• 제목/요약/키워드: Installation priority

검색결과 87건 처리시간 0.029초

변전설비의 구조적 중요도와 고장 분석을 통한 유지보수 우선순위 선정 (Decision of Maintenance Priority Order for Substation Facility through Structural Importance and Fault Analysis)

  • 이성훈;이윤성;김진오
    • 조명전기설비학회논문지
    • /
    • 제27권4호
    • /
    • pp.23-30
    • /
    • 2013
  • Reliability Centered Maintenance(RCM) is one of most widely used methods in the modern power system to schedule a maintenance cycle and determine the priority of inspection. A precedence study for the new structure of rearranged system should be performed due to introduction of additional installation. This paper proposes a new method to evaluate the priority of maintenance and inspection of the power system facilities. In order to calculate that risk index, it is required that the reliability block diagram should be analyzed for the power system. Additionally, a fault cause analysis is also performed through the event-tree analysis.

도시공간빅데이터를 활용한 CCTV 우선설치지수 개발 및 시범적용 (Development and Application of CCTV Priority Installation Index using Urban Spatial Big Data)

  • 김혜림;문태헌;허선영
    • 한국지리정보학회지
    • /
    • 제27권2호
    • /
    • pp.19-33
    • /
    • 2024
  • 방범용 CCTV는 지속적으로 증설되고 있으나 설치 위치 결정에 대한 가이드라인의 부재로 범죄 발생 다발지역과 무관한 위치에 CCTV가 설치되는 경우가 많다. 이에 본 연구에서는 도시공간빅데이터를 활용하여 CCTV 우선설치지수를 개발하고, 사례지역에 시범 적용하여 적용 가능성을 타진하였다. CCTV 우선설치지수는 범죄취약지수와 감시취약지수로 구성하였으며, 각각 머신러닝 알고리즘을 통해 예측한 그리드별 범죄발생건수, 가시권 분석을 통해 산출한 그리드별 감시불가면적의 비율을 활용하여 산출하였다. 지수를 시범지역에 적용한 결과 CCTV 가시권 분석에 Viewshed 기능을 활용함으로써 기존 버퍼 기능 활용 시 감시면적이 과대 추정되었던 문제를 해결할 수 있었다. 또한 해당 지수를 적용하여 CCTV 설치 위치를 결정할 경우, 감시면적을 효율적으로 개선 가능하다. 본 연구의 CCTV 위치 결정 프로세스에 따라 사례지역에 신규 CCTV를 추가 설치할 경우, 도로면적 대비 감시면적이 43.25%에서 83.73%로 증가하였다. 따라서, CCTV 우선설치지수는 스마트안전도시 조성을 위한 효과적인 의사결정 도구로 활용될 수 있을 것이다.

우선순위기반 동적 프로그래밍을 이용한 직접부하제어 (Direct Load Control Using Priority Based Dynamic Programming)

  • 김태현;이승연;신명철;차재상;서희석;김종부;최상열
    • 조명전기설비학회논문지
    • /
    • 제18권6호
    • /
    • pp.78-83
    • /
    • 2004
  • 현재 운용되고 있는 직접부하제어 알고리즘은 직접부하제어 사업에 참여에 따른 수용가의 개별 부하별 우선순위가 고려되지 않고 있고, 또한 제어 시간도 수용가의 불편을 고려되지 않고 획일적으로 일정 시간대에 일률적으로 수용가의 부하를 제어함으로써 참여 수용가의 불편 증대로 참여율이 저조한 실정이다. 따라서 본 연구에서는 참여 수용가의 불편을 최소화시키고 또한 개별 부하에 대한 우선순위 요구를 최대한으로 반영하기 위해 우선순위 기반 동적 프로그래밍을 이용한 직접부하제어 알고리즘을 제시한다. 제시되는 알고리즘은 직접부하제어가 발생되기 1시간 전에 참여 수용가가 스스로 해당 부하의 우선순위를 결정하여 직접부하제어 센터로 I-Mail 등으로 보네면 센터에서는 현재 부하의 전력량과 우선순위 그리고 OFF주기 등을 고려하여 동적 프로그래밍을 수행하여 OFF되어야 할 부하들을 선택하게 된다.

