In recent years the human impact on the environment becomes increasing lift threatening, calls for the better management of resources. In field of water quality of river flow, the best way to conserve water quality is specific efforts to control the pollutant loadings and treat the loadings in the basin to reduce the discharge of pollutant loadings to river. But in general the water quality influenced by the dam discharge. Especially in dry season, it is more dominant way to improve the water quality which contaminated with the pollutant loadings from the basin. The dam discharge amounts of the 2 dams in the Keum River that maintain the down stream water quality were estimated for the year of 1999, 2001, 2006, 2011, in case of irrigation and non-irrigation seasons. The pollutant loadings for the basin are estimated with the planning of treatment plants construction schedule for every sub-basins. The river flow rates were considered low flow as 2.33 year low flow and 10 year low flow. The QUAL2E model was used as a tool of simulation.
Journal of The Korean Society of Agricultural Engineers
/
v.51
no.4
/
pp.1-6
/
2009
This study analyzed and evaluated the effect of agricultural water reduction by introducing automated agricultural water management using alternative cost approach. The approach is possible to evaluate none market property as an asset. The saved agricultural water was evaluated as none market property. As the alternative goods, Seongju and Donghwa dam, typical irrigation dams in domestic, were employed. The economic benefit from water saving effect of an automated agricultural water management was calculated as depreciation expense and maintaining cost of construction agricultural dam per saved agriculture water. As a result, the saved agriculture water was 8.5 million ton per year, and the economic benefit of it was $1.3{\sim}2.1$ million won.
Magazine of the Korean Society of Agricultural Engineers
/
v.45
no.6
/
pp.109-118
/
2003
As a fundamental research to establish a safety operation plan for irrigation dams, this study presents hydrologic analysis conducted in Sungju Dam watershed based on various rainfall data. Especially those reservoirs without flood control feature are widely exposed to the risk of flooding, a safe and optimized operation program need to be improved against arbitrary flooding. In this study, reservoir routing program was developed and simulated for reservoir runoff estimation using WMS hydrology model. The model simulated the variations of reservoir elevation under the condition of open or closed emergency gate. In case of closed emergency gate, water surface elevation was given as 193.15 m, and this value exceeds the dam crest height by 1.65 m. When the emergency gate is open, the increment of water surface elevation is given as 192.01 m, and this value exceeds dam crest height by 0.57 m. As an alternative plan, dam height increase can be considered for flood control under the PMP (Probable Maximum Precipitation) condition. Since the dam size is relatively small compare to the watershed area, sound protection can be expected from the latter option rather than emergency gate installation.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.24-24
/
2023
This presentation highlights the IAHR book, recently published last April, of which the author is the editor-in-chief, on the historical water projects and traditional water technologies of international interest in the Asian region, addressing information on past water projects (mostly before the 20th century) in the regions that are technically and culturally of interest and educationally valuable. The book explores historical water projects in these regions, presenting technologies used at the time, including calculation and forecasting methods, measurement, material, labor, methodologies, and even water culture. Through this book, it is expected that the old Asian wisdom of "reviewing the old and learning the new" would be realized to a certain extent in modern planning and practice of water projects. The book comprises a lead article that the presenter authored and five Parts representing China, Japan, Korea, South Asia, and Southeast Asia, respectively, followed by an invited one from Uzbekistan. Throughout the book, it is found that historically the Asian monsoon, affecting the Indian subcontinent and Southeast and East Asian regions, induced rice cultivation. It fundamentally needs proper irrigation systems, including reservoirs (dams) and canals, water wheels, and even rain gauges. Flood risks have been more common in Asia than Europe under this climate condition, as recognized in history. To utilize and sometimes overcome these climate conditions, people built and managed many historical and grandiose water projects and invented and used localized but sophisticated water-related technologies in the Asian region.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.30-30
