Park, Seong-Jin;Lee, Choon-Man;Kim, Woong;Byun, Sam-Soo
Journal of the Korean Society of Manufacturing Process Engineers
/
v.9
no.1
/
pp.49-54
/
2010
An integrated machining center is developed for high precision and productivity manufacturing. The developed machine is composed of the high precision spindle using ball bearings, the high stiffness bed and the three axis CNC controller with the high resolution AC servo motor. In this paper, structural and modal analysis for the developed machine are carried out to check the design criteria of machine. The analysis is carried out by FEM simulation with using the commercial software, CATIA V5, ANSYS and ARMD. The simulation model of machine is made by shell and solid finite elements. This study also presents the measurement system on the modal analysis of an integrated machining center. The weak part of the machine is found by the analytical evaluation. The results provide with the structural modification data for good dynamic behaviors. And the safety of machine is confirmed by the modal analysis of modified machine design. As this study results can be trustworthy with the analysis of ANSYS and CATIA, integrated machining center can be successfully developed.
Journal of Korean Institute of Industrial Engineers
/
v.21
no.3
/
pp.329-343
/
1995
Traditionally, machining process sequence was influenced and constrained by the design information obtained from CAD data base, i.e., class of operations, geometric shape, tooling, geometric tolerance, etc. However, even though all the constraints from design information are considered, there may exist more than one way to feasibly machine parts. This research is focused on the integrated problem of operations sequencing and machine tools selection in the presence of the product mix and their production volumes. With the transitional costs among machining operations, the operation sequencing problem can be formulated as a well-known Traveling Salesman Problem (TSP). The transitional cost between two operations is expressed as the sum of total machining time of the parts on a machine for the first operation and transportation time of the parts from the first machine to a machine for the second operation. Therefore, the operation sequencing problem formulated as TSP cannot be solved without transitional costs for all operation pairs. When solved separately or serially, their mutual optima cannot be guaranteed. Machining operations sequencing and machine tool selection problems are two core problems in process planning for discretely machined parts. In this paper, the interrelated two problems are integrated and analyzed, zero-one integer programming model for the integrated problem is formulated, and the solution methods are developed using a Tabu Search technique.
Park, Chang-Kue;Yang, Young-Soon;Ruy, Won-Son;Jang, Beom-Seon
Journal of the Computational Structural Engineering Institute of Korea
/
v.22
no.2
/
pp.127-134
/
2009
In product development, CAD and CAE systems taking part in the design process were individually developed. Furthermore, in product development, different divisions and businesses often have heterogeneous CAD/CAE systems and methods for expressing product data, and addressing this heterogeneity creates additional costs and causes longer development periods. To ensure successful collaboration in the design process, it is therefore imperative that different CAD, CAE, and other related systems be managed in an organic and integrated manner from the initial stages of product development. Therefore, this study suggests an integrated CAD/CAE system including optimization in a more effective and integrated manner but also to support interfacing and the collective use of design and analysis tools. To validate the proposed method, a stiffened plate example is taken as an example. It is found that the proposed method could overcome the bottleneck of CAD and CAE such as transferability of data, though CATIA and ANSYS are used at the moment. Besides, carrying out an optimization process during the CAE process is another essential parts for the structural optimization process.
IGCC (Integrated Gasification Combined Cycle) plants are among the most advanced and effective systems for electric energy generation. From a control perspective, IGCC plants represent a significant challenge: complex reactions, highly integrated control to simultaneously satisfy production, controllability, operability and environmental objectives. While all these requirements seem clearly to demand a multivatiable, model predictive approach, not many applications can be easily found in the literature. This paper describes the IGCC dynamic simulation that is capable of simulating plant startup, shutdown, normal, and abnormal operation and engineering studies. This high fidelity dynamic models contain the detailed process design data to produce realistic responses to process operation and upset. And the simulation is used by engineers to evaluate the transient performance and produce graphical information indicating the response of the process under study conditions.
Journal of the Korean Society for Precision Engineering
/
v.13
no.12
/
pp.63-69
/
1996
As the significance of quality in the sense of customer satisfaction is growing, the management of quality becomes one of the main interests in the manufacturing systems research. This paper presents the concept of quality-driven CIM(Computer Integrated Manufacturing) system which is composed of a business process domain and a quality domain. In the business process domain, business functions are integrated by conventional design and manufacturing databases on the one hand, and an integrated quality system is interlinked to them via several quality modules on the other hand. Quality information model connects the business process domain with the quality domain where various types of quality data are stored in the form of quality database. This framework helps a manufacturing enterprise to implement the quality-driven CIM system to achieve its final objective "customer satisfaction".ion".uot;.
