Structural Capacity Evaluation of System Scaffolding using X-Type Advanced Guardrail (교차가새형 선행 안전난간을 적용한 시스템비계의 구조 성능 평가)

  • Park, J.D.;Lee, H.S.;Shin, W.S.;Kwon, Y.J.;Park, S.E.;Yang, S.S.;Jung, K.
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.49-58
    • /
    • 2020
  • In domestic construction sites, when installing steel pipe scaffolding and system scaffolding, the guardrails are installed after the installation of the work platforms. This conventional guardrail system (CGS) is always exposed to the risk of falls because the safety railing is installed later. In order to prevent fall disasters during erecting and dismantling scaffolds, it is necessary to introduce the advanced guardrail system (AGS) which installs railings in advance of climbing onto a work platform. For the introduction of the AGS, the structural performance of the system scaffolding applying the CGS and the AGS was compared and evaluated. The structural analysis of the system scaffold (height: 31 m and width: 27.4 m) with AGS confirmed that structural safety was ensured because the maximum stress of each element of the system scaffolding satisfies the allowable stress of each element. As a result of performance comparison of CGS and AGS for each element, the combined stress ratio of vertical posts in AGS was 6.4% lower than that of CGS. In addition, in the case of ledger and transom, the combined stress ratios of AGS and CGS were almost the same. The compression test of the assembled system scaffolding (three-storied, 1 bay) showed that the AGS had better performance than the CGS by 9.7% (8.91 kN). The cross bracing exceeds the limit on slenderness ratio of codes for structural steel design. But the safety factor for the compressive load of the cross bracing was evaluated as meeting the design criteria by securing 3 or more. In actual experiments, it was confirmed that brace buckling did not occur even though the overall scaffold was buckled. Therefore, in the case of temporary structures, it was proposed to revise the standards for limiting on slenderness ratio of secondary or auxiliary elements to recommendations. This study can be used as basic data for the introduction of AGS for installing guardrails in advance at domestic construction sites.

Development of interception capacity equations according to grate inlet types (빗물받이 형상에 따른 차집량 산정식 개발)

  • Choi, Sung Yeul;Eom, Kwangho;Choi, Seungyong;Cho, Jaewoong
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.10
    • /
    • pp.851-861
    • /
    • 2016
  • Recently, natural disasters, which are hard to predict and prevent, are rapidly increasing due to climate change worldwide. Particularly the damage scale of urban areas is increasing because of local torrential rainfall. In urban areas, the rain water cannot flow to pipes well due to the high percentage of impervious areas by the indiscriminate development. As a result, the inundation damage is getting higher in urban areas. So we need to characterize the interception of the grate inlets to ensure good drainage in impervious areas. But Korean installation criteria of grate inlets does not reflect road and drainage sector characteristics so the grate inlets do not function properly in many areas. In this study, we suggest the interception capacity equations about grate inlets through hydraulic experiments in various conditions. Therefore, the interception capacity changes are analyzed according to bearing bar slopes of grate inlets, grate inlet sizes and shapes and connecting pipe numbers. Though this, we developed the interception capacity equations about domestic grate inlets.

Current Status and Utilization Technology of End-of-Life Photovoltaic Modules (태양광 폐 모듈의 처리현황 및 실용화 기술)

  • Cho, Jai Young;Park, Areum;Yun, Hyun Mok;Jun, Yun-Su;Kim, Joon Soo
    • Resources Recycling
    • /
    • v.29 no.4
    • /
    • pp.15-30
    • /
    • 2020
  • Recently, it is increasing a amount of installed solar-cell rapidly, and end-of-life photovoltaic(ELP) modules are generated in according to the reduction of cell efficiency largely. Recycling of ELP modules are begun at an advanced nation already, but there are bring about environmental contamination and resource recovery problems owing to not treated ELP modules because of economic cost completely. First of all, there were researched basic study for treatment conditions of used solar cell inspection, dismantling of aluminum frame, crushing / grinding & separation of tempered glass, removal of back sheet & EVA film, leaching & precipitation recovery of valuable metals and treatment of waste water. Therefore, we establish optimum conditions through carried out of designed apparatus, installation of equipment, test operation & trouble shooting in scale of 1ton/day pilot plant test. Following to economic review, it does have the economic efficiency until to the case of tempered glass recovery, but does not have the economic value in case of total processes until to recover the valuable metals. However, there are guaranteed economic value if we are gained a large amount of the expenses through EPR supported system. It was confirmed the commercialized possibility of ELP modules recycling if there were established on the collecting ELP modules, reusing criteria, economical technology, enactment of directives and enforcement of EPR supported system efficiently.

