• Title/Summary/Keyword: Integrated Management Systems

Search Result 1,604, Processing Time 0.043 seconds

Improvement of ITSM IT Service Efficiency in Military Electronic Service

  • Woo, Hanchul;Jeong, Suk-Jae;Huh, Jun-Ho
    • Journal of Information Processing Systems
    • /
    • v.16 no.2
    • /
    • pp.246-260
    • /
    • 2020
  • IT Service Management (ITSM) achieves consolidated management for the IT services supporting the acquisition system, and no outside connections can be established with such ITSM. Issues pertaining to the D2B can be addressed to System Q&A or a Call Center for problem-solving. In other words, internal staff can take the necessary measures for problems by directly connecting with ITSM. Currently, diverse innovative technologies are being used in electronics and ubiquitous computing environments. This allows us to create a better world by providing the backbone for remarkable development in our human society in the fields of electronics, devices, computer science, and engineering. Following the expansion of IT services in the military acquisition sector such as Defense Electronic Procurement, military export/import support system, etc., customers' dependence on IT for conducting business with the military or related companies is increasing, including the military's dependence on the same technology for services to the public. Nonetheless, issues pertaining to the simplified/integrated management of complex IT service management systems, including slow system recovery, lack of integrated customer service window, and insufficient information sharing, have become the priority problems that IT managers are required to solve. Therefore, this study conducted research on the integrated management of IT services provided by Korea's national defense acquisition system, which was developed based on the existing system IT Infrastructure Library (ITIL) v2, and investigated the level of satisfaction with services with focus on ensuring that it can be used for understanding the necessity of the system and its advancement in the future.

Development of TLCSM Based Integrated Architecture for Applying FRACAS to Defense Systems (국방 무기체계 FRACAS 적용을 위한 TLCSM 기반 통합 아키텍처 구축)

  • Jo, Jeong-Ho;Song, Hyeon-Su;Kim, Bo-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.190-196
    • /
    • 2020
  • FRACAS(Failure Reporting, Analysis and Corrective Action System) has been applied in various industries to improve the reliability of the systems. FRACAS is effective in improving reliability by repeating failure analysis, proper corrective action, and result verification for identified failures. However, FRACAS has many limitations in terms of process, data collection and management to be integrated into the existing development environment. In the domestic defense industry, studies on the development of FRACAS system and process improvement have been conducted to solve the difficulties of applying FRACAS, but most of them are concentrated in the operation/maintenance phase. Since FRACAS should be conducted in consideration of TLCSM(Total Life Cycle System Management), it is necessary to study the reference architecture so that FRACAS can be applied from the early design phase. In this paper, we studied the TLCSM-based integrated architecture considering the system life cycle phases, FRACAS closed-loop process, and FRACAS essentials in order to effectively apply FRACAS throughout the life cycle of defense systems. The proposed architecture was used as a reference model for FRACAS in a shipboard combat system.

A Study of Integrated SCADA System for Wind Farm to Support Interoperability (이기종간의 상호운용을 지원하는 풍력발전 통합 SCADA 시스템에 관한 연구)

  • Kim, Young-Gon;Moon, Chae-Joo;Joo, Yeong-Tae;Park, Tae-Sik;Chang, Young-Hak
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.6
    • /
    • pp.70-76
    • /
    • 2013
  • Recently industrial control systems have been required to ensure intelligent, high tech automation, interconnection and interoperability demands. Therefore, there is a need to redefine the structure concepts of SCADA system for wind power. Also, at this time, the integrated management system is required for the distributed development of wind farms where are needed often interoperability features and exchange information between different wind farms, wind turbines or SCADA systems. In this paper, an integrated structural concepts for SCADA system are defined. Based on this definition of an integrated SCADA system, the basic designs are analyzed on physical layer, system layer and application layer which are corresponded to wind turbine controller, the SCADA server and the SCADA client, and implement HMI. Between the implementation SCADA server and the client, their normal functions were verified at the small scale wind energy test facilities.

A Study on the Application of TRIZ to Lean Six Sigma (TRIZ를 접목시킨 Lean Six Sigma에 관한 연구)

  • Jo, Tae-Yeon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.11a
    • /
    • pp.453-460
    • /
    • 2012
  • To maximize the operational efficiency of production and operations systems, Six Sigma and Lean Production System have been widely used. The main focus of Six Sigma is reducing variations, whereas that of Lean Production System is eliminating losses. To take advantage of the two approaches Six Sigma and Lean Production System was integrated into Lean Six Sigma, and the integrated approach has been used in recent years. In the implementation of Lean Six Sigma, the problems under consideration have often physical or technical contradictions which are difficult to be solved by conventional methods. To solve such contradictions TRIZ is useful in many cases. In this thesis, it is considered that how TRIZ can be applied to Lean Six Sigma. An integrated road-map of Lean Six Sigma and TRIZ is suggested and some cases are reviewed.

