• Title/Summary/Keyword: Internal Fault

Search Result 249, Processing Time 0.027 seconds

Advanced Numerical Relaying for Power Transformer Protection (전력용변압기보호를 위한 개선된 수치계전기법)

  • Park, Chul-Won;Shin, Myong-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.217-219
    • /
    • 2004
  • The second harmonic component could be decreased by magnetizing inrush when there have been changes to the material of the iron core or its design methodology. The higher the capacitance of the high voltage status and underground distribution, the more the differential current includes the second harmonic during the occurrence of an internal fault. Therefore, the conventional second harmonic-restrained RDR needs modification. This paper describes an advanced numerical algorithm that utilizes terminal voltage, differential current harmonics, harmonic ratio, and flux-differential current slope. Based on the results of testing with WatATP99 simulation data, the proposed algorithm was proven to be faster and more reliable.

  • PDF

PMMA수지의 수 Tree현상

  • 유근민;이재선
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.7 no.1
    • /
    • pp.18-24
    • /
    • 1982
  • The Tree phenomenon of the PMMA resin depends on an annex of the inorganic fillers and water. If the internal of an arganic insulating materials exist the fault of inorganic fillers, Void and Projecting part, the high voltage concentrates in this place. It leaves a trace about the partical breakdown and this phenomenon develops into the degration of insulating material. This paper researchses that have an effect on the tree phenomenon by the inorganic fillers and water. The results is as follow. (1) The growth of tree are less the influence of inorganic fillers. Because , the constant of water are more. (2) If the tree branches contact the inorganic filler, the advance are relaxation.

Detects an internal fault of the ship which was applied to the weighted average (가중치평균을 적용한 선박내부 이상 감지)

  • Park, Jin Gwan;Kim, Yeong Ju;Park, Sun;Lee, Yeon-U;Jung, Mina;Lee, Sung Ro
    • Annual Conference of KIPS
    • /
    • 2013.05a
    • /
    • pp.492-494
    • /
    • 2013
  • 본 논문에서는 대형선박의 내부를 실시간으로 모니터링 하기 위해 무선센서네트워크(WSN)을 사용하였고 사용자의 접근성을 높이기 위해 안드로이드 단말기를 이용하였다. 수집되는 데이터의 평균과 표준편차를 구하고 가중치평균을 도입하여 현재 수집되는 데이터가 표준편차를 초과하게 되면 경보를 통해 사용자에게 알려준다. 경보는 알람과 현재 데이터가 급격한 변화를 보이는 장소의 이름과 정보가 나타난다.

Highly power-efficient and reliable light-emitting diode backlight driver IC for the uniform current driving of medium-sized liquid crystal displays

  • Hong, Seok-In;Nam, Ki-Soo;Jung, Young-Ho;Ahn, Hyun-A;In, Hai-Jung;Kwon, Oh-Kyong
    • Journal of Information Display
    • /
    • v.13 no.2
    • /
    • pp.73-82
    • /
    • 2012
  • In this paper, a light-emitting diode (LED) backlight driver integrated circuit (IC) for medium-sized liquid crystal displays (LCDs) is proposed. In the proposed IC, a linear current regulator with matched internal resistors and an adaptive phase-shifted pulse-width modulation (PWM) dimming controller are also proposed to improve LED current uniformity and reliability. The double feedback loop control boost converter is used to achieve high power efficiency, fast transient characteristic, and high dimming frequency and resolution. The proposed IC was fabricated using the 0.35 ${\mu}m$ bipolar-CMOS-DMOS (BCD) process. The LED current uniformity and LED fault immunity of the proposed IC were verified through experiments. The measured power efficiency was 90%; the measured LED current uniformity, 97%; and the measured rising and falling times of the LED current, 86 and 7 ns, respectively. Due to the fast rising and falling characteristics, the proposed IC operates up to 39 kHz PWM dimming frequency, with an 8-bit dimming resolution. It was verified that the phase difference between the PWM dimming signals is changed adaptively when LED fault occurs. The experiment results showed that the proposed IC meets the requirements for the LED backlight driver IC for medium-sized LCDs.

Development of Asynchronous Blocking Algorithm through Asynchronous Case Study of Steam Turbine Generator (스팀터빈 발전기 비동기 투입 사례연구를 통한 비동기 방지 알고리즘 개발)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.10
    • /
    • pp.1542-1547
    • /
    • 2012
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. When calculation method of protection settings and logic for protection of generator asynchronization will be recommended, a distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection, this paper describes an improved backup protection coordination scheme using a new logic that will be suggested.