/
2023
This study aims to establish the multi-reservoir operation system model in the Upper Mun River Basin which includes 5 main dams namely, Mun Bon (MB), Lamchae (LC), Lam Takhong (LTK), Lam Phraphoeng (LPP), and Lower Lam Chiengkrai (LLCK) Dams. The knowledge and AI technology were applied aiming to develop innovative prototype for SMART dam-reservoir operation in future. Two different sorts of reservoir operation system model namely, Fuzzy Logic (FL) and Constraint Programming (CP) as well as the development of rainfall and reservoir inflow prediction models using Machine Learning (ML) technique were made to help specify the right amount of daily reservoir releases for the Royal Irrigation Department (RID). The model could also provide the essential information particularly for the Office of National Water Resource of Thailand (ONWR) to determine the short-term and long-term water resource management plan and strengthen water security against flood and drought in this region. The simulated results of base case scenario for reservoir operation in the Upper Mun from 2008 to 2021 indicated that in the same circumstances, FL and CP models could specify the new release schemes to increase the reservoir water storages at the beginning of dry season of approximately 125.25 and 142.20 MCM per year. This means that supplying the agricultural water to farmers in dry season could be well managed. In other words, water scarcity problem could substantially be moderated at some extent in case of incapability to control the expansion of cultivated area size properly. Moreover, using AI technology to determine the new reservoir release schemes plays important role in reducing the actual volume of water shortfall in the basin although the drought situation at LTK and LLCK Dams were still existed in some periods of time. Meanwhile, considering the predicted inflow and hydrologic factors downstream of 5 main dams by FL model and minimizing the flood volume by CP model could ensure that flood risk was considerably minimized as a result of new release schemes.
Proceedings of the Korea Water Resources Association Conference
/
2005.05b
/
pp.1471-1475
/
2005
현재 우리나라 관개용 댐의 농업용수는 논관개 용수를 위주로 하여 하천유지용수, 생활용수, 축산용수를 주 공급량으로 산정하고 있다. 그러나 극히 일부를 제외하고 밭에 대한 관개용수를 산정하여 공급하는 경우가 거의 없으며, 실제 현장에서도 수원공으로부터 체계적인 용수공급이 아닌 필요한 곳에 관정 등을 설치하여 지하수를 사용하고 있다. 본 연구에서는 밭관개 용수의 확보를 위하여 관개용 댐의 저수를 기간별로 관리모의 하였다. 이를 통해 용수의 신규 개발이 아닌 기존 용수의 저수 관리를 통하여 용수의 이용효율을 높일 수 있도록 하였다. 우리나라의 대표적 관개용 댐인 성주댐과 동화댐을 대상지구로 하여 논관개 용수와 같은 정상적 용수 공급에 영향을 주지 않으며, 추가적인 용수를 확보할 수 있도록 하였다. 이상의 결과론 성주지역 주요 밭작물 필요수량은 충분히 확보할 수 있었으며, 동화지역의 경우도 1998년과 2001년 같은 극심한 가뭄년을 제외하고 추가공급 가능량이 발생하는 것으로 분석되었다.
Proceedings of the Korea Water Resources Association Conference
/
2004.05b
/
pp.1228-1232
/
2004
일반적으로 관개용 댐은 예비 방류기능이 부족하므로 저수지관리를 위한 수위 조절이 장시간에 걸쳐 계획적으로 이루어 져야한다. 본 연구는 성주유역을 내상으로 장기 물수지 분석과 빈도분석을 실시하여 관개용 댐의 기간별 적정 수위를 모의하였다. 현장에서 적용이 가능하도록 저수위 관리 기간을 4단계로 나누어 자기간의 관리 방법과 적정 수위를 제시하였다. 홍수기 전에는 수위를 낮추어 홍수를 대비할 수 있도록 하였으며, 홍수기 이후에는 이듬해 관개기 전까지 동계 만수위를 확보할 수 있는 수위와 연중 유지해야 하는 최저수위를 산정하였다. 이상의 결과로 $1998\~2002$년에 내하여 적용해본 길과, 관개기전 동계 만수위를 유지하였고, 물 부족 기간은 발생하지 않았으며, 2001년 가뭄과 2002년 태풍에 대한 피해를 최소화 할 수 있었다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.3
/
pp.407-416
/
2016
The purpose of this study is to develop regional regression models to estimate mean low flow for ungauged basins. The unregulated streamflow data observed at 12 multipurpose dams and 4 irrigation dams were analyzed for determining mean low flows. Various types of regression models were developed using the relationship between mean low flows and various sets of watershed characteristics such as drainage area, average slope, drainage density, mean annual precipitation, runoff curve number. The performance of each regression model for estimating mean low flows was assessed by comparison with the results obtained from the observed data. It was found that a regional regression model explained by drainage area, the mean annual precipitation, and runoff curve number showed the best performance. The regression model presented in this study also gives better estimates of mean low flow than the estimates by the drainage-area ratio method and the previous regression model.