교차로 알림이 설치기준 제시에 관한 연구 (Suggestion of Installation Criteria on Intersection Notification Divice)

  • 진태희;권성대;오석진;하태준
    • 대한토목학회논문집
    • /
    • 제39권1호
    • /
    • pp.73-80
    • /
    • 2019
  • 교통안전과 효율적인 교통관리의 도로교통정책이 간선도로 등 일정규모 이상의 도로에서 주로 이루어지고 있어 상대적으로 생활도로의 안전성은 열악한 상황이다. 특히, 보행자의 안전이 주가 되어야 할 주거지역의 생활권 도로까지 차량이 우선시 되는 경우가 발생하는 등 상대적으로 생활도로에 대한 개선은 이루지 못한 실정이다. 이에 본 연구는 생활도로 내 교차로 알림이 설치기준을 제시하기 위하여 광주광역시를 중심으로 현장조사를 실시하였고, 생활도로내 교차로에 영향을 미치는 영향인자와의 관계를 다중회귀분석을 통한 예측모형으로 도출하였다. 나아가 생활도로내 사고예측 모형을 통한 실측값을 제시 한 후 교차로 알림이가 설치된 지점의 값과 비교 검증하여 생활도로내 교차로 알림이 설치기준을 제시하였다. 이를 통해 생활도로 내 잦은 교통사고를 예방하고 생활도로를 이용하는 이용자들의 편의성 및 안전을 고려한 교차로 알림이 설치가 이루어 질 수 있을 것으로 기대된다.

다기준 분석에 의한 로프형 승강장 안전도어의 설치 우선순위 산정에 관한 연구 (A Study on Priority Evaluation of the Rope-type Platform Safety Door(RPSD) Installation by Multi-criteria Decision Analysis)

  • 정병두
    • 대한토목학회논문집
    • /
    • 제35권3호
    • /
    • pp.639-645
    • /
    • 2015
  • 최근 지상역 승강장에서 승객의 안전 확보, 지상역 조건과 열차 차종 자동 인식에 따른 상하 개폐 기능이 탑재된 Rope 스크린도어의 실용화 기술에 대한 연구개발이 수행되고 있다. 현재 대구도시철도 2호선 문양역에 2013년 3월부터 시범설치 운영 중에 있으나, 앞으로 개선된 RPSD에 대하여 고속철도 역사를 대상으로 각 철도운영기관의 니즈에 부합하고, 철도 승강장 안전시설로써 역사에 적합한 시범사업 대상지를 선정할 필요성이 있다. 따라서 본 연구에서는 AHP를 이용하여 각 KTX역의 위험도 분석과 시설관리 및 운영기관의 사업추진의지 등 정책적 분석기준에 따라 RPSD 설치 대상지 우선순위를 분석하였다. 또한 AHP를 적용함에 있어 사례 분석할 KTX역과 같이 평가대상이 많을 경우 쌍대비교에 의한 우선순위 평가가 불가능하기 때문에, 상위 평가항목에 대해서는 상대평가에 의해 가중치를 구하고, 각각의 하위 목적요소에는 평점에 의한 절대평가법을 조합하여 우선순위를 산정하였다.

다차원척도법을 이용한 강변저류지 설치 우선순위 선정 (Determination of Installation Priority of Washlands Using Multi-Dimensional Scaling Method)

  • 안태진;김도현;백천우
    • 한국수자원학회논문집
    • /
    • 제44권7호
    • /
    • pp.565-576
    • /
    • 2011
  • 본 연구에서는 대상유역 내에 설치가 가능한 지역이 다수 존재하는 강변저류지의 설치 우선순위를 결정하기 위한 방안을 제시하였다. 강변저류지의 최적위치 선정을 위해 기존의 수행된 연구들은 각각의 장단점이 있으나, 의사결정을 위해 사용되는 변수의 통합과정에서 발생하는 오류는 해결해야할 가장 큰 문제이다. 특히 의사결정을 위해 고려해야할 다양한 변수를 하나의 기준으로 통합하기 위한 자료가 불충분한 국내의 경우, 의사결정을 위해 사용되는 가정들을 최소화하며, 다양한 변수들은 모두 고려할 수 있는 방안이 필요하게 된다. 본 연구에서는 제안된 기법은 강변저류지 최적위치 선정을 위해 수행된 기존 연구결과들의 장점을 포함하며, 보다 많은 변수들을 고려할 수 있도록 개발되었다. 기존에 제안된 방법을 이용하여 단위저류용량대비 홍수저감효과에 의한 우선순위, 상대적 중요도를 고려한 우선순위, 경제성평가에 의한 우선순위 및 공간계획적합성 평가에 의한 우선순위를 선정하고, 이들 네 가지 순위와 다차원척도법을 이용하여 최종적인 하나의 순위를 도출한다. 제안된 기법을 안성천유역의 13개 후보강변저류지를 대상으로 적용하였으며, 기존의 연구결과와 비교하였다.

무선랜 환경에서 우선순위를 고려한 백오프 알고리듬 성능분석 (Performance Analysis of Backoff Algorithm in Wireless LANs with Prioritized Messages)

  • 정석윤;허선
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.1656-1660
    • /
    • 2006
  • Distributed coordination function(DCF) is the primary random access mechanism of IEEE 802.11, which is the basic protocol of wireless LAN based on the CSMA/CA protocol. It enables fast installation with minimal management and maintenance costs and is a very robust protocol for the best effort service in wireless medium. The current DCF, however, is known to be unsuitable for real-time applications such as voice message transmission. In this paper, we focus on the performance issues of IEEE 802.11 which accommodate the prioritized messages. Existing results use the initial window size and backoff window-increasing factor as tools to handle the priority of the messages. Instead, we introduce a novel scheme which chooses the backoff timer with arbitrary probabilities. By this, one can greatly reduce the backoff delay of the lower priority messages without degrading the performance of higher priority.

  • PDF

FMEA를 이용한 건설현장 전력설비의 위험성에 대한 정성적 평가 (Qualitative Assessment for Hazard on the Electric Power Installations of a Construction Field using FMEA)

  • 김두현;이종호
    • 한국안전학회지
    • /
    • 제19권4호
    • /
    • pp.36-41
    • /
    • 2004
  • This paper presents an qualitative assessment for hazard on the electric power installations of a construction field using FMEL The power installations have the mission to maintain the highest level of service reliability on the works. The more capital the electric power invest the higher service reliability they plausibly will achieve. However, because of limited resources, how effectively budgets can be allocated to achieve service reliability as high as possible. The assessment typically generates recommendations for increasing component reliability, thus improving the power installation safety. The FMEA tabulates the failure modes of components and how their failure affects the power installations being considered. Tn order to estimate the risks of a failures, the FMEA presents criticality estimation or risk priority number using the severity, occurrence, and detectability. The results showed that the highest components of the risk priority number among components were condenser, transformer, MCCB and LA. And In case of the criticality estimation, the potential failure modes were abnormal temperature rise, insulation oil leakage, deterioration for the transformer, overcurrent for the MCCB and operation outage fir the LA.

퍼지-FMEA기법을 이용한 차량탑재형 고소작업대 사고의 주요 유해위험요소 위험우선순위 결정 (Determination of Critical Hazard Factors in Vehicle-Mounted MEWP using Fuzzy-FMEA)

  • 오세윤;이강돈;신재호;임재용
    • 한국안전학회지
    • /
    • 제38권1호
    • /
    • pp.9-17
    • /
    • 2023
  • In this study, we aimed to identify the important hazard factors and determine their criticality in causing serious accidents in vehicle-mounted mobile elevated work platforms (MEWPs). Fuzzy failure modes and effects analysis (FMEA)was performed using accident data and a survey of experts. To determine the hazard factors, the accident data for the last 10 years were used and a questionnaire survey was designed. The questionnaire survey was sent to four experts in the field of occupational safety to determine the severity, occurrence, and detectability of serious accidents in MEWPs. Furthermore, objective RPN scores and risk priority were obtained using fuzzy FMEA. Finally, the criticality of hazard factors in descending order was found to be overloading, non-installation or defective installation of outriggers, breakage due to wire rope aging, and illegal remodeling of vehicle structures. The results were verified by comparing the occurrence data of serious disasters.

계통연계형 에너지저장시스템의 위험우선순위 분석 (Analysis of Risk Priority Number for Grid-connected Energy Storage System)

  • 김두현;김성철;박전수;김은진;김의식
    • 한국안전학회지
    • /
    • 제31권2호
    • /
    • pp.10-17
    • /
    • 2016
  • The purpose of this paper is to deduct components that are in the group of highest risk(top 10%). the group is conducted for classification into groups by values according to risk priority through risk priority number(RPN) of FMEA(Failure modes and effects analysis) sheet. Top 10% of failure mode among total potential failure modes(72 failure modes) of ESS included 5 BMS(battery included) failure modes, 1 invert failure mode, and 1 cable connectors failure mode in which BMS was highest. This is because ESS is connected to module, try, and lack in the battery part as an assembly of electronic information communication and is managed. BMS is mainly composed of the battery module and communication module. There is a junction box and numerous connectors that connect these two in which failure occurs most in the connector part and module itself. Finally, this paper proposes RPN by each step from the starting step of ESS design to installation and operation. Blackouts and electrical disasters can be prevented beforehand by managing and removing the deducted risk factors in prior.