Journal of the Korean Society for Precision Engineering
/
v.14
no.10
/
pp.75-84
/
1997
This paper describes the development of an integrating method for process planning and scheduling activities for block assembly in shipbuilding. A block is composed of several steel plates and steel sections with the predetermined shapes according to the ship design. The parts which constitute the block are manufac- tured by cutting and/or bending operations, which are termed as machining operation in this paper. The machining operation is the first process for block assembly which influences the remaining block assembly processes. Thus process planning and scheduling for machining operation to manufacture parts for block are very important to meet the assembly schedule in the shipyard. An integrating method for process plan- ning and scheduling is developed by introducing the concept of distributed process planning and scheduling composed of initial planning, alternative planning and final planning stages. In initial planning stage, nesting parts information and machining emthods are generated for each steel plate. In alternative plan- ning stage, machine groups are selected and workcenter dispatching information is generated. In final planning stage, cutting sequences are determined. The integrated system is tested by case study. The result shows that the integrated system is more efficient than existing manual planning system.
Recently, apartments have had several fundamental problems in planning uniformity caused by fixed space programs and difficulties of maintenance. So decision-makings become more important in design process which were essential to performance realization of long-life housing. Therefore, this study aims to analyze the plans of the Bogeumjari Nae-gok based on the applied designs, and suggests improvements for advanced design process of the long-life housing in the domestic market. This research procedure are as follows: (1) Analyze design guide, district land development plan and local code which have influence on design limitation. (2) Compare partial plans of joined designs and analyze each design characters (3) Implement case studies of design process due to design timetable and design elements of Nae-gok. In result, this study suggests significant fundamental materials for advanced decision-making in design process of long-life housing: details credibility and noise control, etc. This research could be useful in making integrated design process applied for long-life housing.
With the shift of consumer’s spending behaviors further into emotionally-driven purchases, the role of brand is becoming even more important, which in turn, expands design’s role in the brand image strategy. The contact point between the consumers and the brand is the primary channel for building strong brand image through experience. Therefore, it is critical to comprehensively plan and manage the consumer contact point for any brand. Given the changing market conditions, the objective of this study is to define and structure an integrated design development and management system for building successful brand image. In order to do so, the research analyzed the characters of brand image, the conditions for consumer experience and the roles of emotion. The analysis into the correlation between images and emotion process model yields three natures of an image. The image 1) is based on empirical decisions, 2) expresses and conveys emotional aspects and 3) builds mental values through a sense of sympathy. Through case studies of successful designs that meet all three characteristics, the roles of a brand icon in building strong brand image and the needs for integrated design approach for implementation are defined. The methods for integrated design include 1) providing a focal point through brand image positioning, 2) utilizing visual themes based on brand image plot, 3) building a Total Identity Program to holistically manage brand images and 4) developing brand icons for brand image reinforcement.
The Transactions of the Korean Institute of Power Electronics
/
v.22
no.2
/
pp.126-133
/
2017
The conventional battery charger requires two separate voltage and current compensators to achieve constant current and constant-current-charging profile. This compensator configuration leads to an inevitable transient response during the mode change between the constant current and the constant voltage operation. Futhermore, a tedious and complicated design process is required to consider a widely changing battery voltage and the nonlinear electrical properties of Li-ion battery. This study proposes a single integrated voltage-current compensator of the LLC resonant converter for Li-ion battery charger applications to overcome the aforementioned drawbacks. The proposed compensator is designed to provide a smooth and reliable performance during the entire charging process while providing the reduced design efforts and seamless mode transient response. Several experimental results based on a 300 W prototype converter and its theoretical analysis are provided to verify the effectiveness of the proposed compensator.
Since the inception of off-line quality control, it has drawn a particular attention from research community and it has been implemented in a wide variety of industries mainly due to its extensive applicability to numerous real situations. Emphasizing design issues rather than control issues related to manufacturing processes, off-line quality control has been recognized as a cost-effective approach to quality improvement. It mainly consists of three design stages: system design, parameter design, and tolerance design which are implemented in a sequential manner. Utilizing experimental designs and optimization techniques, off-line quality control is aimed at achieving product performance insensitive to external noises by reducing process variability. In spite of its conceptual soundness and practical significance, however, off-line quality control has also been criticized to a great extent due to its heuristic nature of investigation. In addition, it has also been pointed out that the process optimization procedures are inefficient. To enhance the current practice of off-line quality control, this study proposes an integrated optimization model by utilizing a well-established statistical tool, so called response surface methodology (RSM), and a tolerance - cost relationship.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.