• Title/Summary/Keyword: Interconnected Distribution System

Search Result 125, Processing Time 0.034 seconds

A Study on the Advanced Protective Coordination Schemes of Distribution System Considering Distributed Generations (분산전원을 고려한 배전계통의 개선된 보호협조 방안 연구)

  • Choi, Dong-Man;Choi, Joon-Ho;Moon, Seung-Il;Kim, Jae-Chul;Moon, Chae-Joo;Kim, Il-Soo
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.701-703
    • /
    • 2005
  • Recently, There has been growing interest in Distributed Generations with high-energy efficiency due to the Increasing energy consumption and environmental pollution problems. but an insertion of Distributed Generations to existing power distribution system can cause several problems such as voltage variations, harmonics, protective coordination, increasing fault current etc, because of reverse power. This paper was applied to Sukumar M[l] proposal schemes and identity the faulted section performing short-circuit analysis by MATLAB program to distribution systems interconnected a large number of distributed generations.

  • PDF

A study on the Operation Algorithm for Bi-directional Sectonalizer in Distribution System Interconnected with Distributed Generations (분산전원이 연계된 배전계통의 양방향 구간개폐기의 동작 알고리즘에 관한 연구)

  • Yoon, Gi-Gab;Jeong, Jum-Soo;An, Tae-Pung;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.8
    • /
    • pp.1802-1809
    • /
    • 2009
  • Abstract The typical distribution systems have the power flow from distribution substations (sources) to customers (load) only as one direction. However, in the case where distributed generations (DG) such as PV system and wind power systems are connected to distribution systems, the DG output variations to distribution systems, so called reverse power flow, may cause the bi-directional power flow. So, the reverse power flow has severe impacts on typical power system, for example power quality problems, protection coordination problems, and so on. Especially, protection devices (sectionalizer) in primary feeder of distribution system interconnected with distributed generations may cause problems of malfunction, and then many customers could have problems like an interruption. So, this paper presents the bi-directional operation algorithm of protection devices to overcome the problems like mal-function. And, also this paper shows the effectiveness of proposed method by using both PSCAD/EMTDC software and test facility of protection devices to simulate the field distribution systems.

An application of the A-PDA model and the water supply performance index for the temporal and spatial evaluation of the performance of emergency water supply plans via interconnections (비상시 용수 연계공급 성능의 시·공간적 평가를 위한 A-PDA 모형 및 공급성능지표의 적용)

  • Oak, SueYeun;Kim, SuRi;Jun, Hwandon
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.11
    • /
    • pp.977-987
    • /
    • 2018
  • The purpose of the water distribution system is gradually changing to increase the flexibility for responding to various abnormal situations. In addition, it is essential to improve resilience through preparing emergency plans against water supply failure. The most efficient way is emergency interconnections which supply water from interconnected adjacent blocks. To operate successful interconnections, it is essential to evaluate the supply performance in spatial and temporal aspects. The spatial and temporal aspects are dominated by its interconnected pipes and interconnected reservoirs respectively. In this study, an emergency interconnection scenario where problem occurred in reservoir 1 at 0:00hr in A city, Korea. An Advanced-Pressure Driven Analysis model was used to simulate the volume and inflow volume of the interconnected reservoirs. Based on the hydraulic analysis results, a multi-dimensional evaluation of the supply performance was conducted by applying possible water supply range indicator (PWSRI) and possible water supply temporal indicator (PWSTI) which are based on fuzzy membership functions. As a result, it was possible to evaluate the supply performance on the sides of consumers in spatio-temporal aspects and to review whether established plans mitigate the damage as intended. It is expected to be used for decision making on structural and non-structural emergency plan to improve the performance of an emergency interconnection.

Identification of the faulted Feeder it Distribution Networks with Distributed Generations (분산전원이 연계된 배전 계통의 고장 선로 구분)

  • Kim S. G.;Kim K. H.;Jang S. I.;Kang Y. C.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.257-259
    • /
    • 2004
  • This paper proposes the identification method for the faulted feeder, where it identify whether the faulted feeder is the DG-connected feeder or the neighboring feeder (but sharing the same bus of the substation). In general, DG has to be disconnected from the grid when the fault occurs on the interconnected distribution feeder as soon as possible. However, the faults occured on the neghboring feeder would mistakenly cause the disconnection of the DG. For reliable operation of DG, DG should be sustained at the fault occurred on neighboring distribution feeders. The proposed identification method utilizes the impedance monitored from the DG and examines the coordination of overcurrent relay of the distribution system. This paper describes how the proposed method to identify the faulted feeder and how the method can be utilized.

  • PDF

A Study on the Coordination Scheme Considering the Loss of Sensitive Load by Voltage Sag at Distribution System Interconnected Dispersed Generation (배전계통에 분산전원 연계시 전압강하에 의한 민감부하의 피해를 고려한 보호협조 연구)

  • Jung, Seung-Bock;Kim, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.363-365
    • /
    • 2003
  • Recently, the concern of power qualiaty problem is increasing. Especially, Voltage quality problem have been increased important problem. Electronic device was affected by voltage sag. So, sensitive load that included many electronic Device was affected by voltage sag. also, it may have economic loss. In this paper, we argue the coordination scheme considering the loss of sensitive load. The coordination device of distribution system for instaneous fault is recloser and sectionalizer, But, the fault clearing time of recloser is more than 2 seconds. So, voltage sag generates long time that affected sensitive load. HS(high speed switchgear) has fast fault clearing time(0.015s) that not affected sensitive load. Therefore, the coordination applied HS is used. The proposed schemes are proved and evaluated by a case study using PSCAD/EMTDC simulation.

