• 제목/요약/키워드: Inventory Cycle

검색결과 267건 처리시간 0.023초

철도산업과 전과정평가(LCA) (Railway industry and Life Cycle Assessment(LCA))

  • 정인태;양윤희;이건모;김용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.1028-1032
    • /
    • 2005
  • Life cycle assessment(LCA) has been developed from the concept of life cycle thinking. Life cycle thinking implies that everyone in the whole chain of a product's life cycle, from cradle to grave, has a responsibility and a role to play, taking into account all the relevant external effects. LCA is an analytical tool for identifying environmental loads and assessing the environmental impact in the whole chain of a product's life cycle. In Europe and Japan, LCA and ecodesign study for railway industry have been actively carried out recently. However, LCA for railway industry in domestic is still infant. LCA is standardized in International Organization of Standardization(ISO), base on the ISO 14040 standards, 307 life cycle inventory(LCI) database for infrastructure and base materials have been established in total since 1999. Some of LCI database can use in performing LCA for trains and railway infrastructure, but still not enough to derive accurate LCA result. Therefore, railway oriented LCA methodology and LCI DB are needed to be developed.

  • PDF

우리나라 해운기업의 운전자본관리와 수익성과의 관계에 관한 실증연구 (The Relationship between Working Capital Management and Profitability : evidence from Korean Shipping Industry)

  • 이성윤
    • 한국항해항만학회지
    • /
    • 제39권3호
    • /
    • pp.261-266
    • /
    • 2015
  • 기업의 운전자본관리는 단기재무전략관리 차원에서 접근이 가능하며, 이는 기업의 유동성 및 수익성 등에 영향관계가 있음이 실증되고 있다. 따라서 효율적인 운전자본관리는 기업의 수익성을 증대시킬 수 있을 뿐만 아니라, 유동성 또한 개선시킬 수 있게 된다. 해운기업의 경우 글로벌금융위기와 맞물려 수익성과 유동성에 많은 어려움을 겪었음에도 불구, 운전자본관리와 수익성에 대한 연구는 전무한 상태이다. 이에 본 연구에서는 2004년 이후 46개 해운기업을 대상으로 운전자본관리와 수익성과의 관계를 규명함으로써 단기재무전략 수립에 유용한 정보를 제공하고자 하였다. 연구의 결과 기존연구들과 같이 매입채무기간, 재고기간, 현금주기, 영업주기가 해운기업의 수익성 즉, 매출액 총이익률과 매출액영업이익률을 개선할 수 있는 중요한 요인인 것으로 실증되었다. 특히 매입채무신용기간과 영업주기의 증가는 수익성의 증가를 가져오는 것으로 분석된 반면, 재고기간과 현금주기는 부(-)의 관계를 보여 이들이 줄어들 경우 수익성이 증가하는 것으로 나타났다. 매출채권기간은 일부 모형에서 유의하였으나, 기존 연구들과는 달리 해운기업의 경우 수익성과의 관계를 설명하기에는 한계가 있는 것으로 나타났다.

병원경영의 위험요인이 운전자본 관리에 미치는 영향 (Effect of Risk Factors on the Management of Working Capital in Hospital Management)

  • 하오현
    • 융합정보논문지
    • /
    • 제10권8호
    • /
    • pp.187-193
    • /
    • 2020
  • 본 연구는 우리나라 종합병원을 대상으로 경영의 위험요인이 운전자본 관리에 어떻게 영향을 미치는지를 분석하였다. 자료는 의료기관회계정보공시 시스템을 이용하여 271개 종합병원 3개연도(2016년, 2017년, 2018년)의 회계정보를 이용하였다. 도입변수는 종속변수로 운전자본 수준과 현금순환주기, 독립변수로 운영위험과 시장위험, 통제변수로 운전자금 구성요인(현금, 매출채권, 재고자산, 매입채무)을 선정하였다. 연구결과, 우리나라 종합병원들은 운영위험이 낮을수록 운전자본 수준은 높았으며, 운전자본 결정에는 운영위험, 현금, 재고자산, 매입채무가 작용하는 것으로 확인되었다. 그리고 시장위험(의료이익률)이 낮을수록 현금순환주기가 높았다는 것을 알 수 있었다. 따라서 의료기관들도 운영의 특수성을 고려하여 경기대응능력을 갖출 수 있도록 운전자본 결정요인으로 확인된 운영위험, 현금, 재고자산, 매입채무의 적절한 관리방안에 대한 검토의 필요성이 제기된다.

