• 제목/요약/키워드: Initial Cost Saving

검색결과 73건 처리시간 0.023초

Structural Design and Analysis for 3D Ultrasonic Anemometer

  • Kim, Kyung-Won;Choi, Jae-Yeong;Lee, Woo-Jin;Lee, Seon-Gil
    • 센서학회지
    • /
    • 제25권2호
    • /
    • pp.86-90
    • /
    • 2016
  • A 3D ultrasonic anemometer measures the direction and velocity of wind in a 3D space. The 2D ultrasonic anemometers developed by different manufacturers do not differ significantly in terms of their form or structure. The 3D ultrasonic anemometers, on the other hand, have more diverse forms than their 2D counterparts depending on the measurement algorithms and methods. Designing and reviewing the structure at the initial stage and defining its performance objectives are time-consuming processes. The process can be made cost-effective and time-saving if the validity is tested by model design and structural interpretation, and the structure is designed to withstand high wind velocities. This study presents the results of a 3D ultrasonic anemometer on real sample data by using a 3D modeling program, CATIA, for ultrasonic anemometer modeling.

경제성 평가를 통한 태양광발전시스템 연계형 에너지저장장치 용량 선정에 관한 연구 (A Study on the Energy Saving Capacity of Solar Power Generation System using Economic Evaluation)

  • 이여진;김성열;한세경
    • 전기학회논문지P
    • /
    • 제67권1호
    • /
    • pp.21-26
    • /
    • 2018
  • Due to the international environmental regulations and changes in policies, the demand for generators using the renewable energy is increasing. However, renewable energy generators with intermittent output characteristics such as solar and wind power generators, need the buffer facilities such as ESS during system operations. However, because of low price competitiveness in energy storage system, it is difficult to operate the renewable energy generator with ESS. Therefore, the government has recently proposed a policy to compensate the REC for renewable energy system with ESS. For all this, since the initial cost of the ESS is high, it is the most important to calculate and operate the optimal capacity of the ESS through an economic analysis. In this paper, we proposed the method of calculation the optimal capacity of ESS and analyzed economic feasibility of renewable energy system using the ESS according to depreciation in ESS price.

입구공기 안개법에 의한 공기압축기의 증발냉각도와 출력이득에 관한 연구 (ANALYTICAL STUDY ON EVAPORATIVE COOLING POTENTIAL AND POWER GAINS OF AIR COMPRESSORS BY INLET FOGGING)

  • ;김동선;이해동;권준경;김희동
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2008년도 추계학술대회B
    • /
    • pp.2637-2641
    • /
    • 2008
  • The ever increasing demand for power and the shortages encountered during summer calls for the implementation of strategies for power saving in industry. Inlet fogging of gas turbine engines is quite popular due to the ease of installation and the relatively low initial cost compared to other inlet cooling methods. In the present investigation, a detailed analysis is carried out on the basis of coincident wet bulb and dry bulb temperature data of a compressed air plant from April to October, 2007 to determine the evaporative cooling potential for the period. The power gain that can be obtained by employing inlet fogging of the air compressors is analyzed based on the real climatic data at several sites in Korea. An experimental set-up was constructed and tests were carried out with the standard impaction pin nozzle. The experimental results were found to match with the theoretical calculations.

  • PDF

현장타설형 건물 기초를 이용한 지중열 공조시스템의 성능평가에 관한 연구 (A Study on Development of a Ground-Source Heat Pump System Utilizing Cast-in-place Concrete Pile Foundation of a Building)

  • 황석호;남유진
    • 설비공학논문집
    • /
    • 제22권9호
    • /
    • pp.641-647
    • /
    • 2010
  • Ground-source(Geothermal) heat pump(GSHP) systems can achieve a higher coefficient of performance than conventional air-source heat pump(ASHP) systems. However, GSHP systems are not widespread because of their expensive installation costs. The authors have developed a GSHP system that employs the cast-in-place concrete pile foundations of a building as heat exchangers in order to reduce the initial cost. In this system, eight U-tubes are arranged around the surface of a cast-in-place concrete pile foundation. The heat exchange capability of this system, subterranean temperature changes and heat pump performance were investigated in a full-scale experiment. As a result, the average values for heat rejection were 186~201 W/m(per pile, 25 W/m per pair of tubes) while cooling. The average COP of this system was 4.6 while cooling; rendering this system more effective in energy saving terms than the typical ASHP systems.

클러스터 기반의 몽골기상청 수치예보시스템 개발 (Development of Mongolian Numerical Weather Prediction System (MNWPS) Based on Cluster System)

  • 이용희;장동영;조천호;안광득;정효상
    • 대기
    • /
    • 제15권1호
    • /
    • pp.35-46
    • /
    • 2005
  • Today, the outreach of National Meteorological Service such as PC cluster based Numerical Weather Prediction (NWP) technique is vigorous in the world wide. In this regard, WMO (World Meteorological Organization) asked KMA (Korea Meteorological Administration) to formulate a regional project, which cover most of RA II members, using similar technical system with KMA's. In that sense, Meteorological Research Institute (METRI) in KMA developed Mongolian NWP System (MNWPS) based on PC cluster and transferred the technology to Weather Service Center in Mongolia. The hybrid parallel algorithm and channel bonding technique were adopted to cut cost and showed 41% faster performance than single MPI (Message Passing Interface) approach. The cluster technique of Beowulf type was also adopted for convenient management and saving resources. The Linux based free operating system provide very cost effective solution for operating multi-nodes. Additionally, the GNU software provide many tools, utilities and applications for construction and management of a cluster. A flash flood event happened in Mongolia (2 September 2003) was selected for test run, and MNWPS successfully simulated the event with initial and boundary condition from Global Data Assimilation and Prediction System (GDAPS) of KMA. Now, the cluster based NWP System in Mongolia has been operated for local prediction around the region and provided various auxiliary charts.