  • PDF

Development of a Loss of Mains Detection Method for Distributed Resources (분산 전원의 고립 운전 검출 기법 개발)

  • Jang, S.I.;Kim, K.H.
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.42-45
    • /
    • 2001
  • The islanding protection for distributed resources (DR) becomes an important and emerging issue in power system protection since the distributed generator installations are rapidly increasing and most of the installed systems are interconnected with distribution network. In order to avoid the negative impacts on distributed network resulting from islanding operations of DR, it is necessary to detect the loss of mains (LOM) effectively. This paper presents a new LOM detection method using the rate of change in total harmonic distortion (THD) of current. The proposed method effectively detects LOM of the DR unit operating in parallel with the distribution network. We also verified the efficiency of the proposed method using the radial distribution network of IEEE 34 bus model.

  • PDF

Discrimination of the Faulted Feeder in Grid with Distributed Generations Considering the Characteristics of Protection Devices (보호기기 특성을 고려한 분산전원 연계 계통의 사고 배전선 판별 알고리즘)

  • Kim, S.G.;Kim, K.H.;Jang, S.I.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.243-245
    • /
    • 2004
  • This paper proposes the discrimination method for the fault location, whether it is within the line where the distributed generation(DG) is integrated or out of the line (but sharing the same bus of the substation). In general, DG has to be disconnected from the grid when the fault occurs on the interconnected distribution feeder as soon as possible. However, the faults occured on the neighboring feeder would mistakenly cause the disconnection of the DG. For reliable operation of DG, DG should be sustained at the fault occurred on neighboring distribution feeders. The proposed identification method utilizes the impedance monitored from the DG and examines the coordination of overcurrent relay of the distribution system. This paper describes how the proposed method to identify the faulted feeder and how the method can be utilized.

  • PDF

Analysis of Stability of PV System using the Eigenvalue according to the Frequency Variation and Requirements of Frequency Protection

  • Seo, Hun-Chul;Kim, Chul-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.4
    • /
    • pp.480-485
    • /
    • 2012
  • Use of photovoltaic (PV) power generation system will become more widespread in the future due to anticipated cost reduction in PV technology. As the capacity of PV systems increases, a variation of power system frequency may prevent the stable output of PV system. However, the standard for the frequency protection of distributed generation in Korea Electric Power Corporation (KEPCO)'s rule does not include the setting of frequency protection. Therefore, this paper analyzes the correlation between the frequency protection requirements and the stability of grid-connected PV system for the adjustable operating setting of frequency protection. The distribution system interconnected with 3 MW PV system is modeled by Matlab/Simulink. The various values of frequency are simulated. For studied cases, the stability of PV system is analyzed. It is concluded that the setting of frequency protection is necessary to consider the stability of PV system.

Operating Characteristics of Protection Coordination Devices in Distribution System interconnected with Distributed Generation (분산전원이 연계된 배전계통에서 보호협조기기의 운용특성에 관한 연구)

  • Kim, So-Hee;Ji, Seong-Ho;Kim, Sun-Young;Rho, Dae-Seok
    • Journal of the Korea Convergence Society
    • /
    • v.2 no.2
    • /
    • pp.35-45
    • /
    • 2011
  • Recently, with the increasement of the interest about global warming, pollutions, and so on, a number of distributed generations(DGs) such as photovoltaic(PV) and wind power(WP), are interconnected with distribution systems. However, installing of DGs makes power flow changes such as directions, one-direction to bi-direction, and increasing/decreasing of fault current. Therefore, it may cause the critical problems. This paper proposes an evaluation algorithm for bi-directional protection coordination and presents an evaluation system for protection coordination based on this algorithm. Additionally, the result shows that the existing method may cause critical problems, and also the effectiveness of proposed method is verified.

A Study on the Coordination Control Algorithm of Step Voltage Regulator and Battery Energy Storage System for Voltage Regulation in Distribution System (배전계통의 전압안정화를 위한 선로전압조정장치와 전지전력저장장치의 협조제어 알고리즘에 관한 연구)

  • Kim, Byung-Ki;Wang, Jong-Yong;Park, Jea-Bum;Choi, Sung-Sik;Ryu, Kyung-Sang;Rho, Dae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.2
    • /
    • pp.269-278
    • /
    • 2016
  • In order to maintain customer voltages within allowable limit($220{\pm}13V$) as much as possible, tap operation strategy of SVR(Step Voltage Regulator) installed in distribution system is very important, considering the scheduled delay time(30 sec) of SVR. However, the compensation of BESS(Battery Energy Storage System) during the delay time of SVR is being required because the customer voltages in distribution system interconnected with PV(Photovoltaic) system have a difficultly to be kept within allowable limit. Therefore, this paper presents the optimal voltage stabilization method in distribution system by using coordination operation algorithm between BESS and SVR. It is confirmed that customer voltage in distribution system can be maintained within allowable limit($220{\pm}13V$).