• Title/Summary/Keyword: Integrated Delivery System

Search Result 183, Processing Time 0.023 seconds

Strategic Approaches to Integrated Delivery System(IDS): Vertical Integration and Strategic Alliance (통합의료시스템(Integrated Delivery System, IDS)의 전략적 접근: 수직적 통합과 전략적 제휴)

  • Suh, Won S.
    • Korea Journal of Hospital Management
    • /
    • no.spc
    • /
    • pp.39-50
    • /
    • 2016
  • This paper discusses the strategic concepts applied to integrated delivery system(IDS). IDS is rooted in vertical integration(VI) and strategic alliance(SA), but only few knows about the theoretical backbone of the IDS. The paper explains how VI and SA applies to IDS, then provides cases of IDS rooted in strategic concepts; Kaiser Permanante Model, Mayo Clinic Model, and ACO(Accountable Care Organizations). Finally the paper provides the implication of IDS on Korean healthcare delivery system.

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

A Study on Preconstruction Process in Support of Lean Project Delivery System - Case Study of Children's Hospital at Bellevue, Wa, U.S.A. - (린 건설 관리 방식의 공사 전 설계 진행에 관한 연구 -미국 벨뷰 어린이 병원 사례 조사-)

  • Kim, Yong-Woo;Kim, Kwang-Ho
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.14 no.4
    • /
    • pp.47-54
    • /
    • 2008
  • Preconstruction process in a lean project delivery system was studied in one large healthcare project working for a general contractor. Researchers joined a new lean delivery project for approximately six weeks and participated in preconstruction process including design coordination, management coordination, and target costing while concurrently interviewing other project participants and employees, recording activity in meetings, and otherwise observing the process. The preconstruction process in lean project delivery system, called integrated project design, showed many benefits such as brining expertise of downstream players (i.e., mechanical and electrical contractors) into the design phase. However, lack of leadership and lack of design-integrator blocked the successful application of a new concept of design process.

  • PDF

Categorization of Regional Delivery System for the Elderly Chronic Health Care and Long-Term Care (지역별 노인 만성기 의료 및 요양·돌봄 공급체계 유형화)

  • Nan-He Yoon;Sunghun Yun;Dongmin Seo;Yoon Kim;Hongsoo Kim
    • Health Policy and Management
    • /
    • v.33 no.4
    • /
    • pp.479-488
    • /
    • 2023
  • Background: By applying the suggested criteria for needs-based chronic medical care and long-term care delivery system for the elderly, the current status of delivery system was identified and regional delivery systems were categorized according to quantity and quality of delivery system. Methods: National claims data were used for this study. All claims data of medical and long-term care uses by the elderly and all claims data from long-term care hospitals and nursing homes in 2016 were analyzed to categorize the regional medical and long-term care delivery system. The current status of the delivery system with a high possibility of transition to a needs-based appropriate delivery system was identified. The necessary and actual amount of regional supply was calculated based on their needs, and the structure of delivery systems was evaluated in terms of the needs-based quality of the system. Finally, all regions were categorized into 15 types of medical and care delivery systems for the elderly. Results: Of the total 55 regions, 89.1% of regions had an oversupply of elderly medical and care services compared to the necessary supply based on their needs. However, 69.1% of regions met the criteria for less than two types of needs groups, and 21.8% of regions were identified as regions where the numbers of institutions or regions with a high possibility of transition to an appropriate delivery system were below the average levels for all four needs groups. Conclusion: In order to establish an appropriate community-based integrated elderly care system, it is necessary to analyze the characteristics of the regional delivery system categories and to plan a needs-based delivery system regionally.

