• Title/Summary/Keyword: Installation priority

Search Result 87, Processing Time 0.023 seconds

Decision of Maintenance Priority Order for Substation Facility through Structural Importance and Fault Analysis (변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정)

  • Lee, Sung-Hun;Lee, Yun-Seong;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.23-30
    • /
    • 2013
  • Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.

Development and Application of CCTV Priority Installation Index using Urban Spatial Big Data (도시공간빅데이터를 활용한 CCTV 우선설치지수 개발 및 시범적용)

  • Hye-Lim KIM;Tae-Heon MOON;Sun-Young HEO
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.27 no.2
    • /
    • pp.19-33
    • /
    • 2024
  • CCTV for crime prevention is expanding; however, due to the absence of guidelines for determining installation locations, CCTV is being installed in locations unrelated to areas with frequent crime occurrences. In this study, we developed a CCTV Priority Installation Index and applied it in a case study area. The index consists of crime vulnerability and surveillance vulnerability indexes, calculated using machine learning algorithms to predict crime incident counts per grid and the proportion of unmonitored area per grid. We tested the index in a pilot area and found that utilizing the Viewshed function in CCTV visibility analysis resolved the problem of overestimating surveillance area. Furthermore, applying the index to determine CCTV installation locations effectively improved surveillance coverage. Therefore, the CCTV Priority Installation Index can be utilized as an effective decision-making tool for establishing smart and safe cities.

Direct Load Control Using Priority Based Dynamic Programming (우선순위기반 동적 프로그래밍을 이용한 직접부하제어)

  • Kim, Tae-Hyun;Lee, Seung-Youn;Shin, Myong-Chul;Cha, Jae-Sang;Suh, Hee-Seok;Kim, Jong-Boo;Choi, Sang-Yul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.6
    • /
    • pp.78-83
    • /
    • 2004
  • Currently used DLC(Direct Load Control) algorithm is only focused on ON/OFF load control not concerning about reliving participated customer's inconvenience and load priority. Therefore, that is a major obstacle to attract customer participating in demand response program. To overcome the above defects, the authors represent direct load control algorithm using priority based dynamic programming. the proposed algorithm is that participant customer send E-mail to DLC center about priority of load before executing DLC, then DLC algorithm decide which load to be OFF by using priority and off time constraint of the load. By using dynamic programming based on the order of priority for DLC algorithm it is possible to maximize participating customer's satisfaction and it will help to attract more customer's participating in demand response program.

Suggestion of Installation Criteria on Intersection Notification Divice (교차로 알림이 설치기준 제시에 관한 연구)

  • Jin, Tae-Hee;Kwon, Sung-Dae;Oh, Seok-Jin;Ha, Tae-Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.73-80
    • /
    • 2019
  • Traffic Safety and efficient Road Traffic Policy of Traffic management came into effect over the certain size of the road like main road. Comparatively, Safety for Living street is deteriorated. Especially, Vehicle are usually priority to the life-zone street, even though Safety for the Passengers are essential to the life-zone street in the residential area. Improvement for the Living street has not been achieved In this study, To suggest Intersection Notifications standard of installation in Living Street, We execute on-site survey in priority to Gwangju Metropolitan City. Furthermore, After We suggest experimental value for the Intersection Notifications' standard of installation Prediction model in the Living street, Intersection Notifications compare & veritfy experimental value to the installation point's value to suggest the standard of installation in the living street. As a result, We can prevent frequent traffic accident in the Living Street. Furthermore, We are judged by installation of intersection Notifications considering stability and convenience to the passengers who are using the living street.

A Study on Priority Evaluation of the Rope-type Platform Safety Door(RPSD) Installation by Multi-criteria Decision Analysis (다기준 분석에 의한 로프형 승강장 안전도어의 설치 우선순위 산정에 관한 연구)

  • Jung, Byung Doo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.639-645
    • /
    • 2015
  • Recently, a study on the commercialization of Rope type Platform Safe Door (RPSD) technology has commenced. The study focuses on RPSD, in which a rope screen ascends to allow safe passage from the platform to the transit vehicle in aboveground stations. Currently, a pilot installation has taken in place with Daegu Metro Line 2 in MoonYang station starting from March of 2013. However, there is a need to select an appropriate pilot installation's object for the improvement in the future RPSD. An appropriate designation would correspond with the needs of the railroad corporation and as a historic railway platform with safe facilities. This study tried to usa Analytic Hierarchy Process (AHP) to determine the priority of the KTX stations to attain a list of appropriate designations for future RPSD installations by analyzing the followings: management of the facilities, operational risks, and intent of business projects. As a case study, it was applied to the evaluation of the KTX stations. For the application, it used relative measurement to calculate the weight of upper level structuring, and absolute measurement for low level structuring instead of pairwise comparisons.