A Study on the Evaluation Index of Crown Height given Marine Environmental Factors and Ship Characteristics (해상 환경 및 선박 특성을 반영한 마루높이 평가지표에 관한 연구)

  • Kim, Seungyeon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.4
    • /
    • pp.438-444
    • /
    • 2018
  • Korea has recently selected twenty-two ports for reinforcement breakwater installation of protection facilities, due to rise sea level caused by global warming and increase in the number of typhoon and tsunami. In addition, due to consistent enlargement of ship size, dredging for depth of water for large vessel's berthing and enlargement of berth is under construction. However, no definite construction plan for the reinforcement and lengthening of crown height, which has close relationship with the safe mooring of ships. In this study, domestic and foreign design criteria of crown height were analyzed, and the crown height evaluation index and evaluation method were developed by dividing it into environment and ship elements. In particular, in the case of ship evaluation index, each step was set up in 4 steps according to domestic and foreign regulations, weighted by each step, and the safety level of crown height was evaluated. As a result of the mooring safety simulation of the 100,000 ton cruise ship, the appropriate minimum crown height standard was derived to be 3 m above A.H.H.W. The results of this study are expected to be used as basic data to propose the crown height standard reflecting ship characteristics.

Calculation of Appropriate Number of Parking Lots for Cultural and Assembly Facilities - Focused on the Gwangju Metropolitan City Movie Theater - (문화 및 집회시설 적정 주차면 수 산정에 관한 연구 - 광주광역시 영화관을 중심으로 -)

  • Jin, Tae-Hee;Kwon, Sung-Dae;Jin, Il;Ha, Tae-Jun;Lee, Hyung-Mu;Lee, Gang-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.551-557
    • /
    • 2021
  • Attached parking lots installation criteria is determined by use, total floor area, etc. according to the Parking Lot Act and local government ordinances. However, with traffic demand increase inconvenience about use of culture and assembly facilities have been raised. When planning number of parking lots for cultural and assembly facilities, legal parking lots and unit parking lots are used, but this causes inconvenience and traffic problems on the surrounding roads, because reality and convenience are not considered. Therefore, this study intend to present an realistic number of parking lots calculating equation for movie theater in Gwangju Metropolitan City. After investigating number of parking lots, number of screens, number of seats, total floor area, bus route and illegal parking for a cultural facility in Gwangju Metropolitan City, prediction model for calculating number of parking lots was presented using SPSS regression analysis. As a result of comparing prediction model and unit method, the prediction model was be closer actual cumulative parking space, so prediction model verification was completed. Based on the model verified in this study, Realistic number of parking lots will be installed. However, due to limitations of research on specific areas, research on various facilities should continue in consideration of regional, population, and urban characteristics

Flexible Unit Floor Plan of Off-Site Construction Housing Considering Long-Lasting Housing Certification System (장수명주택 인증을 고려한 OSC공법 주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun;Roh, Jeong-Yeol;Kwon, Soo-Hye;Kim, Seung-Mo
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.103-117
    • /
    • 2021
  • With the current rapid changes in population and technology, the long-lastig housing certification system is a means of prolonging the physical and functional lifespan of a building. The certification requires differentiation between the structure and infill elements to allow for variability and ease of repairs. This works well with prefabricated houses so this study investigated the possibility of applying the long-lastig housing certification requirements to apartment construction using off-site construction (OSC) methods focused on the installation of bathrooms (plumbing and toilet) that differ from the traditional wet method. This study examined three different sized floor plans at 22 m2, 46 m2, and a combined one resulting in 69 m2. The larger 69 m2 plan utilized a removeable non-load bearing wall to increase flexibility in the layout of the floorplan. The apartments are constructed of steel reinforced concrete composite columns on a 9 m × 10.5 m grid with integrated slabs. The exterior and interior infill walls are all non-load bearing with some containing plumbing. This separation of the structure and infill walls can help meet some of the criteria in the long-lastig housing certification, particularly with the ease of repairs. Technologies that facilitate the replacement of infill elements that contain plumbing and other building services can benefit the nation by reducing carbon emissions and therefore tax incentives should be introduced to increase the adoption of the proposed construction methods.