방사성폐기물 신분류기준을 고려한 중저준위 방사성폐기물 처분시설의 핵종재고량 예측 (Prediction of Radionuclide Inventory for the Low- and Intermediate-Level Radioactive Waste Disposal Facility by the Radioactive Waste Classification)

  • 정강일;정노겸;문영표;정미선;박진백
    • 방사성폐기물학회지
    • /
    • 제14권1호
    • /
    • pp.63-78
    • /
    • 2016
  • To meet nuclear regulatory requirements, more than 95% individual radionuclides in the low- and intermediate-level radioactive waste inventory have to be identified. In this study, the radionuclide inventory has been estimated by taking the long-term radioactive waste generation, the development plan of disposal facility, and the new radioactive waste classification into account. The state of radioactive waste cumulated from 2014 was analyzed for various radioactive sources and future prospects for predicting the long-term radioactive waste generation. The predicted radionuclide inventory results are expected to contribute to secure the development of waste disposal facility and to deploy the safety case for its long-term safety assessment.

LCA 기법을 활용한 합류식 하수도 월류수 사업의 잠재적 환경영향 저감효과 분석 (An Analysis of Potential Environmental Impact Reduction for Combined Sewer Overflow Project using a LCA Methodology)

  • 조현정;송장환;황용우;박지형
    • 상하수도학회지
    • /
    • 제25권6호
    • /
    • pp.885-892
    • /
    • 2011
  • In this study, LCA(Life Cycle Assessment) on 'Saemangum CSO Project' was carried out to evaluate environmental impact which occurred during the construction and operation periods and the potential environmental impact reduction was analyzed by comparing production and reduction level of pollution loads. LCA was conducted out according to the procedure of ISO14040 which suggested Goal and Scope Definition, Life Cycle Inventory Analysis, Life Cycle Impact Assessment and Interpretation. In the Goal and Scope Definition, the functional unit was 1 m3 of CSO, the system boundary was construction and operation phases, and the operation period was 20 years. For the data collection and inventory analysis, input energies and materials from civil, architecture, mechanical and electric fields are collected from design sheet but the landscape architecture field is excepted. LCIA(Life Cycle Impact Assessment) was performed following the procedure of Eco-Labelling Type III under 6 categories which were resource depletion, eutrophication, global warming, ozone-layer destruction, and photochemical oxide formation. In the result of LCA, 83.4% of environmental impact occurred in the construction phase and 16.6% in the operation phase. Especially 78% of environmental impact occurred in civil works. The Global warming category showed the highest contribution level in the environmental impact categories. For the analysis on potential environmental impact reduction, the reduction and increased of environmental impact which occurred on construction and operation phases were compared. In the case of considering only the operation phase, the result of the comparison showed that 78% of environmental impact is reduced. On the other hand, when considering both the construction and operation phases, 50% of environmental impact is increase. Therefore, this study showed that eco-friendly material and construction method should be used for reduction of environmental impact during life cycle, and it is strongly necessary to develop technology and skills to reduce environmental impact such as renewable energies.