Chung, Se-Woong;Yoo, Ji-Su;Park, Hyung-Seok;Schladow, S. Geoffrey
Journal of Korean Society on Water Environment
/
v.32
no.5
/
pp.433-441
/
2016
Many large dams have been constructed for water supply, irrigation, flood control and hydropower in Korea for the last century. Meanwhile, recent studies indicated that the artificial reservoirs impounded by these dams are major sources of carbon dioxide (CO2) to the atmosphere and relevant to global budget of green house gases. However, limited information is available on the seasonal variations of CO2 evasion from the reservoirs located in the temperate monsoon regions including Korea. The objectives of this study were to estimate daily Net Atmospheric Flux (NAF) of CO2 in Daecheong Reservoir located in Geum River basin of Korea, and analyze the influencing parameters that characterize the variation of NAF. Daily pH and alkalinity (Alk) data collected in wet year (2012) and dry year (2013) were used for estimating the NAFs in the reservoir. The dissolved inorganic carbon (DIC) was computed using the pH and Alk measurements supposing an equilibrium state among the carbonate species. The results showed seasonal variations of NAF; negative NAFs from May to October when the primary production of the reservoir increased with water temperature increase, while positive NAF for the rest of the period. Overall the reservoir acted as sources of CO2 to the atmosphere. The estimated NAFs were 2,590 and 771 mg CO2 m-2d-1 in 2012 and 2013, respectively, indicating that the NAFs vary a large extent for different hydrological years. Statistical analysis indicated that the NAFs are negatively correlated to pH, water temperature, and Chl-a concentration of the reservoir.
Proceedings of the Korea Water Resources Association Conference
/
2012.05a
/
pp.11-17
/
2012
The Waikato River is New Zealand's longest River, though relatively small on international scales. It drains the central North Island and has New Zealand's largest lake (Lake Taupo) at its headwaters. The upper reaches have sustained flows fed by large aquifers which are recharged by rainfall events providing relatively constant river flows, whereas the lower reaches respond more directly to rainfall events having more peaky flows after rainfall and extreme low flows during dry periods. Consumptive allocation from the river is relatively low with only about 3% of the mean annual flow being allocated. However, more than seven times the river's flow is allocated for non-consumptive purposes before discharging to the Tasman Sea. The majority of this non-consumptive allocation is for hydro power generation and as cooling water at both thermal and geothermal power stations which produce up to 25% of New Zealand's electricity. The upper half of the river has been heavily modified with the construction of eight dams for power generation. This has resulted in a succession of cascading dams replacing the previously uncontrolled river. The Waikato River also provides drinking water for Auckland City (NZ's largest city) and Hamilton City (NZ's 4th largest city). In recent years there has also been considerable growth in water requirements for pasture irrigation to support the intensification of dairy farming in the catchment. Operators of the power stations are concerned that any further consumptive allocation will further reduce their ability to generate electricity. The Waikato Regional Council, who is charged with managing the river and allocation of water, has recently set new rules for managing the conflicting allocation demands on the Waikato River. This has resulted in an end to further allocation of water where it results in a loss of water for electricity generation from renewable resources (fresh water and geothermal water). The exception to this is the prioritisation of water for municipal supplies ahead of other consumptive uses such as industries and irrigators.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.