• Title/Summary/Keyword: Inspection Period

Search Result 432, Processing Time 0.032 seconds

Single Intravenous-dose Toxicity of Water-soluble Carthami-flos Pharmacopuncture (WCF) in Rats

  • Jung, Da-Jung;Choi, Yoo-Min;Kim, Seok-Hee;Kim, Jong-Uk;Yook, Tae-Han
    • Journal of Pharmacopuncture
    • /
    • v.17 no.3
    • /
    • pp.31-39
    • /
    • 2014
  • Objectives: This study was performed to analyze the toxicity and to find the lethal dose of the test substance Water-soluble Carthami-flos pharmacopuncture (WCF) when used as a single intravenous-dose in 6-week-old, male and female Sprague-Dawley rats. Methods: The experiment was conducted at Biotoxtech according to Good Laboratory Practices. 20 female and 20 male Spague-Dawley rats were divided into 4 groups of 5 female and 5 male animals per group. The rats in the three experimental groups received single intravenous injections with 0.125-mL, 0.25-mL and 0.5-mL/animal doses of WCF, Groups 2, 3, and 4, respectively, and the control group, Group 1, received a single intravenous injection with a 0.5-mL dose of normal saline. Clinical signs were observed and body weight measurements were carried out for 14 days following the injections. At the end of the observation period, hematology, clinical chemistry, histopathological tests and necropsy were performed on the injected parts. Results: No deaths occurred in any of the groups. Also, no significant changes in body weight, hematological parameters or clinical chemistry test results between the control group and the experimental groups were observed. Visual inspection after necropsy showed no abnormalities. Histopathological tests on the injected parts showed no significant differences, except for Group 1 females; however, the result was spontaneous generation and had no toxicological meaning because it was not dose-dependent. Therefore, this study showed that WCF had no effect on the injected parts in terms of clinical signs, body weight, hematology, clinical chemistry, and necropsy. Conclusion: As a result of single intravenous-dose tests of the test substance WCF in 4 groups of rats, the lethal dose for both males and females exceeded 0.5 mL/animal. Therefore, WCF is a relatively safe pharmacopuncture that can be used for treatment, but further studies should be performed.

Effect of Saline Concentrations on Biological Nitrification in Batch Reactor

  • Lee, Young Joon;Nguyen, Viet Hoang;Nguyen, Hong Khanh;Pham, Tuan Linh;Kim, Gi Youn
    • Journal of Integrative Natural Science
    • /
    • v.4 no.2
    • /
    • pp.103-112
    • /
    • 2011
  • This study was carried out on 4 batch reactors to determine the specific ammonium oxidizing rate (SAOR), specific nitrate forming rate (SNFR) and inhibitory degree of nitrifying activities with saline concentrations. Under salt free condition ammonia was consumed during the reaction period within 200 min. When the salt level increased to 10, 20 and 30 g $NaClL^{-1}$ in reactor, ammonia depletion took 250, 300 and above 350 min, respectively. During concentration above 10 g $NaClL^{-1}$, there was nitrite accumulation. Also, at 30 g $NaClL^{-1}$ ammonia did not depleted and $NO_2{^-}$-N accumulated until the final reaction. Nitrate formation rates decreased with increasing salt concentration. SAOR and SNFR showed a decreasing trend as salinity concentrations were increased. The SAOR was reduced from 0.2 to 0.08 mg $NH_4{^+}$-N $g^{-1}VSS\;day^{-1}$ as the salt concentration increased from 0 to 30 g $NaClL^{-1}$. Similarly, the SNFR decreased from 0.26 kg $NO_3{^-}$-N $kg^{-1}VSS\;day^{-1}$ at saline free to 0.1 kg $NO_3{^-}$-N $kg^{-1}VSS\;day^{-1}$ at saline 30 g L-1. A severe inhibition of nitrifiers activity was observed at increased salt concentrations. The inhibition ratio of specific ammonium oxidation rates were 17, 47 and 60% on the reactor of 10, 20 and 30 g $NaClL^{-1}$ added, respectively. The inhibition ratio of specific nitrate forming rates also were inhibited 30, 53 and 62% on the reactor of 10, 20 and 30 g $NaClL^{-1}$ added, respectively. As the salinity concentrations increased from 0 to 30 mg $NaClL^{-1}$, the average MLSS concentration increased from 1,245 to 1,735 $mgL^{-1}$. The SS concentration of supernatant in reactor which settled about 30 minutes was not severely difference between concentration of salt free reactor and one of those high salt contained reactors.

