The transformer used in an inverter type arc welding machine is designed to use high frequency in order to reduce its size and cost. Also, selecting core materials that fit frequency is important because core loss increases in a high frequency band. An inrush current can occur in the primary coil of transformer during arc welding and this inrush current can cause IGBT, the switching element, to burn out. The transformer design was carried out in $A_P$ method and amorphous core was used to reduce the size of transformer. In addition, sheet coil was used for primary winding and secondary winding coil considering the skin effect. This paper designed the transformer core with an air gap to prevent IGBT burnout due to the inrush current during welding and proposed the optimum air gap length.
The inrush current of transformer cause saturation effects of recovery voltage for short-circuit power testing. the inrush current depends on the residual flux of the transformer core. when inrush current occurs, it is contains a d.c. component and the high harmonic content of the current are of importance to relay protection of testing circuit. this paper describes of decrease method of inrush current for high power short-circuit testing transformer.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.8
/
pp.1202-1206
/
2015
The induction generator has many advantages compared to the synchronous generator in terms of cost and maintenance. So squirrel cage induction generator has been recently supplied in small hydroelectric power station. Squirrel cage induction generator generates a high inrush current at the grid-connection. This high inrush current causes a voltage drop on the grid. In order to increase the supply of the induction generator, it is very important to find the method of reducing inrush current and voltage drop.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.10
/
pp.719-724
/
2016
This paper describes the performance improvement of an inrush current limiter to prevent damage or malfunctions in power converters due to the inrush current. When the power converter of military radar is operated, the circuit breaker of the power converter is often activated because the overcurrent flows through the circuit breaker of the power converter. Therefore, this study performed a cause analysis of the problem, which is a larger current flow than the intended current(250A). The operation principle of an inrush current limiter and SCR (Silicon Controlled Rectifier) used in the inrush current limiter was analyzed. As a result, the overcurrent flow through the circuit breaker was found to be due to dv/dt triggering of SCR. Based on cause analysis, this paper proposes a technique by adding the resistor in front of the SCR to prevent an unnecessary inrush current. Finally, the effectiveness of the improvement was verified by measuring the output current in the inrush current limiter. The power converter equipped with the improved inrush current limiter operated for more than 1 year without the circuit breaker of the power converter being activated.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.12
/
pp.2125-2130
/
2010
The neutral section on electric railway system is significant sector in order to prevent short circuit of two electric powers. However, while electric trains pass the neutral section, those speed is decreased and the accident of AC electric traction system and the electric train would be occurred. So the countermeasures are urgently needed. The automatic power switching technology system that is current being research and development is system to improve these problems. Because main object of this system is power change using static switch in the neutral section, it's expected to cause a variety of transients. Especially, onboard transformer inrush current for electric railway train can be occurred more than rated current according to switching time. Therefore, the analysis and improvement are needed to ensure the stability of this system. In this paper, we analyze the operating characteristics of the automatic power switching technology system. Especially, it reviews inrush current according to the closing phase angle. And we propose control plan of inrush current considering the case that voltage is maintained due to counter electromotive force and regenerative braking operation of electric railway train. Finally, the proposed control scheme was reviewed using the transient analysis program.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.3
/
pp.55-64
/
2013
In this paper, a new topology which can add a small reactor in series to a condenser-bank type reactive power compensator to limit current is proposed. And also the proposed topology can add or remove a power condenser safely without any addition of inrush-current suppression resistance. The proposed method tests variable resistance of the drain source of a switching device which is controlled by gate voltage in a two-way switch with a diode rectifier and FET switch. In other words, the proposed method is a inrush-current suppression method with the structure of variable resistance. In particular, the proposed method creates smooth current without any resonance in inrush-current as well as is not limited by the time of switch on and off.
Many sensitive loads always rely on UPS systems to maintain continuous power during abnormal utility power conditions. As any disturbance occurs at the utility side, an off-line UPS system takes over the load within a quarter cycle to avoid a blackout. However, the starting of the inverter can root the momentous inrush current for the transformer installed before the load, due to its magnetic saturation. The consequences of this current can be a reduction of line voltage and tripping of protective devices of the UPS system. Furthermore, it can also damage the transformer and decrease its lifetime by increasing the mechanical stresses on its windings. To prevent the inrush current, and to avoid its disruptive effects, this paper proposes an off-line UPS system that eliminates the inrush current phenomenon while powering the transformer coupled loads, using a current regulated voltage source inverter (CRVSI) instead of a typical voltage source inverter (VSI). Simulations have been performed to validate the operation of proposed off-line UPS system.
Normally, various auxiliary loads are installed along with the main load in industrial applications. Usually, load transformers are used to convey such types of auxiliary loads. The transformers become energized when the loads are turned-on, consequently, high amplitude of inrush current appears at the output of the uninterrupted power supply (UPS) system. To mitigate these high current amplitudes, this manuscript suggests a three-phase line-interactive UPS system to counter the inrush current during the turning-on of the auxiliary load transformer while powering the main load by using a current controlled inverter. Experimental results of a laboratory-sized prototype are provided in the support of the proposed UPS system for validation.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.2
/
pp.134-141
/
2003
The power transformer is one of the very important electric facilities in power systems. Recently, current differential relay is widely used to protect such power transformer But if inrush occurs in transformer, relay can be tripped by judging like internal fault. Therefore the correct discrimination between internal winding fault, inrush and overexcitation should be performed. This paper presents a new protective relaying algorithm which discriminates inrush, internal faults and overexcitation of transformer modelled using BCTRAN and HYSDAT of EMTP. Discrimination between internal winding fault and inrush is revealed in simulation within 1/2 cycle after fault. Accordingly, it is evaluated that the proposed algorithm has better discrimination characteristics in various cases thin the current relaying for protection of transformer.
This paper analyzes the improvement of the power quality by the reduction of the inrush current. We analyze the existing methods and simulate the segragated point-on-wave closing method selected as the proper method. And we attempts to use the resistive type Superconducting Fault Current Limiter(SFCL) to reduce the transformer inrush current. We simulate the various insertion resistances and analyze the voltage drop. All simulation are performed by EMTP. The simulation results show the validity and effectiveness of a SFCL application and the segragated point-on-wave closing method to reduce the inrush current and improve the power quality.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.