역주문을 고려한 공정-저장조 망구조의 최적설계 (Optimal Design of Process-Inventory Network Considering Backordering Costs)

  • 이경범
    • 제어로봇시스템학회논문지
    • /
    • 제20권7호
    • /
    • pp.750-755
    • /
    • 2014
  • Product shortage which causes backordering and/or lost sales cost is very popular in chemical industries, especially in commodity polymer business. This study deals with backordering cost in the supply chain optimization model under the framework of process-inventory network. Classical economic order quantity model with backordering cost suggested optimal time delay and lot size of the final product delivery. Backordering can be compensated by advancing production/transportation of it or purchasing substitute product from third party as well as product delivery delay in supply chain network. Optimal solutions considering all means to recover shortage are more complicated than the classical one. We found three different solutions depending on parametric range and variable bounds. Optimal capacity of production/transportation processes associated with the product in backordering can be different from that when the product is not in backordering. The product shipping cycle time computed in this study was smaller than that optimized by the classical EOQ model.

Designing an Inventory Model of Parallel-Type Distribution System

  • Kwon, Hee Chul;Kim, Man Shik
    • 품질경영학회지
    • /
    • 제17권1호
    • /
    • pp.11-18
    • /
    • 1989
  • A one-upper level warehouse n-Iower level retailer inventory distribution model is discussed. This paper presents the parallel-type inventory structure using an order-up-to-level invertory control system for analyzing the approximation of the expected units back ordered and the measure of service. We find that the total expected backorder units in system can substitute the expected back orders in the last two periods for the expected back orders in total periods. The rate of total expected back orders which is the measure of disservice, is given by dividing the improved units of total expected backorder into the total demand during an order cycle. The average annual total cost in system is obtained by considering the results, but from the viewpoint of this study the cost analysis is not described.

  • PDF

상습관(常習慣)에 의한 재고금리(在庫金利)를 고려한 기본(基本)싸이클 스케쥴링 방식(方式)의 생산계획(生産計劃) (A Study on the Basic Cyclic Scheduling Problem)

  • 박승헌
    • 대한산업공학회지
    • /
    • 제15권2호
    • /
    • pp.1-10
    • /
    • 1989
  • This paper deals with a single-facility multiproduction model concerning the basic cyclic scheduling. The aim is to obtain the production order of each product in a cycle and the cycle frequency for minimizing the setup costs and inventory carrying costs of all products. The problem is formulated by LP and it shows that the optimal solution derived dominates the solution of non-cyclic scheduling model on some conditions.

  • PDF

소규모 제조기업의 효율적 재고관리를 위한 재고속성에 관한 연구 (A Study on the Properties of Inventory for Efficient Inventory Control at Small-scale Manufacturing Company)

  • 김기범;남곤;정용문;허세민
    • 한국산학기술학회논문지
    • /
    • 제21권12호
    • /
    • pp.449-455
    • /
    • 2020
  • 재고관리는 고객주문에 대한 대응수준을 결정짓는 중요한 관리항목 중의 하나이다. 고객의 니즈가 다양화해짐에 따라 생산하는 품목의 수가 증가하고 제품 수명주기가 단축됨에 따라 제조기업에 있어 재고관리의 중요성은 높아지고 있다. 그러나 소규모 제조기업에 있어 재고관리를 위해 IT시스템에 투자하는 것은 현실적으로 어려운 부분이 많다. 이에 본 연구에서는 소규모 제조기업에서 쉽고 빠르게 적용할 수 있는 재고관리 방법론을 다루고자 한다. 우선 재고속성의 개념을 정의하고, 재고의 월령과 수량에 따라 양성과 악성으로 구분할 수 있는 분석 방법론을 제안한다. 다음으로 재고속성에 따라 제품 보관 창고 내의 위치를 관리하기 위한 기준을 제안한다. 그리고 인테리어 벽지 제조기업을 대상으로 제안한 방법론을 적용함으로써 기존의 재고관리 방식의 비효율성을 인식하고, 재고관리에 대한 새로운 기준을 세울 수 있음을 검증한다. 본 연구에서 제안한 재고관리 방법론은 소규모 제조기업의 현장개선 활동의 일환으로 즉시 적용할 수 있는 관리 항목으로, 재고관리 활동을 통해 장기재고로 인한 낭비요인을 줄이고 창고의 여유 보관용량을 확보할 수 있을 것으로 기대한다.