Determination of Installation Priority of Washlands Using Multi-Dimensional Scaling Method (다차원척도법을 이용한 강변저류지 설치 우선순위 선정)

  • Ahn, Tae-Jin;Kim, Do-Hyeon;Baek, Chun-Woo
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.7
    • /
    • pp.565-576
    • /
    • 2011
  • Within a basin, there are potentially multiple locations that can be used as a washland, given their relatively small size when compared with other hydraulic facilities such a dam. However, it is unreasonable to install washlands in all these potential locations due to economic and environmental considerations. In this study, a new methodology for determination of installation priority of washlands is presented. How to integrate the decision variables in this decision making problem has been a key issue in previous studies because a washland can provide many benefits such as flood reduction, agricultural benefit and recreational benefit. In particular, a methodology is needed to integrate all decision variables realistically, properly and reasonably, in situations where there is not sufficient data for direct integration of all these decision variables such as construction cost or benefits a washland can provide. This new methodology aims to suggest how to integrate methodologies used in previous studies. The suggested methodology uses four different rankings which are determined based on a flood reduction effect, a relative significance index, an economic analysis, and a space planning suitability index. These rankings are integrated to determine a final installation priority ranking of washlands by a multi-dimensional scaling method. The new methodology has been applied to the Anseong river basin, to show its applicability, and the application result compared with those of previous studies.

Performance Analysis of Backoff Algorithm in Wireless LANs with Prioritized Messages (무선랜 환경에서 우선순위를 고려한 백오프 알고리듬 성능분석)

  • Jeong Seok-Yun;Heo Seon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1656-1660
    • /
    • 2006
  • Distributed coordination function(DCF) is the primary random access mechanism of IEEE 802.11, which is the basic protocol of wireless LAN based on the CSMA/CA protocol. It enables fast installation with minimal management and maintenance costs and is a very robust protocol for the best effort service in wireless medium. The current DCF, however, is known to be unsuitable for real-time applications such as voice message transmission. In this paper, we focus on the performance issues of IEEE 802.11 which accommodate the prioritized messages. Existing results use the initial window size and backoff window-increasing factor as tools to handle the priority of the messages. Instead, we introduce a novel scheme which chooses the backoff timer with arbitrary probabilities. By this, one can greatly reduce the backoff delay of the lower priority messages without degrading the performance of higher priority.

  • PDF

Qualitative Assessment for Hazard on the Electric Power Installations of a Construction Field using FMEA (FMEA를 이용한 건설현장 전력설비의 위험성에 대한 정성적 평가)

  • Kim Doo-hyun;Lee Jong-ho
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.4 s.68
    • /
    • pp.36-41
    • /
    • 2004
  • This paper presents an qualitative assessment for hazard on the electric power installations of a construction field using FMEL The power installations have the mission to maintain the highest level of service reliability on the works. The more capital the electric power invest the higher service reliability they plausibly will achieve. However, because of limited resources, how effectively budgets can be allocated to achieve service reliability as high as possible. The assessment typically generates recommendations for increasing component reliability, thus improving the power installation safety. The FMEA tabulates the failure modes of components and how their failure affects the power installations being considered. Tn order to estimate the risks of a failures, the FMEA presents criticality estimation or risk priority number using the severity, occurrence, and detectability. The results showed that the highest components of the risk priority number among components were condenser, transformer, MCCB and LA. And In case of the criticality estimation, the potential failure modes were abnormal temperature rise, insulation oil leakage, deterioration for the transformer, overcurrent for the MCCB and operation outage fir the LA.

Determination of Critical Hazard Factors in Vehicle-Mounted MEWP using Fuzzy-FMEA (퍼지-FMEA기법을 이용한 차량탑재형 고소작업대 사고의 주요 유해위험요소 위험우선순위 결정)

  • Seyoon Oh;Kangdon Lee;Jaeho ,Shin;Jae-Yong Lim
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.1
    • /
    • pp.9-17
    • /
    • 2023
  • In this study, we aimed to identify the important hazard factors and determine their criticality in causing serious accidents in vehicle-mounted mobile elevated work platforms (MEWPs). Fuzzy failure modes and effects analysis (FMEA)was performed using accident data and a survey of experts. To determine the hazard factors, the accident data for the last 10 years were used and a questionnaire survey was designed. The questionnaire survey was sent to four experts in the field of occupational safety to determine the severity, occurrence, and detectability of serious accidents in MEWPs. Furthermore, objective RPN scores and risk priority were obtained using fuzzy FMEA. Finally, the criticality of hazard factors in descending order was found to be overloading, non-installation or defective installation of outriggers, breakage due to wire rope aging, and illegal remodeling of vehicle structures. The results were verified by comparing the occurrence data of serious disasters.

Analysis of Risk Priority Number for Grid-connected Energy Storage System (계통연계형 에너지저장시스템의 위험우선순위 분석)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Park, Jeon-Su;Kim, Eun-Jin;Kim, Eui-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.10-17
    • /
    • 2016
  • The purpose of this paper is to deduct components that are in the group of highest risk(top 10%). the group is conducted for classification into groups by values according to risk priority through risk priority number(RPN) of FMEA(Failure modes and effects analysis) sheet. Top 10% of failure mode among total potential failure modes(72 failure modes) of ESS included 5 BMS(battery included) failure modes, 1 invert failure mode, and 1 cable connectors failure mode in which BMS was highest. This is because ESS is connected to module, try, and lack in the battery part as an assembly of electronic information communication and is managed. BMS is mainly composed of the battery module and communication module. There is a junction box and numerous connectors that connect these two in which failure occurs most in the connector part and module itself. Finally, this paper proposes RPN by each step from the starting step of ESS design to installation and operation. Blackouts and electrical disasters can be prevented beforehand by managing and removing the deducted risk factors in prior.