• Title/Summary/Keyword: Integrated Building

검색결과 1,425건 처리시간 0.031초

중수 재이용을 위한 오존 고도산화 및 세라믹 분리막 일체형 공정의 최적화 연구 (Optimization of an Advanced Oxidation with Ozone and Ceramic Membrane Integrated Process for Greywater Reuse)

  • 이종훈;노호정;박광덕;우윤철
    • 한국물환경학회지
    • /
    • 제37권6호
    • /
    • pp.433-441
    • /
    • 2021
  • The aim of this study was to optimize the ozonation and ceramic membrane integrated process for greywater reclamation. The integrated process is a repeated sequential process of filtration and backwash with the same ceramic membrane. Also, this study used ozone and oxygen gas for the backwashing process to compare backwashing efficiency. The study results revealed that the optimum filtration and backwash time for the process was 10 minutes each when comparing the filtrate flow and membrane recovery rate. The integrated process was operated at three different operating conditions with i) 10 minutes for filtration and 10 minutes for ozonation, ii) 10 minutes for filtration and 10 minute for oxygen aeration, and iii) continuous filtration without any aeration for synthetic greywater. The integrated process with ozone backwashing could produce 0.55 L/min of filtrate with an average of 18.42% permeability recovery, while the oxygen backwashing produced 0.47 L/min and 6.26%, respectively. And without any backwashing, the integrated process could produce 0.29 L/min. This shows that the ozone backwash process is capable of periodically recovering from membrane fouling. The resistance of the fouled membrane was approximately 34.4% for the process with ozone backwashing, whereas the resistance was restored by 10.8% for the process with oxygen backwashing. Despite the periodical ozone backwashing and chemical cleaning, irreversible fouling gradually increased approximately 3 to 4%. Approximately 97.6% and 15% turbidity and TOC were removed by ceramic membrane filtration, respectively. Therefore, the integrated process with ozonation and ceramic membrane filtration is a potential greywater treatment process.

도시단위 건축물 CO2 저감을 위한 데이터 통합 활용 기반기술에 관한 연구 (A Study on Integrated Utilization of Urban Spatial Data and Building Data for CO2 Reduction)

  • 최혜미;박창한;김주형;김재준
    • 한국BIM학회 논문집
    • /
    • 제5권3호
    • /
    • pp.1-10
    • /
    • 2015
  • We have researched a character of BIM(Building Information Modeling) and GIS(Geographic Information System) data for integrated utilization of urban spatial data and building data for $CO_2$ reduction. We consider literature on integrated utilization of BIM and GIS and measure method of $CO_2$ in urban spatial unit. Among them without distortion of standard data structure, derive method how to install between BIM and GIS standard data. Rhino & Grasshopper is utilization tools of DB platform. The compatibility with existing BIM and GIS data format, graphic and numeric results can be output at the same time. And using the existing ARCHSIM, it can be easily combined for building energy analysis program. Based on BIM and GIS data to run an energy analysis target on Majang-dong, it could be poly synthetically derived the value information and graphic information.

Comparative study on the effect of cooling & heating loads by lighting energy of various light sources in an office building

  • Hong, Won Pyo
    • 조명전기설비학회논문지
    • /
    • 제30권3호
    • /
    • pp.94-105
    • /
    • 2016
  • The objective of the work was to evaluate the impact of lighting energy to cooling and heating consumption in medium scale office building, when currently installed fluorescent lights were replaced with various LED lighting fixtures. This evaluation comes from an integrated approach combining the proper indoor lighting environment and the thermal aspects of cooling & heating consumption in office building. These simulations were performed by coupling an appropriate luminaire analysis for energy consumption and a dynamic thermal simulation software (TRNSYS). To analyze comparative study of effects on the heating, cooling loads, and energy consumption of an LED lamp application, 2 types of LED lamp with low light power watt(LPW) 24W and high LPW 7.5W and a fluorescent lights(FL) with 37W are used respectively. Integrated building energy consumption decreased up to 3.2% when fluorescent lamps were replaced with LEDs. Thus, the high LPW of LED(7.5W) replaced with the same number of FL shows an effective energy saving and cost- effective luminary.

영역분할과 컬러 특징을 이용한 건물 인식기법 (Building Recognition using Image Segmentation and Color Features)

  • 허정훈;이민철
    • 로봇학회논문지
    • /
    • 제8권2호
    • /
    • pp.82-91
    • /
    • 2013
  • This paper proposes a building recognition algorithm using watershed image segmentation algorithm and integrated region matching (IRM). To recognize a building, a preprocessing algorithm which is using Gaussian filter to remove noise and using canny edge extraction algorithm to extract edges is applied to input building image. First, images are segmented by watershed algorithm. Next, a region adjacency graph (RAG) based on the information of segmented regions is created. And then similar and small regions are merged. Second, a color distribution feature of each region is extracted. Finally, similar building images are obtained and ranked. The building recognition algorithm was evaluated by experiment. It is verified that the result from the proposed method is superior to color histogram matching based results.

