• Title/Summary/Keyword: International Roughness Index Information

Search Result 5, Processing Time 0.02 seconds

Development of Borough Road Pavement Condition Evaluation Criteria and Prediction Index (자치구 포장상태평가등급 기준 개선 및 포장상태 예측지수 개발)

  • Lee, Sang Yum;Jeon, Jin Ho
    • International Journal of Highway Engineering
    • /
    • v.18 no.6
    • /
    • pp.115-122
    • /
    • 2016
  • OBJECTIVES : This study develops an evaluation method, which is useful to inspect pavement condition of specific boroughs. This is because pavement condition is broadly divided into five grades via visual inspection, which does not consider the types of deteriorations, and is decided by an investigator having a subjective viewpoint. This visual inspection method is not a satisfactory method for accurate maintenance when various deteriorations occur. METHODS : The performance model considers several factors such as crack, rutting, and IRI. This method is also modified from borough SPI based on SPI (Seoul Pavement Index). Considering limited budget of borough, PI (prediction index) is suggested, which is related to the grade of pavement condition evaluation and type of materials. Practical correlation review is also conducted with statistical verification by using the Monte Carlo simulation. RESULTS : The results of the study show that modified criteria are reasonable. First, the comparison between the visual inspection result and the SPI result indicates that the R-square value is sufficiently high. Second, through the common section, each evaluation method could be compared, and the result shows considerable similarity, which increases when the range is modified. Finally, PI for predicting remaining life and the random number SPI have common parts, which means that each indicator would be adequate to be used as an evaluation method. CONCLUSIONS : Comparison and analysis results show that the developed evaluation method is reasonable for specific boroughs where financial support is inadequate for the evaluation process by using the newer equipment. Moreover, for more accurate evaluation method, previous visual inspection data should be utilized, and the database of inspection equipment have to be collected.

A Study of Improvement of Urban Pavement Maintenance Technique based on Pavement Condition Evaluation and FWD Data (도로포장 표면조사와 FWD정보에 기반한 도심지 도로포장 유지보수 기법 개선방안 연구)

  • Lee, Sangyum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.12
    • /
    • pp.532-541
    • /
    • 2016
  • The objective of this paper is to support accurate pavement condition assessment and decision of proper maintenance method and time by conducting visual inspection and calculating the remaining life of pavement from falling weight deflectometer(FWD) data. Each was implemented in the same long-term performance pavement(LTPP) sections. Visual inspection was executed to measure pavement condition indices such as crack, rutting and international roughness index(IRI) and the Seoul Pavement Index(SPI) was calculated based on these results. The dynamic modulus was back-calculated from the FWD data. The remaining pavement lives were determined from equivalent single axle loading(ESAL) and FWD data. Correlation of maintenance priority by each result value was examined. Consequently, the correlation between remaining life to Crack and Rutting was higher than the other factors or indicesbecause IRI is not related to FWD value and SPI value consists with IRI value and other indices. The R-square value of correlation of FWD with Crack and Rutting was 0.65, which indicated an insufficient correlation. Consequently, when decision of maintenance of method, time, etc. is determined, FWD data have to be considered with Crack and Rutting because of those relations.

An Application of Fuzzy Logic with Desirability Functions to Multi-response Optimization in the Taguchi Method

  • Kim Seong-Jun
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.5 no.3
    • /
    • pp.183-188
    • /
    • 2005
  • Although it is widely used to find an optimum setting of manufacturing process parameters in a variety of engineering fields, the Taguchi method has a difficulty in dealing with multi-response situations in which several response variables should be considered at the same time. For example, electrode wear, surface roughness, and material removal rate are important process response variables in an electrical discharge machining (EDM) process. A simultaneous optimization should be accomplished. Many researches from various disciplines have been conducted for such multi-response optimizations. One of them is a fuzzy logic approach presented by Lin et al. [1]. They showed that two response characteristics are converted into a single performance index based upon fuzzy logic. However, it is pointed out that information regarding relative importance of response variables is not considered in that method. In order to overcome this problem, a desirability function can be adopted, which frequently appears in the statistical literature. In this paper, we propose a novel approach for the multi-response optimization by incorporating fuzzy logic into desirability function. The present method is illustrated by an EDM data of Lin and Lin [2].

Development of Seocho Borough Pavement Condition Evaluation Model based on Seoul Metropolitan SPI (서울시도 SPI를 활용한 서초구 도로포장상태 평가모형 개발)

  • Lee, Sang-Yum;Park, Mi-Youn;Kim, Kyoon-Tai
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.314-321
    • /
    • 2016
  • Adapting the maintenance criteria of Seoul City pavement is not applicable for borough pavement due to differences between the pavement of Seoul city and the borough, such as priority of maintenance, traffic volume, thickness of pavement, and pavement deterioration rate by distresses. To develop an efficient and reasonable evaluation method of the Seocho borough pavement condition within a limited budget, this study suggested the borough pavement condition evaluation model based on the PMS (Pavement Management System) of Seoul Metropolitan SPI (Seoul Pavement Index). The SPI was modified to predict the remaining life and determine the proper maintenance method for the pavement in Seocho borough. This was suggested to reflect the rate of the designed performance life and field performance life of pavement as well as the pavement condition at the stage of the completion of construction. Primary variables, such as crack, rutting and IRI in the final model affect the overall performance life due to their even composition. Therefore, the suggested model considering the lowered criteria, design performance factor, and construction factor can be used for the more efficient maintenance of Seocho borough pavement.

Development of Road Surface Management System using Digital Imagery (수치영상을 이용한 도로 노면관리시스템 개발)

  • Seo, Dong-Ju
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.1
    • /
    • pp.35-46
    • /
    • 2007
  • In the study digital imagery was used to examine asphalt concrete pavements. With digitally mastered-image information that was filmed with a video camera fixed on a car travelling on road at a consistent speed, a road surface management system that can gain road surface information (Crack, Rutting, IRI) was developed using an object-oriented language "Delphi". This system was designed to improve visualized effects by animations and graphs. After analyzing the accuracy of 3-D coordinates of road surfaces that were decided using multiple image orientation and bundle adjustment method, the average of standard errors turned out to be 0.0427m in the X direction, 0.0527m in the Y direction and 0.1539m in the Z direction. As a result, it was found to be good enough to be put to practical use for maps drawn on scales below 1/1000, which are currently producted and used in our country, and GIS data. According to the analysis of the accuracy in crack width on 12 spots using a digital video camera, the standard error was found to be ${\pm}0.256mm$, which is considered as high precision. In order to get information on rutting, the physically measured cross sections of 4 spots were compared with cross sections generated from digital images. Even though a maximum error turned out to be 10.88mm, its practicality is found in work efficiency.

  • PDF