Identification of Critical Success Factors (CSFs) for Public-Private Partnerships Across Infrastructure Sectors

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.83-90
    • /
    • 2022
  • Public-private partnerships (PPP) projects are becoming popular in both developed and developing countries due to their ability to access new financing sources and transfer certain project risks to the private sector. PPP has been an active research area where the concept of Critical Success Factors (CSF) is often discussed by researchers. This study aims to identify the CSFs for various PPP infrastructure projects that have been explored in previous CSF studies. This article reviewed the literature about CSF in PPP projects from the years 2002 to 2021, compared the findings of studies regarding the identified CSFs, and consolidated the CSFs that can be applied to various PPP infrastructure projects. The results showed that dominant research focused on general infrastructure, where CSFs can be applied to all infrastructure sectors rather than any specific sector. The most identified CSFs from the study are favorable and efficient legal frameworks, appropriate risk allocation and sharing, a robust and reliable private consortium, a competitive and transparent procurement process, and political support and stability. The findings from the study can provide an overview of CSFs that are relevant to specific PPP infrastructure sectors like building infrastructure, transportation, water, etc. as well as for general infrastructure. In addition, the results can also be used for further empirical analysis.

  • PDF

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

MODIFIED SIMULATED ANNEALING ALGORITHM FOR OPTIMIZING LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS

  • Po-Han Chen;Seyed Mohsen Shahandashti
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.777-786
    • /
    • 2007
  • This paper presents a modified simulated annealing algorithm to optimize linear scheduling projects with multiple resource constraints and its effectiveness is verified with a proposed problem. A two-stage solution-finding procedure is used to model the problem. Then the simulated annealing and the modified simulated annealing are compared in the same condition. The comparison results and the reasons of improvement by the modified simulated annealing are presented at the end.

  • PDF

WHEN CM AT RISK MEETS VIRTUAL DESIGN AND CONSTRUCTION (VDC) IN CONSTRUCTION PHASE: CASE STUDY OF PRACTICIES IN U.S.

  • Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.566-572
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.

  • PDF

SEARCHING FOR KNOWLEDGE IN THE CONSTRUCTION EXTENSION TO THE PMBOK GUIDE (THIRD EDITION)

  • F. Zhang;J. Zuo;S. Pullen;George Zillante
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.93-98
    • /
    • 2011
  • The application of knowledge management concepts as a way to improve project success is an emerging topic for project management researches around the world. The Construction Extension to the PMBOK® Guide Third Edition documents the knowledge and practices that are generally recognized as good practices for managing engineering and construction projects. However, it is not unusual to see that engineering and construction projects suffer from poor performance. Based on a critical literature review, a theoretical framework is developed for the application of knowledge management in engineering and construction projects. This framework is subsequently applied as a lens to examine the construction extension to the PMBOK® Guide, aiming to identify the key characteristics of knowledge management in this standard. This research also aims to highlight those aspects of the construction extension to the PMBOK® Guide that can be improved from the knowledge management perspective. Recommendations are made to improve this standard by means of applying knowledge management concept so that better project outcomes can be achieved.

  • PDF

A COMPARATIVE STUDY OF DELAYS FACTORS IN PROJECT COMPLETION IN LIBYA AND UK CONSTRUCTION INDUSTRY

  • Shebob, A;Dawood, N; Xu, Q
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.614-620
    • /
    • 2011
  • Delays in completing construction projects have significant financial and social impact to all parties involved in the construction process and in particular in developing countries. This is very evident in most construction projects in Libya and in both public and private sectors. The research study was initiated by Libyan Government and the main aim of the project is to develop a new strategy in reducing the impact of delay factors. In order to achieve this, a number of objectives have been set-to conduct a comprehensive literature survey, to conduct a comparative study of the delay factors in project completion in both Libya and UK using semi structured questionnaire and finally, to identify and analyse the causes of delay and ranked them using frequency of occurrence and severity. The critical causes of delay for construction projects were quite different between Libya and UK. For the former, the most critical causes of delay in Libyan construction industry were low skills of manpower, changes in the scope of the project, slowness in giving instruction and poor qualification of consultant, while for the latter they were financial problems, bad weather conditions on the job site and change in the scope of project. Statistical experiments including Paired Samples T-Test, was run to test the significance of the survey data in both countries Libya and UK. The statistical results confirmed the collected data from the survey were significant.

  • PDF

Development of a Collaboration Recommendation Model between Global Consulting Firms using Link Prediction

  • Yu, Young-su;Koo, Bon-sang
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.381-386
    • /
    • 2020
  • Global construction and engineering consulting (E&C) firms are actively seeking entry into overseas markets based on loan projects from multilateral development banks to provide a basis for entry into overseas markets and sustainable growth. Bids on these projects are competitive between global top firms in terms of the technical level and price due to the limited number of projects; thus, developing a successful partnership to complement competence has become an essential element to win bids. In this regard, many studies have analyzed enterprises through characteristic analyses or the derivation of influential factors from the past social networks based on social network analysis (SNA). However, few studies have been conducted to reflect the process of changes to analyze collaborative relationships. Thus, this study aims to identify dynamic changes in past social networks and develop a model that can predict changes in the relationships between E&C firms based on similarities or differences between firms, presenting a methodology to target firms for appropriate collaboration. The analysis results demonstrate that the sensitivity of the developed prediction model was 70.26%, which could accurately predict 163 out of 232 actual cooperative cases.

  • PDF

Sustainability Appraisal of Chinese Railway Projects In Nigeria: Afoot

  • Awodele, Imoleayo Abraham;Mewomo, Modupe Cecilia
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.967-974
    • /
    • 2022
  • It is no news that Nigeria's infrastructure challenge is enormous. In the global ranking, Nigeria ranked low in quantity and quality of its infrastructural provision which has a great impact on the ease of business transaction. Low investments in transportation have brought about the current infrastructural deficit. Recently, the Nigerian government has made effort to address at least to some extent the infrastructural deficit through Public-Private Partnership, but this has not yielded the desired result. Moreover, the sustainability issues relating to railway projects such as, emissions, noise pollution, ecosystem, and other environmental issues calls for urgent attention. Hence, this necessitated consideration on sustainability appraisal for the Chinese rail project in Nigeria. This study reviews sustainability of railway projects built by the Chinese firm in Nigeria with particular emphasis on the environmental and social impact of these projects. The study further identified issues and challenges in project implementation with a particular focus on civil dialogue and community engagements. A detailed literature search was conducted on railway projects and infrastructure by systematically reviewing selected published articles.The analysis of the selected articles identified sustainability issues and potential for improvement of Chinese railway projects and how they contribute to or inhibit competitiveness in the Nigerian railway market. From the literature searched, some of the projects constructed by Chinese firm revealed that there is economic and social impact of railway projects delivered by the Chinese firm in terms of capacity development and knowledge transfer potentiality. For instance, in the just concluded Lagos-Ibadan railway projects, the study gathered that the project brought about 5000 jobs and local staff were trained by the Chinese company, this will boost man power and local content capability. Also, it will significantly improve Nigeria's infrastructure and boost its economic development. The study suggests that Nigerian government should ensure and provide an enabling environment that is conducive for investment on the continent. Peace, improved security, and decent governance are the best conditions for sustainable transportation growth.

  • PDF