• Title/Summary/Keyword: Input information

Search Result 10,129, Processing Time 0.033 seconds

Experimental Realization of Matrix Converter Based Induction Motor Drive under Various Abnormal Voltage Conditions

  • Kumar, Vinod;Bansal, Ramesh Chand;Joshi, Raghuveer Raj
    • International Journal of Control, Automation, and Systems
    • /
    • v.6 no.5
    • /
    • pp.670-676
    • /
    • 2008
  • While the matrix converter has many advantages that include bi-directional power flow, a size reduction, a long lifetime, and sinusoidal input currents, it is vulnerable to the input voltage disturbances, because it directly exchanges the input voltage to the output voltage. So, in this paper, a critical evaluation of the effect of various abnormal voltage conditions like unbalanced power supply, balanced non-sinusoidal power supply, input voltage sags and short time blackout of power supply on matrix converter fed induction motor drives is presented. The operation under various abnormal conditions has been analyzed. For this, a 230V, 250VA three phase to three phase matrix converter (MC) fed induction motor drive prototype is implemented using DSP based controller and tests have been carried out to evaluate and improve the stability of system under typical abnormal conditions. Digital storage oscilloscope & power quality analyzer are used for experimental observations.

Identification of Soil Stiffness Using Forced Vibration Test Data (강제진동시험자료를 사용한 지반의 강성계수 추정)

  • 최준성;이종세;김동수;이진선
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2002.03a
    • /
    • pp.101-108
    • /
    • 2002
  • This paper presents an input and system identification technique for a free-field system using forced vibration data. Identification is carried out on geotechnical experiment site at Yong-jong Island where Inchon International Airport being constructed. The identified quantities are the input load as well as the shear moduli of the free-field soil regions. The dynamic response analysis on the free-field system is carried out using the finite element method incorporating the infinite element formulation fur the unbounded layered soil medium. The criterion function for the parameter estimation is constructed using the frequency response amplitude ratios of the dynamic responses measured at several points of the free-field, so that the information on the input loading may be excluded. The constrained steepest descent method is employed to obtain the revised parameters. The simulated dynamic responses using the identified parameters and input load show excellent agreements with the measured responses.

  • PDF

Image illumination Estimation Using Surface Reflectance (물체 표면 반사를 이용한 영상의 광원 추정)

  • 장현희;안강식;안명석;조석제
    • Proceedings of the IEEK Conference
    • /
    • 2000.11d
    • /
    • pp.9-12
    • /
    • 2000
  • This paper proposes an improved image illumination estimation method based on the conventional color constancy algorithm. The most important process of color constancy algorithm is the estimation of the spectral distributions of illuminant of an input image. To estimate of the spectral distributions of illuminant of an input image, we use the brightest pixel values and the values of surface reflectance of an input image using a principal component analysis of the given munsell chips. We estimate a CIE tristimulus values of an input image using the estimated .spectral distribution of illuminant and recover an image by scaling it regularity. From the experimental results, the proposed method was effective in estimating the image illumination

  • PDF

A Simple Technique on Estimating Delay Time Considering Crosstalk Noise in RC-class Interconnects Under Saturated Ramp Input (램프 입력에 대한 RC-class 연결선의 누화잡음을 고려한 지연시간 예측 기법)

  • Oh Kyoung-Mi;Kim Ki-Young;Kim Seok-Yoon
    • Proceedings of the IEEK Conference
    • /
    • 2004.06b
    • /
    • pp.573-576
    • /
    • 2004
  • This paper proposes an analytic method that can estimate delay time considering crosstalk noise at an arbitrary node of RC-class interconnects under saturated ramp input using a simple closed-form expression. In the case of single interconnects, algebraic expression presented in existent research can estimate delay time under ramp input using delay time under step input, and we applied it to estimate delay time considering crosstalk noise. As the result, we can provide a intuitive analysis about signal integrity of circuits that include crosstalk noise reducing computational complexity significantly.

  • PDF

Low Leakage Input Vector Searching Techniques for Sequential Circuits (시퀀셜 회로를 위한 리키지 최소화 입력 검색방법)

  • Lee, Sung-Chul;Shin, Hyun-Chul;Kim, Kyung-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2005.11a
    • /
    • pp.655-658
    • /
    • 2005
  • Due to reduced device sizes and threshold voltages, leakage current becomes an important issue in CMOS design. In a CMOS combinational logic circuit, the leakage current in the standby state depends on the state of the inputs and thus can be minimized by applying an optimal input when the circuit is idling. In this paper, we present a New Input Vector Control algorithm, called Leakage Minimization by Input vector Control (LMIC) for minimal leakage power. This algorithm finds the minimal leakage vector and reduces leakage current up to 22.% on the average, for TSMC 0.18um process parameters. Minimal leakage vectors are very useful in reducing leakage currents in standby mode of operation.