Localized reliability analysis on a large-span rigid frame bridge based on monitored strains from the long-term SHM system

  • Liu, Zejia;Li, Yinghua;Tang, Liqun;Liu, Yiping;Jiang, Zhenyu;Fang, Daining
    • Smart Structures and Systems
    • /
    • v.14 no.2
    • /
    • pp.209-224
    • /
    • 2014
  • With more and more built long-term structural health monitoring (SHM) systems, it has been considered to apply monitored data to learn the reliability of bridges. In this paper, based on a long-term SHM system, especially in which the sensors were embedded from the beginning of the construction of the bridge, a method to calculate the localized reliability around an embedded sensor is recommended and implemented. In the reliability analysis, the probability distribution of loading can be the statistics of stress transferred from the monitored strain which covered the effects of both the live and dead loads directly, and it means that the mean value and deviation of loads are fully derived from the monitored data. The probability distribution of resistance may be the statistics of strength of the material of the bridge accordingly. With five years' monitored strains, the localized reliabilities around the monitoring sensors of a bridge were computed by the method. Further, the monitored stresses are classified into two time segments in one year period to count the loading probability distribution according to the local climate conditions, which helps us to learn the reliability in different time segments and their evolvement trends. The results show that reliabilities and their evolvement trends in different parts of the bridge are different though they are all reliable yet. The method recommended in this paper is feasible to learn the localized reliabilities revealed from monitored data of a long-term SHM system of bridges, which would help bridge engineers and managers to decide a bridge inspection or maintenance strategy.

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

The Relationship between the Personality of Elementary School Students and the Safety Accidents in the School (초등학생의 성격특성과 학교안전사고)

  • Kim, Chang-Hee;Park, Young-Soo
    • The Journal of Korean Society for School & Community Health Education
    • /
    • v.4
    • /
    • pp.1-20
    • /
    • 2003
  • This study was not intended to analyze out the realities of the safety accidents in school. The purpose of this study was to find out the personality of elementary school students in 6th grade and analyze the relationship between the personality of elementary school students and the safety accidents in the school. We made a visit 12 elementary school personally in the B city of Gyeonggi Province and gave out 552 questionaries in order to accomplish the purpose of this study. And we analyzed the 501 answer data except the unfittable data 51 sheets-in case of no answer or untruthfulness. The inspection of the personality used the Eysenck Personality Questionnaire(EPQ) and the questionnaires of the safety accidents in the school were reorganized of the questionnaires which were used in Chun-Ok, Joen(1997) and One-Yong, Kim(1999)'s study to correspond with our purpose of study. Answer sheets were gone through the t and x2 test by using the program of SPPS. First, elementary school students are in the formative period in the life of a man. So many students's personality was in the middle group rather than in high and low group. In regard of the distintion between the boy students and the girl students, the boy students had higher score in Psychoticism(P) but the girl students had higher score in Neutroticism(N). And Lie(L) was showing a little more score in the girl students. Second, there was significant difference in the investigation of safety accidents in school according to sex distinction. 1) Comparing the boy students and the girl students, the rate of accidents was higher in boy rather than girl. And there was significant difference. 2) Comparing the grade of the school, the rate of accidents was higher in upper grade than lower grade both girls and boys. 3) In the kind of accidents, the traumatic Injuries were very popular and the next were contusions. There was significant difference in the traumatic injury and nosebleed. 4) The results of injured parts showed that the injuries of foot, leg, hand, arm hold a large majority. And there was a significant difference in head, face, foot, leg and etc. 5) Most accidents broke out during the break time and then accidents happened after school were the next. The flowings were lunch time and class time. There was a significant difference in accidents happened during the class, break time and lunch time. 6) Comparing the subjects, the most accidents broke out in the class of physics. 7) Among the cause of accidents, one's own carelessness was showing the highest rate. There was a significant distintion in the fight and game. 8) The safety accidents took place most in playground, and there was a significant difference. 9) Being slight wound was showing almost in the degrees of damage. And there was a significant difference. Third, the boy students were not showing the significant difference in relation to the personality, the frequency of accidents and the degrees of damage. But the girl students were showing the significant difference in relation to the Extraversion-Introversion(E) and the frequency of accidents. And there were a significant difference between E and N. Also they were showing the intense damages.