  • PDF

Hierarchical approaches for the FMS production planning and scheduling problems (FMS의 생산계획 및 일정계획을 위한 단계적 해법에 관한 연구)

  • 장성용;박진우
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1990.04a
    • /
    • pp.195-208
    • /
    • 1990
  • Flexible Manufacturing System(FMS) is an integrated, computer controlled complex of automated material handling devices and numerically controlled machine tools that can simultaneously process medium-sized volumes of a variety of part types. This paper discusses planning problems that can be solved for efficient use of an FMS and present an integrated decision support system for FMS production planning and scheduling problems. FMSDS(Flexible Manufacturing Systems Decision Support System) consists of data handling modules, part selection module, loading module, load adjusting module, scheduling module and simulation module etc. This paper presents the solution methodology of each subproblems and integrated interfaces between subproblems using hierarchical approaches and loop controls considering the relationships between subproblems. A case study by this model is presented.

  • PDF

An Integrated Production Management Model for a Manufacturing System (제조시스템을 위한 통합형 생산관리모형 구축)

  • Ahn, Jae-Kyoung
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.111-116
    • /
    • 2003
  • Business integration has been considered as one of the most critical success factors that enable the firms to gain competitive edges. Despite this trend, it has also been found among not a few companies that the activities that should be functionally tied with are performed even independently. In this study, an integrated model of production planning and inventory has been developed. Computerization of the production planning activities is proposed and implemented. We also proposed the reasonable inventory levels of each item using historic data of the items, which are composed of safety stock from the given fill-rate, operating stock from the production patterns, and reserved stock from the production planning. This study has helped the firm to have clearer job definition of the related processes, to tightly control the inventory by setting and tracing the reasonable fill rates for every product, and to quickly respond to the market changes through the computerized production planning process.

An Integrated DEA-AHP Model for the Acquisition of a Weapon System: Selection of a Next-Generation Fighter System in Korea

  • Moon, Jaehun;Kang, Seokjoong
    • Journal of information and communication convergence engineering
    • /
    • v.13 no.2
    • /
    • pp.97-104
    • /
    • 2015
  • In this paper, we propose a data envelopment analysis (DEA) and analytic hierarchy process (AHP) integrated model to improve the selection process in the acquisition of a weapon system which is the key component to the success of the project. In particular, we applied DEA in the first stage to choose a frontier group among the candidates in the selection process of the next-generation fighter system (the 3rd FX) in Korea. Then, by using the Delphi technique, we surveyed military experts and applied AHP to determine the best choice among the candidates. The results of the study match the actual decision made by the Korean government in the weapon system acquisition. The results of the proposed DEA-AHP integrated method in the selection of the next-generation fighter systems in Korea demonstrate the usefulness of the method. In this paper, we also discuss the future implications of the proposed model.

A Web Based Training Service for Product Data Management (웹 기반 제품정보관리 교육 서비스)

  • Do N. C.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.9 no.3
    • /
    • pp.260-265
    • /
    • 2004
  • This paper proposed a Web-based training service for product data management by supporting an integrated product data management system, various technical documents. and efficient communication systems. It also supports a general product development process and a consistent product data model that enable participants to experience management of consistent product information during the product development life cycle. The Web based environment of the service also provides participants with a collaborative workplace with other participants and a Web portal for all the components of the service.

Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF

A Study on Creating the SEMP with Project Management Data for the Railway System Development (철도시스템 개발에서 프로젝트관리 데이터를 반영하는 시스템공학관리계획서 생성에 관한 연구)

  • Kim, Ung;Yoon, Jae-Han;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Ahm;Yoon, Hyuk-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.393-397
    • /
    • 2007
  • During the complex systems development, a great deal of data are generated from both the systems engineering process and project management process, and also some data are required to be prepared for the system engineering management plan (SEMP). For the successful completion of the project, it is necessary to effectively manage all the data in order to maintain data consistency and traceability. To fulfill the necessity, this paper introduces the concept of an integrated data architecture and discusses its realization with $Cradle^{(R)}$(a computer aided systems engineering tool). Also, it was described how to automate the production of the SEMP in that working environment. The result of the approach, managing complex data efficiently in the systems engineering view, has been successfully applied in the Railway Safety Development Program.