A Study on a Real Time Freight Delivery Planning for Supply Center based on GIS (GIS기반의 실시간 통합화물운송시스템 계획에 관한 연구)

  • 황흥석;김호균;조규성
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.75-89
    • /
    • 2002
  • According to the fast-paced environment of information technology and improving customer services, the design activities of logistics systems improve customer centric services and delivery performance implementing e-logistics system. The fundamental design issues that arise in the delivery system planning are optimizing the system with minimum cost and maximum throughput and service level. This study is concerned with the integrated model development of delivery system with customer responsive service level for DCM, Demand Chain Management. We used a two-step approach for this study. First, we formulated the supply. center facility planning using stochastic set-covering problem and assigned the customers to the supply center using clustering algorithm. Second, we developed vehicle delivery planning for a supply center based on GIS, GIS-VRP. Also we developed a GUI-type computer program for proposed method for supply center problem using GIS and Geo-DataBase of Busan area. The computational results showed that the proposed method was very effective on a set of test problems.

Managerial Effectiveness of Integrated Delivery System in Japan (의료서비스 복합화의 경영효과 분석 : 일본의 사례)

  • Jeong, Seung-Won;Inoue, Yusuke;Seo, Young-Joon;Kim, Yun-Hee
    • Korea Journal of Hospital Management
    • /
    • v.14 no.2
    • /
    • pp.60-74
    • /
    • 2009
  • This study purports to verify managerial effectiveness of the integrated delivery system(IDS) of Japanese health care institutions through comparing the managerial performance between hospital groups providing with both acute and nursing care and those with acute care only. Data on the managerial performance of 697 hospitals providing with nursing care together and 819 hospitals providing with acute care only were collected from Japanese Central Social Insurance Medical Councils 2001, 2003, 2005, and were analyzed using mean comparison test(t-test) between the two groups. The results revealed that there were significant differences between the two groups in such indicators as ratio of material cost, labor cost, depreciation rate, total margin, operating margin, average number of outpatient per day, average revenue of an inpatient per day, total amount of labor cost, gross revenue per employee, and labor productivity. However, we could not find out any consistent evidence which support the effect of integrated delivery system on the hospital managerial performance. Further discussion was made on the limitation of the study and future research agenda relevant to the topic.

  • PDF

A Study on Reform Case of the Citizen Service Delivery System by using IT : Focused on the Implementation of Public Utility Charges Depreciation Simplification and its Implications (정보기술을 활용한 주민서비스 전달체계 개선사례 연구 : "공공요금 감면절차 간소화" 구현 및 성공요인 중심)

  • Kim, Wan Pyong
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.3
    • /
    • pp.221-230
    • /
    • 2010
  • Citizens' demand, which has been previously focused on welfare, is now expanding to include elements for higher quality of life such as employment, housing, culture, and sports. Accordingly, the government, with an aim of effectively delivering resident services that satisfy various demands, is committed to transforming the central government-oriented service system into the integrated service system based on public-private partnership. The government is also dedicated to expanding services to 8 areas including not only welfare but also healthcare, employment, housing, education, sports, culture, and tourism, which are directly related to everyday lives of residents. This project is designed to support such reforms in the citizen service delivery system in order to enhance quality of life of local residents. This study is to draw implications from analysis for implementing the citizen service integrated information system in order to reform the citizen service delivery system effectively through examinations and analyses of citizen services provided by the central government. Especially focus on public utility charges depreciation simplification citizen service. Its implications are expected to offer a real contribution for central and local Governments that want to increase the productivity of implementing eGovernment service.

Conditions for Integrated Public Welfare Delivery System: Case Studies in Britain (통합적 공공 복지전달체계를 위한 조건: 영국 사례 연구)

  • Kim, Bo-Yung
    • 한국사회정책
    • /
    • v.25 no.2
    • /
    • pp.403-428
    • /
    • 2018
  • There has been constant attempts for integration of public welfare delivery system which lead to integrated case management, then this become more significant issue regarding 'community care' recently in Korea. However, most of them was limited to fractional organization rearrangement or more use of private resources rather than realising user-centred approach. Therefore, in this research, we would like to do a couple of case studies in Britain which has rich experience of reforms for integrated approaches between health and social services and Troubled Family programme resembles the integrated case management in Korea by visiting a London Borough and a local council respectively. In conclusion, we found three conditions are required to establish successful integrated delivery system: elimination of institutional barriers relating to workforce, organization, and finance; shared objectives and partnership among the professional groups and agencies; and information sharing system with technical support regarding individual cases.

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF