• Title/Summary/Keyword: Installation of ceiling and wall

Search Result 25, Processing Time 0.017 seconds

Evaluating Importance of Defects through Defect Dispute Case Study in Apartment Buildings (하자분쟁사례를 통한 공동주택 하자 중요도 평가에 관한 연구)

  • Lee, Sang-Hoon;Kim, Jae-Jun;Lee, Sang-Hyo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.56-64
    • /
    • 2019
  • Various defects that occur in the maintenance stage are connected to all kinds of wasted resources and economic losses as additional investments are made. Residents are harmed temporally, materially, and psychologically, and businesses suffer not only monetary losses but also reduced credit ratings. The aim of this study was to increase the efficiency of quality management and minimize defect disputes by estimating the importance of the defect type considering the defect frequency and severity in apartment buildings. For this, 7,548 defect items for 48 apartment buildings were examined. The analysis confirmed that defects are concentrated on RC, finishing and MEP work. In addition, defects with high importance are identified as broken, incorrect installation, missing tasks, and water problems. In addition, the exterior wall/roof, the Internal wall, ceiling, and floor, which are constructed in the field, are more important than the furniture and MEP equipment installed in the field.

An Experimental Study of Sprinkler system for Sandwich Panel Wall Protection (샌드위치패널 벽면보호용 스프링클러설비 적용 실험)

  • Seo, Dong-Hun;Kim, Won-Hyung;Kim, Jong-Hoon;Lee, Young-Jae
    • Fire Science and Engineering
    • /
    • v.31 no.5
    • /
    • pp.37-43
    • /
    • 2017
  • Domestic sandwich panel buildings are widely used on walls and roofs of factories and warehouse facilities. Factory and warehouse facilities have high fire load and rapid spread of fire due to their use characteristics, leading to large fires. Due to the characteristics of materials, walls and roofs are collapsed, resulting in life damage and property damage. In this regard, this study examined domestic and international standards of sprinkler facilities to prevent ignition of sandwich panel walls. Also, in order to check whether the fire was prevented by installing the head on the wall of the sandwich panel, the fire test was carried out with 10 cm, 60 cm, and 120 cm from the wall along the sprinkler head installation standard of domestic fire safety standards. As a result of the fire test, it was confirmed that the sandwich panel was prevented from igniting when the head of water pressure 0.1 MPa and water quantity K-80 was installed. According to the separation distance, it was impossible to measure the temperature at 10 cm, but at 60 cm, At the maximum temperature of $525^{\circ}C$ and 120 cm, the maximum temperature of the wall of the sandwich panel was measured as $276^{\circ}C$. As a result of the fire test, considering the fire point of 450 degrees Celsius in the fire test of the sandwich panel, the distance from the sandwich panel wall to the combustible is more than 120 cm.

Consequence Analysis of Hydrogen Filling Stations based on Cascade Compressing Systems (케스케이드 방식 압축시스템 기반의 수소충전소에 대한 정성적 위험성평가)

  • Ahn, Byeong-Jun;Rhim, Jong-Kuk
    • Journal of the Korean Institute of Gas
    • /
    • v.25 no.2
    • /
    • pp.13-21
    • /
    • 2021
  • Because of the recent expansion of hydrogen vehicle supply, the installation of hydrogen filling station is expected to gradually expand. This study attempts to predict the damage scale and propose a safer design form based on the scenario that assumes the worst case of a hydrogen station. A Flacs solver using computational fluid dynamics (CFD) was used to predict the damage scale, and the accuracy was verified by comparing it with the experimental results of previous researchers. The damage scale prediction was conducted for hydrogen leakage and explosion, and the prediction target was the KR model based on the measured values. And as a comparative review model, a roofless model was selected without a ceiling. As a result of analyzing the two models, it was possible to confirm the accumulation and retention of hydrogen gas up to 60 vol% or more in the KR model, whereas in the case of the Roofless model, the phenomenon of discharge and diffusion to the outside of the charging station by riding the wall after leakage. I was able to check. In conclusion, it was reviewed that the type of hydrogen charging station without ceiling is more advantageous for safety than the hydrogen filling station model.

Sound absorption characteristics of foamed aluminum considering installing on the wall and in the space (발포알루미늄의 시공방법에 따른 흡음 특성에 관한 연구)

  • Park, Hyeon-Ku;Kim, Hang
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.1
    • /
    • pp.50-55
    • /
    • 2017
  • Foamed aluminum is an eco-friendly material that is reusable and safe against fire. These superior characteristics have many advantages in the field of building and construction and in cruise ships as sound absorbers. So far, the research on foamed aluminum has been focused on the sound absorption performance using the foaming ratio. Foamed aluminum, when compared with the existing sound absorbers such as glass wool or rock wool, has a better structural performance, and it can be installed on walls in many different ways. This study conducted experiments on the sound absorption characteristics considering the various applications of foamed aluminum. The effects of painting surfaces with the finishing material were compared to that of the normal surface, and the effects of vertical installation and hanging from the ceiling was compared with the effects of installing on the floor.

Design of Emergency Light - Focusing on Public Facilities (피난유도등 디자인 연구 -다중이용시설을 중심으로)

  • Yoo, Ga-Hee;Yang, Sung-Ho
    • Journal of the Korea Convergence Society
    • /
    • v.11 no.1
    • /
    • pp.301-308
    • /
    • 2020
  • Based on the analysis of fire escape situations in public facility, this study was intended to propose a design of emergency light suitable for fire in public facility. A video analysis was conducted to understand the evacuation situation of public facility because the fire could not be randomized due to the disaster. Through video analysis, we were able to identify inconvenience and necessary needs in avoiding fire in public facility and reflected them in the design of emergency light, etc. As a result of the design of emergency light, the wall type induction lamp had different LED layout structures to minimize the thickness of the product. Ceiling induction lamps have been supplemented for additional installation in corridors of complex structures. The results of this study are designed based on the criteria used in the manufacture of actual emergency light and we intend to explore ways to be practical through further experiment measurements and complementary steps through expert advice.