• Title/Summary/Keyword: International conference on appropriate technology

Search Result 36, Processing Time 0.025 seconds

Network Analysis Based the Trends in International Conference on Appropriate Technology (ICAT) (네트워크 분석 기반 적정기술국제학회의 최근 연구동향 분석)

  • Kwak, Jeeyoon;Jeong, Seongpil
    • Journal of Appropriate Technology
    • /
    • v.7 no.1
    • /
    • pp.85-92
    • /
    • 2021
  • The research topics of the appropriate technology include environment, medical, education, and energy etc. Therefore, having a review on appropriate technology requires huge efforts of specialists from many difference research areas. Social network analysis has been applied to understand the relationships among the components in the network and to provide insights by visualizing the huge network having many components. In this study, the co-authors and their research topics at the international conference on appropriate technology (ICAT) held by Academic Society for Appropriate Technology (ASAT) from 2017 to 2019 were analyzed using the statistical and visualization tools. The networks between co-authors were analyzed using the pretreated data which were collected from ASAT. The annual trend or characteristics of the general information on ICAT were also analyzed.

Analysis of SEWB Activities on Appropriate Technology in Korea and in Developing Countries Including Cambodia (한국 및 개도국(캄보디아 등) 사례로 본 국경없는 과학기술자회의 적정기술 분야 사업 분석)

  • Lee, Sujung;Choi, Yoonjung;Park, Sanghee;Kim, Yongsoo;Jeong, Seongpil
    • Journal of Appropriate Technology
    • /
    • v.7 no.1
    • /
    • pp.93-101
    • /
    • 2021
  • Scientists and engineers without borders (SEWB) was established on 2009 as the NGO having specialist groups to support the underprivileged in developing countries living in the isolated area and having water and sanitation problems. After the SDGs were suggested by the UN on 2016, activities are globally conducted by the nation, NGO and etc. to improve health and education of the underprivileged in developing countries. SEWB also have been conducted the projects in Korea and developing countries to reduce the gap of the infrastructure between the developed and developing countries and to help sustainable development in the developing countries by providing appropriate technology. In Korea, SEWB have been held international conference on appropriate technology (ICAT), lectures, and competitions for specialists and students. In developing countries including Cambodia and other 5 countries, SEWB have been provided water packages funded by iCOOP KOREA and volunteer opportunities. Since 2019, 'SEWB sustainable village development project' have been conducted in Bot Veng village, Cambodia to improve infrastructures on water, electricity, transportation, and agriculture by using desalination system, Solar Cow system, strengthened wooden bridge, and poultry farm, respectively. The developed solution for developing countries from SEWB could contribute to eliminate the water shortage and poverty.

ASSESSMENT OF PUBLIC PERCEIVED ROADWAY SMOOTHNESS

  • Jamie Miller;Don Chen;Neil Mastin
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.507-508
    • /
    • 2013
  • International Roughness Index (IRI) has been widely used by state DOTs to quantify pavement smoothness. When pavement condition falls below certain IRI thresholds, corresponding pavement maintenance treatments should be considered for application. Selection of appropriate IRI thresholds is essential to tactical allocation of limited resources to improve the conditions of states' roadway systems. This selection process is often challenging, however, because IRI thresholds are largely determined by Perceived Ride Quality (PRQ), and PRQ differs in each state. In this paper, a framework is proposed to address this problem. Passenger raters will be randomly selected from predetermined geographic locations, and their PRQ ratings collected. Taking this perceived ride data, along with other data collected, a statistical analysis will be conducted to establish the relationship between measured IRI values and PRQ. Appropriate IRI thresholds will then be determined. Once this framework is implemented, state DOTs could make informative maintenance decisions, which are expected to greatly enhance the public perception of pavement conditions in today's challenging economy.

  • PDF

OFFICIAL DEVELOPMENT ASSISTANCE 'ODA' AND HUMAN RESOURCE DEVELOPMENT IN THE CONSTRUCTION INDUSTRY OF A DEVELOPING COUNTRY

  • Rajendra Niraula;Yoichi Hirota;Shunji Kusayanagi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.956-961
    • /
    • 2005
  • Delay, cost overrun and inferior quality in public works are common in Nepal and Cambodia. Almost 90 percent of the civil construction engineers working in the industry were one-degree graduates without appropriate training. The civil engineering education had provided elemental engineering knowledge to the graduates however integrated engineering and management knowledge and skill are essential for efficient infrastructure development. ODA in developing countries had been concentrated in hard infrastructure development without improving the quality of higher education. Integrating ODA to engineering education system would help develop qualified technical manpower and appropriate technology domestically, and improve the efficiency in infrastructure development in developing countries.

