple performance characteristics is the optimal level decision method according to the relative importance differences of each performance when there exist multiple performance characteristics. The result from the simulation analysis shows that the number of Kanban for stage 3 (final process) and stage 2 is increased at the service level. It is found that the expected loss is minimal when the cycle time decreases and the container size increases. However, the stage 1 is not affected by the number and cycle time of Kanban. It is thus important to consider carefully the cycle time and the container size of the Kanban to satisfy the demand in right time. In case of inventory level, the working inventory level decreases when the container size is decreased and the working inventory level also decreases slightly when the cycle time of the Kankban is increased in stage 1 and 2.

  • PDF

Strategy of Inventory and Inspect of small-to-medium-sized Enterprises which are getting Orders from Large Enterprises using JIT(just in time) System (JIT형의 기업에 납품하는 중소기업의 재고 및 검사 전략)

  • Ree, Sang-Bok;Ahn, Hae-Il;Kim, Kuk
    • IE interfaces
    • /
    • v.13 no.4
    • /
    • pp.584-590
    • /
    • 2000
  • In this paper, we analyze the inventory and inspect cost of small-to-medium-sized enterprises which are getting orders from large enterprises using JIT(just in time) system. So far, we have not found the good inventory and inspect cost formula for the small-to-medium-sized enterprises. In this paper, we first survey the inventory and inspect strategy and cost formula of the small-to-medium-sized enterprises in this country. We are trying to mathematical modelling of several cases depending on the inventory and inspect strategy of large enterprises. We suggest inventory and inspect several cost formula by using the method minimizing the total cost of the small-to-medium-sized enterprises. We also give some numerical examples for your understanding.

  • PDF

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

The Improvement Plans for Material Flow and Productivity Improvement of Low-e Double Glazing on Site (Low-e 복층유리의 현장 내 물류흐름 파악 및 생산성 향상을 위한 개선안 방향)

  • Lee Sang-Hyuk;Lim Myung-Bok;Lee Jae-Sung;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2003
  • There are many problems in management of high-rise building construction performed in downtown area due to limited spaces and equipments for increasing kinds and quantities of material. By these restrictions, problems such as increase of construction cost. delay of construction period, decrease of productivity, occurrence of accident are caused. Recently, studies on JIT concept have focused on construction materials as a solution for the problems. But, studies about finishing material are insufficient yet. Accordingly, this study suggests flowing of current material management, JIT management effect, and development direction of lifting-up and procurement system with Low-emissivity double Glazing, among of main finishing materials.

  • PDF

Scheduling of a Casting Sequence Under Just-In-Time (JIT) Production (적시 생산 방식에서의 주조공정 스케줄링)

  • Park, Yong-Kuk;Yang, Jung-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.3
    • /
    • pp.40-48
    • /
    • 2009
  • In this article, scheduling of a casting sequence is studied in a casting foundry which must deliver products according to the Just-in-time(JIT) production policy of a customer. When a foundry manufactures a variety of casts with an identical alloy simultaneously, it frequently faces the task of production scheduling. An optimal casting schedule should be emphasized in order to maximize the production rate and raw material efficiency under the constraints of limited resources; melting furnaces and operation time for a casting machine. To solve this practical problem-fulfilling the objectives of casting the assigned mixed orders for the highest raw material efficiency in a way specified by the customer's JIT schedule, we implement simple integer programming. A simulation to solve a real production problem in a typical casting plant proves that the proposed method provides a feasible solution with a high accuracy for a complex, multi-variable and multi-constraint optimization problem. Employing this simple methodology, a casting foundry having an automated casting machine can produce a mixed order of casts with a maximum furnace utilization within the due date, and provide them according to their customer's JIT inventory policy.

SUCCESS FACTORS FOR JIT MANAGEMENT OF PRIMARY COMMODITY SUPPLY CHAINS IN AUSTRALIA

  • Kim, Tae-Ho;Malcolm Wegener
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.191-201
    • /
    • 2004
  • Supply chains for agricultural commodities with their various constraints such as production lead time, seasonal production, and methods of storage are limited in the extent to which techniques like Just-in-Time (JIT) inventory management can be applied. It is beyond the ability of producers to control harvest time and many agricultural products are perishable so that they can incur exceptional losses in storage if they are not handled correctly. This is a source of additional costs and inefficiency in supply chain management. The purpose of this study is to reduce or eliminate such sources of loss and inefficiency and to identify success factors for the JIT inventory management system where it can be applied for agricultural products. Where ]IT techniques can be applied in supply chain management for agricultural products, costs such as transportation, inventory, and storage losses can be reduced with concurrent increases in efficiency. In the paper, some of the problems associated with applying ]IT inventory control methods in supply chain management for agricultural commodities will be reported through a series of case studies.

  • PDF

A Simulation Analysis of JIT System with Uncertainty Situation (불안정한 생산환경하에서의 시뮬레이션에 의한 JIT시스템 수행도 평가)

  • 박성미;남상진;김정자
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.155-162
    • /
    • 1994
  • The Japanese "Just-In-Time" technique reduces inventory and unnecessary factors. This technique makes the success of Japanese firms, therefore many Korean firms try to apply it to their situation. But the technique doesn't bare the same success in Korean firms. This paper, therefore, considers the different situations between Korean rim and Japanese firm, then simulates the Pull system and Push system for a multiline, multistage production system. This paper drives the different results of simulation according to variable processing times, variable demand, set-up time and shortages in Pull system and Push system using GPSS. The results show that the performance of Pull system is lower than Push system's in variable master production scheduling and variable processing times.ing times.

  • PDF