피크저감과 특례요금제를 고려한 ESS 경제성 분석 알고리즘에 관한 연구 (A Study on Economic Analysis Algorithm for Energy Storage System Considering Peak Reduction and a Special Tariff)

  • 손준호
    • 전기학회논문지
    • /
    • 제67권10호
    • /
    • pp.1278-1285
    • /
    • 2018
  • For saving electricity bill, energy storage system(ESS) is being installed in factories, public building and commercial building with a Time-of-Use(TOU) tariff which consists of demand charge(KRW/kW) and energy charge(KRW/kWh). However, both of peak reduction and ESS special tariff are not considered in an analysis of initial cost payback period(ICPP) on ESS. Since it is difficult to reflect base rate by an amount of uncertain peak demand reduction during mid-peak and on-peak periods in the future days. Therefore, the ICPP on ESS can be increased. Based on this background, this paper presents the advanced analysis method for the ICPP on ESS. In the proposed algorithm, the representative days of monthly electricity consumption pattern for the amount of peak reduction can be found by the k­means clustering algorithm. Moreover, the total expected energy costs of representative days are minimized by optimal daily ESS operation considering both peak reduction and the special tariff through a mixed-integer linear programming(MILP). And then, the amount of peak reduction becomes a value that the sum of the expected energy costs for 12 months is maximum. The annual benefit cost is decided by the amount of annual peak reduction. Two simulation cases are considered in this study, which one only considers the special tariff and another considers both of the special tariff and amount of peak reduction. The ICPP in the proposed method is shortened by 18 months compared to the conventional method.

클라우드 컴퓨팅 기반 BIM 서비스를 위한 BIM 서버 기반의 뷰어 개발 (A Prototype BIM Server based viewer for Cloud Computing BIM Services)

  • 윤수원;김병곤;최종문;권순욱
    • 대한토목학회논문집
    • /
    • 제33권4호
    • /
    • pp.1719-1730
    • /
    • 2013
  • 최근 BIM 기술은 적용 확대가 모색되고 있으나, 관련 제도 미비, BIM 인프라 구축비용, 프로세스 상이 등과 같은 문제로 인해 초기 기대치보다 확산이 지연되고 있다. 따라서 본 연구는 이러한 문제 중, BIM 운영을 위해 필요한 인프라 구축 비용 절감과 국내 프로세스에 맞는 다양한 BIM 서비스 제공을 위한 방안으로 클라우드 컴퓨팅 기술과 BIM을 접목하는 것을 제안하고, 이를 위한 수요 조사를 바탕으로, 클라우드 컴퓨팅을 이용한 인프라 비용 절감(IaaS 구축)을 위한 IFC 기반 BIM 서버와 맞춤형 서비스(SaaS 제공)를 위한 Viewer를 개발하였다. 또한 본 연구에서는 개발된 시스템의 실용화 가능 여부에 관한 성능 테스트를 실시하여, 개발 결과물이 향후 클라우드 기반 BIM 서비스 개발의 요소기술로 활용될 수 있다는 것을 검증하였다.

BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안 - BIM 소프트웨어와 EXCEL VBA를 이용한 자동화과정을 중심으로 - (A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan - Case Study on Automation Process Using BIM Software and Excel VBA -)

  • 류재호;황종민;김솔이;서화영;이지현
    • 한국BIM학회 논문집
    • /
    • 제12권2호
    • /
    • pp.49-59
    • /
    • 2022
  • The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

Industrialized Building Systems for the Kingdom of Saudi Arabia

  • Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.73-79
    • /
    • 2017
  • Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.

  • PDF

항만시설 프로젝트의 시뮬레이션을 활용한 재설계 VE 적용방안 (The Application Plan for Value Engineering Redesign by Using The Simulation for The Port Facilities Construction Project)

  • 윤무희;안경수
    • 한국해안해양공학회지
    • /
    • 제19권6호
    • /
    • pp.533-546
    • /
    • 2007
  • 본 연구는 턴키 발주공사의 전면적인 재설계 과정에서 원가절감과 사용자 중심의 요구조건을 충족 시킬 수 있는 여러 방법들 중에서 설계 VE(Value Engineering: 가치공학) 프로세스를 적용한 연구이다. 본 연구에서는 설계 VE 프로세스를 사용하여 합리적이고 실용적인 기능분석 프로세스를 단계별로 정립하였다. 설계 VE가 가지고 있는 문제점으로 프로젝트 시행 시기별 적용 프로세스를 계획단계에서 분석할 수 없는 한계점이 있었으며, 또한 대형프로젝트 수행 과정에 초기분석 및 검증을 할 수 없었다. 본 연구에서는 컴퓨터 시뮬레이션 기법을 도입하여 설계 VE가 가지고 있는 문제점을 보완하고, 효율성과 안전성 등을 증명하였다. 기존에 적용해 온 VE기법은 항만시설물 건설에 적용시 시공분야에만 국한하여 적용됨으로써 기능 및 건설비 절감에는 기여하지 못한 것으로 나타났다. 그러나 본 연구에서 제안한 VE 대상선정 방법에 의하여 기능분석 프로세스를 합리적이고 실용적으로 개선함으로써 재설계 VE 수행절차를 효율적으로 개선 할 수 있었다. 본 연구에서 최적화시킨 VE 기법을 항만시설공사에 실제 적용시킨 결과 약 46억 원의 공사비를 절감하는 효과를 거두었다. 따라서 본 연구 결과를 유사프로젝트에 적용 할 경우 VE를 효과적으로 달성 할 수 있을 것으로 사료된다.