PV모듈의 지붕 적용 유형 분류 및 특성 분석 (An analysis of Classification and Characteristics of PV Modules Applied into Building Roof)

  • 문종혁;김진희;김용재;김준태
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2009년도 추계학술발표대회 논문집
    • /
    • pp.251-258
    • /
    • 2009
  • Building-Integrated Photovoltaics (BIPV) is a photovoltaic (PV) technology which can be incorporated into the roofs walls of both commercial and domestic buildings to provide a source of electricity. BIPV systems can operate as a multi-functional building components, which generates electricity and serves as part of building envelope. It can be regarded as a new architectural elements, adding to the building's aesthetics. Applying PV modules on roof has an advantage over wall applications as they seem to receive more solar radiation on PV modules. There are various types of PV applications on building roofs: attached, on-top and integrated. This paper describes the classification and characteristics of PV applications on roofs.

  • PDF

Exploring Integrated Design Strategies for the Optimal Use of BIM

  • Park, Hyoung-June;Lee, Ji-Hyun
    • Architectural research
    • /
    • 제12권2호
    • /
    • pp.9-14
    • /
    • 2010
  • This paper introduces an experimental design studio that explores the optimal use of current digital technologies in order to employ Building Information Modeling at the early phase of design process. Based upon the outcomes from the aforementioned studio, the paper discusses the integrated design strategies for BIM in the design process. In this paper, BIM is proposed as a design tool that increases an overal design productivity more effectively and efficiently compared to BIM as a construction tool with encouraging a design communication among different partakers in the design process.

투광형 비정질 BIPV 시스템의 LCC 평가에 관한 연구 (A Study on the Life Cycle Cost Analysis of the See-through a-si Building Integrated Photovoltaic System)

  • 이한명;오민석;김회서
    • 한국태양에너지학회 논문집
    • /
    • 제29권1호
    • /
    • pp.1-10
    • /
    • 2009
  • This study was carried out to evaluate the Life Cycle Cost(LCC) of three types of RTPV(Building Integrated Photovoltaic) systems-Glass plus Granite. Crystalline BIPV and See through Amorphous BIPV-which were vertically installed to generate the same power output(76 kW level). Initial investment costs. cost. savings and maintenance costs had been predicted during the period of analysing the LCC of three types of BIPV(Building Integrated Photovoltaic) systems installed for the purpose of evaluating the LCC. In case of cost savings, it had been analyzed by measuring the amount of electric power generated, reduction in lighting load and heat & cooling loads through simulation. From this analysis, it was predicted that the See-through amorphous BIPV offering cost saving advantages demonstrated the economical efficiency similar to the Class plus Granite when it is backed by more than 20 years of durability.

R&D 전주기 지원형 과학기술 지식인프라 통합서비스 구축에 관한 연구 (A Study on the Building of Integrated Service for Science and Technology Knowledge Infrastructure Supporting the Entire R&D Cycle)

  • 이석형
    • 한국비블리아학회지
    • /
    • 제31권3호
    • /
    • pp.235-256
    • /
    • 2020
  • 본 연구의 목적은 R&D 활동에 도움이 되는 다양한 과학기술 지식인프라를 통합적으로 서비스하기 위한 통합서비스 구축 방법을 정의하고 실제 구축 사례를 보이는데 있다. 아이디어 생성/개발, 펀딩파악, 과제수행, 성과창출 확산 등 R&D 전주기별로 산재되어 있는 지식인프라들을 서비스·기능·정보·데이터 측면에서 세분화하여 연계, 융합함으로써 한 곳에서 이용자가 원하는 지식인프라를 적시에 제공할 수 있는 통합시스템 구축 방법을 제시하였다. 특히 본 연구에서는 통합서비스가 개별 지식인프라 서비스의 물리적 통합이 아닌 논리적 연계·통합을 고려하여 통합서비스 분류체계, 통합수준모델, 통합아키텍처, 이용자 통합인증체계를 정의하여 통합서비스 구축의 효율성과 유사 통합서비스 구축시 참조모델로의 확장성을 고려하였다.

초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구 (The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction)

  • 이동윤;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

건물 지붕 구조를 활용한 건물일체형 풍력발전시스템의 성능 예측 (Pitched Roof-Building Integrated Wind Turbine System Performance Estimation)

  • 최형식;장호남
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 추계학술대회 논문집
    • /
    • pp.324-327
    • /
    • 2008
  • We simulated the performance improvement of a wind turbine installed on the pitched roof-building(apartment in urban area, 50m height). A nozzle shape wind guide is added on the roof of a model apartment. The nozzle-diifuser structure effects for the free stream wind (average 4m/s, 50m height in Incheon) is studied by a basic CFD analysis. This paper examines the effects of roof structure on the wind velocity and the wind distortion effects by a front building. The possible wind power generation capacity on building roof in urban is calculated.

  • PDF