Design of Submarine Cable for Capacity Extension of Power Line (전력선 용량증대를 위한 해저케이블 설계)

  • Son, Hong-Chul;Moon, Chae-Joo;Kim, Dong-Sub
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.1
    • /
    • pp.77-84
    • /
    • 2022
  • A submarine power cable is a transmission cable for carrying electric power below the surface of the water. Recently, submarine cables transfer power from offshore renewable energy schemes to shore, e.g. wind, wave and tidal systems, and these cables are either buried in the seabed or lie on the ocean floor, depending on their location. Since these power cables are used in the extreme environments, they are made to withstand in harsh conditions and temperatures, and strong currents. However, undersea conditions are severe enough to cause all sorts of damage to offshore cables, these conditions result in cable faults that disrupt power transmission. In this paper, we explore the design criteria for such cables and the procedures and challenges of installation, and cable transfer splicing system. The specification of submarine cable designed with 3 circuits of 154kV which is composed of the existing single circuit and new double circuits, and power capacity of 100MVA per cable line. The determination of new submarine cable burial depth and cable arrangement method with both existing and new cables are studied. We have calculated the permission values of cable power capacity for underground route, the values show the over 100MW per cable line.

A Study on Evaluation of Water Quality Measurement Network in the Nakdong River Tributary Using TOPSIS (TOPTSIS를 이용한 낙동강 지류에서의 수질측정망 평가 연구)

  • Kal, Byungseok;Park, Jaebeom;Kim, Seongmin;Shim, Kyuhyun;Shin, Sangmin;Choi, Suyeon
    • Journal of Wetlands Research
    • /
    • v.24 no.1
    • /
    • pp.44-51
    • /
    • 2022
  • In this study, TOPSIS(Techniques for Order Performance by Similarity to Ieal Solution) was used to evaluate the installation points of water quality monitoring networks in 34 streams of the Nakdong River watershed. The Nakdong River System has been measuring water quality and flow in 195 local streams since 2011. In particular, the 34 key management points are areas with many pollutants and poor water quality, requiring continuous water quality management. For the selection of points requiring management, 10 indicators were selected for evaluation, and the selected indicators were standardized and weighted using the entropy method. As a result of weight calculation, the presence or absence of a nearby measuring network received the greatest weight, and the average water quality and presence of an industrial complex obtained the highest weight. The evaluated data are judged to be the research results necessary for the establishment of a new water quality measurement network in the Nakdong River system and continuous water quality management in tributaries.

Instrumentation Management of Differential Settlement of the Deep Soft Ground with Dredged Clay Reclaimed in the Upper (대심도 준설 매립지반에서의 층별침하 계측관리에 관한 사례 연구)

  • Tae-Hyung Kim;Seung-Chan Kang;Ji-Gun Chang;Soung-Hun Heo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.87-96
    • /
    • 2023
  • There are a lot of difference between the surface settlement and the differential settlement measured at the Busan New Port, where the dredged and reclaimed clay layer exists and below the clay is originally thickly distributed. To find the cause and solution of this, the actual conditions of each differential settlement used for the soft ground improvement, characteristics, installation method, measurement frequency, measurement data management, and data analysis of each type were considered. In the deep soft ground improvement work where large deformation occurs, the bending deformation of the screw-type differential settlement gauge is less than that of other types of measuring instruments, so there is less risk of loss, and the reliability of data is relatively high as the instruments are installed by drilling for each stratum. Since the greater the amount of high-precision settlement measurement data, the higher the settlement analysis precision. It is necessary to manage with higher criteria than the measurement frequency suggested in the standard specification. For the data management of the differential settlement gauge, it is desirable to create graphs of the settlement and embankment height of the relevant section over time, such as surface, differential, and settlement of pore water pressure gauge for each point. In the case of multi-layered ground with different compression characteristics, it is more appropriate to perform settlement analysis by calculating the consolidation characteristics of each stratum using a differential settlement data.

A Study on the Safety Assessment Technique of a Tunnel Using Critical Stain Concept (한계변형률 개념을 활용한 터널 안정성 평가에 관한 연구)

  • Park, Si-Hyun;Shin, Yong-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.5
    • /
    • pp.29-41
    • /
    • 2007
  • An assesment technique for the quantitative evaluation of tunnel safety during tunnel excavation was newly proposed in this study using displacement measurements. First of all, field measurement guidelines used at tunnel construction sites in Korea and other countries were investigated. It was found out that the criteria of the guidelines were not clear and varied depending on the construction sites. The practical use of field measurement data for the evaluation of tunnel safety was very limited due to uncertainties of the guidelines related to the interpretation of measured data during the excavation. Critical strain concept is introduced in this study for the assesment of tunnel safety during the tunnel excavation. Moreover, the characteristics of tunnel displacements caused by the tunnel excavation were investigated in detail in order to investigate the practical application of the critical strain concept. The total tunnel displacements can be subdivided into three parts: displacements occurring ahead of tunnel face, displacements occurring prior to measurements, and displacements occurring after the installation of instruments. The characteristic of each portion of displacements is analysed in this study. Finally, a general method on the use of the displacement measurement data for the critical strain concept was suggested in the concrete manner, considering the field measurement practice in Korea.