  • PDF

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF

FUZZY-BASED APPROACH FOR EVALUATING THE PERFORMANCE OF A NEW TECHNOLOGY IN CONSTRUCTION SITES

  • Sung-Woo Yang;Tae-Hoon Kim;Ung-Kyun Lee;Wi-Sung Yoo;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1248-1253
    • /
    • 2009
  • Although there have been many efforts to reduce accidents on construction sites, such accidents continue to occur. New technologies have recently been developed to improve safety and their performance needs to be evaluated to determine their suitability prior to the application. The assessment for safety performance mainly is conducted depending on qualitative and subjective judgment of supervisors. However, there are rarely proper approaches to assess such qualitative measures. Therefore, we propose a fuzzy-based approach to assessing the performance of a new technology. The assessment of a new technology, called a mobile detector (MD), was carried out as a case study. The output is compared with those by a numerical simulation. As a result, the fuzzy-based performance assessment is shown to be appropriate for this evaluation.

  • PDF

A STUDY OF STRUCTURING OF NEW MANAGEMENT SYSTEM FOR LOCAL GOVERNMENTS IN JAPAN

  • Takashi Goso;Shunji Kusayanagi;Seigo Nasu;Kotomi Uemoto
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.371-376
    • /
    • 2005
  • Administrative works of local governments in Japan always have been led by central government. Local government organizations have gotten used to control of central government, whose organization is divided vertically into divisions. Such organizations as lack of cooperation of each administrative division could not define strategic goal appropriate for their district independently and could not give an efficient and optimized solution to their strategic goal. Under existing management system, it will be difficult for local governments to rapidly adapt to changing society. Under these circumstances, it is necessary for local governments to structure new management system independent on central government's instructions in order to manage appropriately.

  • PDF

IDENTIFICATION OF SIGNIFICANT CRITERIA FOR SELECTION OF CONSTRUCTION PROJECT MANAGERS IN IRAN

  • Abbas Rashidi;Fateme Jazebi;Mohamad Hassan Sebt
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1564-1569
    • /
    • 2009
  • Project managers play a key role in cost, time, and quality of a project. Selection of an appropriate project manager, therefore, is considered as one of the most important decisions in any construction project. It should be noted that most important decision makings are carried out by the project manager throughout the project. Traditionally, project manager selection in construction companies in Iran is through organizing an interview with candidates and selecting the most appropriate choice in accordance with the capabilities, potentials and individual specifications coupled with the requirements of the project. In the same direction, organizing interview on selection of appropriate candidate is usually carried out by senior managers of companies. Determination of the most important criteria for selection of project managers and also identification of significance coefficient of each criterion can highly help senior managers of companies to make sound selection decisions. In this paper, a numerical model has been considered for determination of significance of each criterion, details of which are submitted for selection of project manager in Iranian petrochemical, oil and gas sector companies. For this reason, all criteria- considered by senior managers of the companies under study- are first determined. Then, information obtained through 38 interviews, conducted by senior managers of the mentioned companies while selecting project manager, is analyzed. Significant coefficient of each criterion is calculated through the accumulated data using fuzzy curves method.

  • PDF

THE INTRODUCTION METHOD OF TECHNOLOGY MANAGEMENT IN THE OIL AND GAS PLANT INDUSTRY

  • Doo Hee Lee;Young Woong Song;Hyoung Chul Lim;Yoon Ki Choi
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.249-258
    • /
    • 2007
  • Recently orders of projects in the field of oil and gas plants have increased due to rising oil prices and consumption. The markets of oil and gas plants are expanding into the Middle East area and all over the world. Because the oil and gas markets have a lot of overseas construction operations, competition among advanced companies is more important. However, companies in the period of growth have not had enough competitive powers of license in the design phase. Therefore, they are faced with difficulty of adopting the technology which is maximizing the effect of investments, and scheduling of a long-range plan. In order to achieve adequate technology management and competitive power, this study considers a long-range plan through an analysis of an appropriate introduction and the strategic planning process of technology management.

  • PDF