  • PDF

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

Hwarang's journey and Hyangga (화랑의 순유(巡遊)와 향가)

  • Shin, Jae-hong
    • Journal of Korean Classical Literature and Education
    • /
    • no.15
    • /
    • pp.67-88
    • /
    • 2008
  • In spite of a few numbers of Hyangga that is handed down today, Hyangga has diverse and abundant contents. So it is possible to survey Hyangga as a journey literature of the middle age. On this purpose we can inquire into the Hwarangs' group journey, because the Hwarang was one of the main enjoying group of Hyangga. Hwarangs' group journey shows many aspects. They made a journey for the public purpose like a tour of inspection of people's daily life and the fortresses of the country's peripheral areas. Also, they made a journey for personal purposes like enjoying the attractive view of the mountains and rivers or seeking pretty girls outside of the palace. On these journeys, Hwarang made and enjoyed Hyanggas. Among Hyanggas that remains today, Hyeseongga and Cheoyongga have a direct relation to Hwarang's journey. Hyeseongga was made to eliminate the calamities that occurred at the time of the start of a journey. It is expressed in this poem that Hwarang could take a peaceful trip with the condition that the celestial objects shed light on the earth path. As such, the trip becomes a sacred ceremony. Cheoyongga reflects the fact that the foreigner Cheoyong became Hwarang and toured the streets of Seorabeol, the capital of Shilla. The Cheoyong's bitterness of broken love is expressed in this poem. SongSadahamga and MoJukjirangga come under a broad category of Hwarang's journey literature. SongSadahamga is a farewell poem for Hwarang who leaves to fight on the battlefield. It was universal to make a journey for the fighting of a battle in Shilla period, so many Hyanggas would be made under those situations. MoJukjirangga has the content of Hwarang's trip for saving his follower who was taken by another senior. It expresses the intimate relationship between Hwarang and the follower. Though the words of the song have not been remained, Hyeongeumpogok, Daedogok, and Mungungok were created on the way of Hwarang's journey. These seem to be a series poems which have the proper characteristic features of the Hwarang's journey literature. In these poems, the king's open mind and liberal political views are reflected. In short, Hwarang created and enjoyed Hyanggas on the way of their journey, so Hyangga has the features of journey literature in Korean middle ages.

A Study on Development of Portable Concrete Crack Measurement Device Using Image Processing Technique and Laser Sensors (이미지 처리기법 및 레이저 센서를 이용한 휴대용 콘크리트 균열 측정 장치 개발에 관한 연구)

  • Seo, Seunghwan;Ohn, Syng-Yup;Kim, Dong-Hyun;Kwak, Kiseok;Chung, Moonkyung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.4
    • /
    • pp.41-50
    • /
    • 2020
  • Since cracks in concrete structures expedite corrosion of reinforced concrete over a long period of time, regular on-site inspections are essential to ensure structural usability and prevent degradation. Most of the safety inspections of facilities rely on visual inspection with naked eye, so cost and time consuming are severe, and the reliability of results differs depending on the inspector. In this study, a portable measuring device that can be used for safety diagnosis and maintenance was developed as a device that measures the width and length of concrete cracks through image analysis of cracks photographed with a camera. This device captures the cracks found within a close distance (3 m), and accurately calculates the unit pixel size by laser distance measurement, and automatically calculates the crack length and width with the image processing algorithm developed in this study. In measurement results using the crack image applied to the experiment, the measurement of the length of a 0.3 mm crack within a distance of 3 m was possible with a range of about 10% error. The crack width showed a tendency to be overestimated by detecting surrounding pixels due to vibration and blurring effect during the binarization process, but it could be effectively corrected by applying the crack width reduction function.

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.

Study of the Production Techniques Used in Choi Man Lin's and Its Conservation Treatment (근현대 조각품 최만린 작(作) <이브 58-1>의 제작기법 및 보존처리 연구)

  • Shin, Jeongah;Jung, Chamhee;Yoo, Seonyoung;Kwon, Heehong
    • Conservation Science in Museum
    • /
    • v.27
    • /
    • pp.23-38
    • /
    • 2022
  • The standing plaster figure entitled is an early work from Choi Man Lin's 'Eve' series. It reflects the aesthetics of abstract sculpture in the period following Korea's liberation from Japanese colonial rule. Modern and contemporary sculptures can be made from a wide variety of materials, so the particular selection of materials and expressive techniques are indicative of both the artist's intentions and the zeitgeist of the moment. In this regard, the materials and production techniques used in provide important basic data for the chronological study of Choi's artistic development. In this study, scientific analysis was conducted to reveal the production techniques used in the work. The scope of appropriate conservation treatment was decided through consultation between several people with decision-making authority. First, the internal structure was inspected using X-CT scanning, and a material analysis was conducted to identify the formal characteristics, materials, and production techniques found in the work. As the analyses revealed the work to be in a relatively stable state, only minimal conservation treatment was applied based on the opinions expressed by the institution housing the work, by a former assistant of the artist, and in an interview granted by the artist during his lifetime.