AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

Market Expansion Strategies for Small or Medium-sized Construction Companies by Developing Quantitative Risk Assessment Model

  • Yoo, Jinhyuk;Koh, Seungyoon;Seo, Induck;Cha, Heesung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.742-743
    • /
    • 2015
  • Korean construction industry has developed with national economy growth for a couple of decades. However, because of slump of real estate, the domestic construction industry was intimidated. In this situation, many construction company has no choice but to go abroad to find construction projects. However, almost small or medium-sized construction companies are very hard to operate their business because they have small funding ability and weak labor power. Therefore, this study aims to propose an assessment tool through analyzing risk factors of overseas construction projects for small or medium-sized companies by examining preceding research and interviewing industry experts. Weights of the risk factors are determined through the surveys of the industry practitioners. All of the data is configured into the assessment tool and this converts the quantitative information which leads to the optimal of strategies choice. This paper provides a quantitative measurement of possible performance and detailed assessment of each itemized risk factors. This assessment tool is qualified for industry experts so that it can safely be applied to the future projects. Ultimately, many small or medium sized construction companies will benefit from the tool proposed in this study to examine the potential of the overseas market expansion.

  • PDF

건설 사업에서 FIDIC 규정의 분쟁해결 방법 (The Dispute Resolution Method on The FIDIC Form of Construction Projects)

  • 이무종
    • 한국중재학회지:중재연구
    • /
    • 제16권2호
    • /
    • pp.239-264
    • /
    • 2006
  • Globalization of business activities and the market is making intern ational movement of capital much freer. Therefore the introduction of global standard is inevitable. Each and every country has had its own standard which restrain free exchange and cause misunderstanding and conflict between countries. A country or a company which is not capable of meeting the global standard can not be accepted in the global market. Consequently, it will eventually be left behind. It is right to say that countries and companies should accept the global standard and abide by it to survive in the competitive global market. The following preface which was introduced in the international conference co_organised by BAC, FTCTC and Tsinghua University in May, 2004 shows a timely movement for the globalization of construction business. *B A C, Beijing Arbitration Commission *FTCTC, The FIDIC-Tsinghua-CNAEC Training Center *CNAEC, China National Association of Engineering Consultants Introduction, As arbitration becomes more and more popular in the ways of alternative disputes resolution all over the world, the BAC is devoted to promoting international arbitration in China. As FIDIC contracts constitute an accepted point of reference for international construction contract, the BAC, characteristic of construction projects, is willing to facilitate the FIDIC contracts as the referred construction contracts in China. In order to carry out its purposes, the BAC, together with FTCTC is going to convene for discussion of dispute resolution and arbitration of international construction projects. FIDIC, construction contract management guide, explains arbitration as the ultimate dispute resolution method. The detail of FIDIC will be suggested in this essay.

  • PDF

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

Project Learning Enablers within Fragmented Construction Projects

  • Alashwal, Ali Mohammed
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.588-592
    • /
    • 2015
  • Many studies have affirmed a negative influence of fragmentation on learning and knowledge sharing in construction projects. However, the literature overlooked enablers of learning within this context. The purpose of this paper is to explore the factors that facilitate project learning and ways to negate any unbecoming effects of fragmentation. Qualitative study used to explore the enablers through interviews administered to 11 top management individuals working in different construction projects in Malaysia. The findings revealed the following factors: participation, relationships, togetherness, and roles of project leader and coordinator. The role of boundary objects was also highlighted including information technology (IT), contract and procedures, drawings, specifications, and reports. The outcome of this paper initiates the development of a model for better knowledge creation and sharing in construction projects. The significance of this model stems from its ability to connection both the characteristics of construction project and project learning theories using the enablers. It is envisaged that future work will be to confirm the model in a quantitative study.

  • PDF

글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구 (A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment)

  • 양명덕;김창권;양재웅
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.