• 제목/요약/키워드: Initial Transient Making Current(ITMC)

검색결과 1건 처리시간 0.017초

차단기의 투입성능 평가를 위한 최적 합성투입시험설비 (Optimized Synthetic Making Test Facilities for Estimating the Making Performance of Circuit Breaker)

  • 서윤택;김맹현;송원표;고희석;박승재
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권6호
    • /
    • pp.284-292
    • /
    • 2005
  • Because all of the short-circuit testing laboratories have the limitation of test facilities, the synthetic making test methods have been used to estimate the short-circuit making performance of the ultra high-voltage circuit breaker as the alternative to direct test methods. So, KERI(Korea Eelctrotechnology Research institute) has completed the construction of the synthetic making test facilities using the low capacity step-up transformer method which fulfill the requirements specified in newly revised IEC 62271-100 Edition 1.1(2003) and have the testing capability up to 550kV, 63kA full-pole circuit breaker. The test facilities using the low capacity step-up transformer method presented in this paper are made up of the unit equipments such as HCS(High-speed Closing Switch), ITMC(Initial Transient Making Current) circuit and UP TR(low capacity step-up transformer) and have the operating range of 17.6$^{\circ}$ $\~$ 145.1$^{\circ}$ for testing the circuit breaker rated on up to 50kA and 43.1$^{\circ}$ $\~$ 119.6$^{\circ}$ for more than 50kA.