A Study of Life about Naturally Aged Nitrocellulose by Storage (자연 노화된 니트로셀룰로오스의 수명에 관한 연구)

  • Kim, Dong-seong;Jin, Hong-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.595-601
    • /
    • 2020
  • During the safety inspection of nitrocellulose-made explosive containers stored for more than 10 years, cracks were found in the containers. Therefore, a failure cause analysis test was performed. First, the cause of failure through the failure tree analysis was conducted to select the factors that influenced failure. The changes in the properties of the container caused by the acceleration of the reaction were found to be the cause of the failure by confirming the influence on the environment and internal/external factors that may occur during storage. To confirm this, environmental tests, such as thermal shock test and vacuum thermal stability test, were performed using a naturally aged container to analyze the cause of failure, and an accelerated aging test was performed to reproduce the failure. Through this, the chemical reaction was accelerated by heat and charge, as in the result of the fault tree analysis, and it was confirmed that the physical properties of the container were changed. In addition, the service life of the container was estimated using the Arrhenius model for the storage life due to thermal aging.

GAM: A Criticality Prediction Model for Large Telecommunication Systems (GAM: 대형 통신 시스템을 위한 위험도 예측 모델)

  • Hong, Euy-Seok
    • The Journal of Korean Association of Computer Education
    • /
    • v.6 no.2
    • /
    • pp.33-40
    • /
    • 2003
  • Criticality prediction models that determine whether a design entity is fault-prone or non fault-prone play an important role in reducing system development costs because the problems in early phases largely affect the quality of the late products. Real-time systems such as telecommunication systems are so large that criticality prediction is mere important in real-time system design. The current models are based on the technique such as discriminant analysis, neural net and classification trees. These models have some problems with analyzing causes of the prediction results and low extendability. This paper builds a new prediction model, GAM, based on Genetic Algorithm. GAM is different from other models because it produces a criticality function. So GAM can be used for comparison between entities by criticality. GAM is implemented and compared with a well-known prediction model, BackPropagation neural network Model(BPM), considering Internal characteristics and accuracy of prediction.

  • PDF

An Effective Cache Test Algorithm and BIST Architecture (효율적인 캐쉬 테스트 알고리듬 및 BIST 구조)

  • Kim, Hong-Sik;Yoon, Do-Hyun;Kang, Sing-Ho
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • v.36C no.12
    • /
    • pp.47-58
    • /
    • 1999
  • As the performance of processors improves, cache memories are used to overcome the difference of speed between processors and main memories. Generally cache memories are embedded and small sizes, fault coverage is a more important factor than test time in testing point of view. A new test algorithm and a new BIST architecture are developed to detect various fault models with a relatively small overhead. The new concurrent BIST architecture uses the comparator of cache management blocks as response analyzers for tag memories. A modified scan-chain is used for pre-testing of comparators which can reduce test clock cycles. In addition several boundary scan instructions are provided to control the internal test circuitries. The results show that the new algorithm can detect SAFs, AFs, TFs linked with CFs, CFins, CFids, SCFs, CFdyns and DRFs models with O(12N), where N is the memory size and the new BIST architecture has lower overhead than traditional architecture by about 11%.

  • PDF

A Study on Protection of Generator Asynchronization by Impedance Relaying (임피던스 계전기를 이용한 발전기 비동기 투입 보호 연구)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2000-2006
    • /
    • 2011
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. Where calculation method of protection settings and Logic for Protection of Generator Asynchronization will be recommended, A distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, Zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection this paper describes an improved backup protection coordination scheme using a new Logic that will be suggested.

A Study on Protective Coordination Setting of Positive Offset Mho Loss of Field Relay (Positive Offset Mho 계자 상실 계전기 보호 협조 정정에 관한 연구)

  • Kim, Kwnag-Hyun;Park, Ji-Kyung;Kim, Jun-Hyeok;Kim, Doo-Ung;Kang, Sung-Bum;Kim, Chul-Hwan;Lyu, Young-Sik;Yang, Jeong-Jae;Ko, Yun-Tae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.8
    • /
    • pp.1326-1333
    • /
    • 2016
  • It is important to clear the fault and prevent resulting in damage to power system. Although the frequency of generator internal fault is relatively low, it can lead to incalculable damage to power system as well as generator. Especially, loss of field on generator can cause the generator to lose synchronism for a short time if it is not removed promptly. Therefore, it is needed to conduct research on loss of field relay for detecting or clearing the loss of field. However, the setting of the relay may vary in generator operator or engineer, and the relay is not coordinated well with other elements associated with loss of field. In this paper, we address specifically the coordination of positive offset mho loss of field relay which is one of the protection schemes for loss of field. Computer simulations are performed by using ElectroMagnetic Transients Program-Restructured Version (EMTP-RV) based on actual data.