The Transactions of the Korean Institute of Electrical Engineers P
/
v.53
no.1
/
pp.32-39
/
2004
Railway signaling systems consist of several vital computerized equipment such as CTC(Centralized Traffic Control), EIS(Electronic Interlocking System), ATC(Automatic Train Control) and so on. Currently, the project for development of railway signaling systems for the next-generation high-speed train is progressed according to the G7 project and railway signaling related several companies and research institute are joined this project consortium. The railway signaling systems, being developed in this project, called as a kTCS(Korean Train Control System), is composed of kTCS-CTC, kTCS-IXL, kTCS-ATC and etc. kTCS signaling systems have to be operated at the laboratory testing level as integrated signaling systems by interface between each railway signaling systems before railway field installation and revenue service. To solve this matter, communication protocols between each signaling equipment are designed and message codes for each defined protocols have defined. And also several equipment has developed for the railway integrated signaling systems for laboratory testing. We has plentifully tested and verified the designed protocols and the characteristics of integrated railway signaling systems with our developed each kTCS signaling equipment and communication protocols. In this paper, the integrated kTCS system including communication protocols is presented.
In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.
According to Railway Safety Act, Korea Transportation Safety Authority (KOTSA) has been entrusted with 'Integrated Railway Safety Audit (IRSA) and has implemented the safety audit to the Railway operation agencies such as Korea Railway (KORAIL) and the Railway facility management organization such as the Korea Rail Network Authority (KR Network). The target of IRSA is to establish the effective rail safety management system and to raise the safety level of the Railway operation and facility agencies by checking synthetically their performance of safety duties with sincerity according to the Railway Safety Act. Even though newly introduced IRSA is conducted smoothly, it is necessary to study the methodology and criteria of the state's safety audit system. The purpose of this paper is to improve the efficiency of IRSA by the comparative research between IRSA and other similar safety audit system and to establish the consecutive improvement concept of IRSA. Second purpose is to confirm the effectiveness of IRSA by the analysis of the relationship between audit results and the safety level of the rail operation agencies.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.12
/
pp.2392-2396
/
2011
This paper deals with the power integration of large urban railway systems to improve regenerative energy utilization. Current regenerative energy utilization is low because there is no special plan for using this energy. If the railway system is integrated with other railway systems, the efficiency is expected to be improved. Through the case studies, to find the realistic effect of integrated operation, real system for the Seoul Metro lines, especially line 5 and 7, had been applied.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.4
/
pp.646-652
/
2015
Increasing needs for rapid driving vehicles during rush hour, there are various researches how to operate or allocate rapid driving vehicles with the existing normal driving vehicles. In the aspect of power system, it should be preceded by an analysis for power equipment capacity. Also, it should be studied whether the added rapid driving vehicles gives a bad effects for stable operation of railway systems or not. In order to derive the results for these analysis processes, this paper suggest a novel analysis algorithm which can implement integrated analysis including rapid and normal driving railway vehicles simultaneously. This algorithm has been verified using Seoul Metro 7 Line data.
This paper proposes an integrated SE process for the development of railway systems with safety assessment included. Although the safety assessment process must be performed with SE process properly with good coordination, the interfaces between the two processes have not been clear. Thus, in many of safety critical system developments in Korea, it is difficult to assess safety in proper development phase. The process model proposed in this paper is based on both the concept of system life cycle and the repetitive use of SE process. In each of development phases, appropriate safety assessment methods are described. Also the evaluation of the integrated system incorporating safety factors is described. The resultant process model is expressed by the Enhanced Functional Flow Block Diagram (EFFBD) using a CASE tool. The model also allows timeline analysis for identifying activity flow and data flow, resulting in the effective management of process. In conclusion, the integrated process enable both the SE process and safety assessment process to cooperate with each other from early development phase throughout the whole system life cycle.
To cope with the change of railway safety environment and to prevent the catastrophic accident, the railway safety management system was established through the legislation of railway safety rules. And to audit and evaluate the accomplishment of railway safety rules by the railway operators, the Integrated Railway Safety Audit System(IRSAS) has been conducting. This study find out the strategy to stabilize the IRSAS by applying Theory of Constraints(TOC) Thinking Process. For meeting the IRSAS's goal of effective levelling up of railway safety, the two necessary conditions, 1)the secure of substantial safety through the IRSAS and 2)the execution of efficient IRSAS, should be fulfilled. Estimated undesirable effects(UDEs) from the IRSAS were identified, and 3 of them were selected for creating the requisite conflict clouds. Entities from these conflict clouds were synthesized into a core conflict cloud that foamed the base of Current Reality Tree. The strategic direction for change extracted from the conflict cloud is the reinforcement of IRSAS preparation system including the level up of operator's self audit, the deepening of preliminary survey, the establishment of complementing system of audit check list and the build up of auditor's specialization. These injection were logically validated via a Future Reality Tree and expected to be confirmed by further progressing of IRSAS.
This research aims to conduct a study on the feasibility of the LTE communication method for developing a dedicated integrated railway wireless network. An empirical analysis was carried out by establishing a dedicated integrated railway wireless network in an approximately 12km section between Illo station and Daebul station on the Honam line. Korean wireless communication methods for railway safety are different depending on each line, which makes it difficult for railway workers to cooperate with. This causes various problems. There is the ever-present risk of accidents due to call disconnection between wireless communication systems, frequency interference from commercial networks, and crosstalk. This study verified the feasibility of the 4th generation communication system, LTE, over the dedicated integrated railway wireless network as a solution for the above mentioned problems. The result shows this communication system exceeded existing performance standards of Europe GSM-R in every test item despite the location constraint of train tracks on the base station establishment.
The railway safety in Koreaisthreatenedduetotherestructuring of the railway industries, introduction of the Korea Train eXpress (KTX) and electrification of the conventional lines. Many technical backgrounds are required to control railway accidents as low as reasonably practicable, such as a railway safety act, safety standards, and safety assessment infrastructures. Korean government and the Korea Railroad Research Institute (KRRI) are conducting an integrated R&D program for improvement of the railway safety, where the target is to reduce the accident fatalities by half. The program is composed of three parts; the safety system engineering and the program management, the establishment of a safety management system, and the development of techniques for assessing and preventing major railway accidents. Details of the research programs are explained in this paper, where risk is used as the major control measure.
Needs for a new technologies of infrastructure systems arose, following the development of next generation EMU(Electric Multiple Unit) train with maximum speed over 400km/h. For high-speed operation tests of the new EMU, a high-speed railway infrastructure test-bed was constructed in a 28km long section of the Honam High-speed Railway. Diverse sensors and monitoring system was installed for continuous monitoring of the railway. Due to such effort, further demands and needs of the integrated monitoring system was derived in a more comprehensive and long-term perspective.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.