  • PDF

Grant-Aware Scheduling Algorithm for VOQ-Based Input-Buffered Packet Switches

  • Han, Kyeong-Eun;Song, Jongtae;Kim, Dae-Ub;Youn, JiWook;Park, Chansung;Kim, Kwangjoon
    • ETRI Journal
    • /
    • v.40 no.3
    • /
    • pp.337-346
    • /
    • 2018
  • In this paper, we propose a grant-aware (GA) scheduling algorithm that can provide higher throughput and lower latency than a conventional dual round-robin matching (DRRM) method. In our proposed GA algorithm, when an output receives requests from different inputs, the output not only sends a grant to the selected input, but also sends a grant indicator to all the other inputs to share the grant information. This allows the inputs to skip the granted outputs in their input arbiters in the next iteration. Simulation results using OPNET show that the proposed algorithm provides a maximum 3% higher throughput with approximately 31% less queuing delay than DRRM.

Automatic Generation of Finite Element Meshes on Midsurfaces in Shell Structures (셀 구조물에서 중립면에 대한 유한요소망의 자동생성)

  • Son Jun-Hee;Chae Soo-Won
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.10
    • /
    • pp.1517-1525
    • /
    • 2004
  • Shell finite elements are widely used for the analysis of thin section objects such as sheet metal parts, automobile bodies and et al. due to their computational efficiency. Since many of input data for finite element analysis are given as solid models or triangulated surface models, one should extract midsurface information from these input data initially and then construct shell meshes on the extracted midsurfaces. In this paper, a method of generating shell elements on midsurfaces directly from input models has been proposed, in which midsurface generating process can be omitted. In order to construct shell meshes, the input models should be triangulated on surfaces first, and then tetrahedral elements are generated by using an advancing front method, and finally mid shell surfaces are obtained from tetrahedral meshes. Some examples are given to demonstrate the efficiency of the proposed method.

CONVERGENCE ACCELERATION OF LMS ALGORITHM USING SUCCESSIVE DATA ORTHOGONALIZATION

  • Shin, Hyun-Chool;Song, Woo-Jin
    • Proceedings of the IEEK Conference
    • /
    • 2001.09a
    • /
    • pp.73-76
    • /
    • 2001
  • It is well-known that the convergence rate gets worse when an input signal to an adaptive filter is correlated. In this paper we propose a new adaptive filtering algorithm that makes the convergence rate highly improved even for highly correlated input signals. By introducing an orthogonal constraint between successive input signal vectors, we overcome the slow convergence problem caused by the correlated input signal. Simulation results show that the proposed algorithm yields highly improved convergence speed and excellent tracking capability under both time-invariant and time varying environments, while keeping both computation and implementation simple.

  • PDF

Korean Semantic Role Labeling using Input-feeding RNN Search Model with CopyNet (Input-feeding RNN Search 모델과 CopyNet을 이용한 한국어 의미역 결정)

  • Bae, Jangseong;Lee, Changki
    • 한국어정보학회:학술대회논문집
    • /
    • 2016.10a
    • /
    • pp.300-304
    • /
    • 2016
  • 본 논문에서는 한국어 의미역 결정을 순차열 분류 문제(Sequence Labeling Problem)가 아닌 순차열 변환 문제(Sequence-to-Sequence Learning)로 접근하였고, 구문 분석 단계와 자질 설계가 필요 없는 End-to-end 방식으로 연구를 진행하였다. 음절 단위의 RNN Search 모델을 사용하여 음절 단위로 입력된 문장을 의미역이 달린 어절들로 변환하였다. 또한 순차열 변환 문제의 성능을 높이기 위해 연구된 인풋-피딩(Input-feeding) 기술과 카피넷(CopyNet) 기술을 한국어 의미역 결정에 적용하였다. 실험 결과, Korean PropBank 데이터에서 79.42%의 레이블 단위 f1-score, 71.58%의 어절 단위 f1-score를 보였다.

  • PDF

A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management (프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례)

  • Jung, Ha-Sung;Lee, Dong-Wha;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.