• 제목/요약/키워드: Information construction

검색결과 9,100건 처리시간 0.034초

건설사업관리(CM) 안전관리 정보시스템 개발에 관한 조사연구 (A Field Survey on the Development of Safety Management Information System in the Construction Management)

  • 김영수;박종근
    • 한국안전학회지
    • /
    • 제19권2호
    • /
    • pp.75-87
    • /
    • 2004
  • This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private indtitutes according to different systems can be eliminated for the securing of systematic and efficient safety managment. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.

원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구 (A basic study 3D model advancement method for nuclear power plant)

  • 임병기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

A Study on Development of IT System Roadmap in Construction industry

  • Xue-Quan Lee;Moon-Seo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1404-1409
    • /
    • 2009
  • These days, the extension and complication of construction project has attached greater significance to IT system for effective project management. Construction companies inside the country have established IT system, but the fact is that they are not up to the expectations of investment provision, and the absense of objective and strategy about project management information system makes its efficiency doubtful. The research, from the point view of construction company, makes an estimate of indefinite future, and presents the process of making out IT system roadmap as a long-term strategy in building IT system.

  • PDF

Valuation of Benefits from the Adoption of Project Information Management System

  • Kyong Ju Kim;Kyoungmin Kim;Ki Yong Kang;Geon Hee Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1548-1552
    • /
    • 2009
  • In the construction industry, IT has been an alternative for the enhancement of productivity and technical advances through a paradigm shift. While it has been recognized that the IT system will have a substantial influence on the industry, a quantitative valuation has been very limited. This paper has chosen EVMS (Earned Value Management System), which supports the integrated management of cost and schedule by utilizing IT tools, and which is the largest trend in the construction IT industry in Korea, in order to suggest an analysis model for the valuation of IT. The CVM (Contingent Valuation Method) is used to quantitatively measure intangible value of IT application. Then, a valuation and analysis model were suggested for the quantitative valuation of the effect of IT adoption. In terms of willingness to pay for EVMS, the expected benefits from the adoption of EVMS were US$ 584.52 per man annually. This research should be helpful for construction companies evaluating their investment to Project Management Information System.

  • PDF

건설 프로세스 향상을 위한 유비쿼터스 기술의 적용 (Application of Ubiquitous Technologies for Construction Process)

  • 문성우;홍승문
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2006년도 정기 학술대회 논문집
    • /
    • pp.43-49
    • /
    • 2006
  • Construction CALS has contributed much to the improvement of construction management. Recently, the ubiquitous technology brings another opportunities for expanding tile business horizon in construction. The government policies to upgrade the information technologies in Korean offer an environment in which practical application of ubiquitous becomes more practical. To maintain the level of competitiveness, construction companies need to pay attention to the chance of ubiquitous technologies. This paper introduces the research movement in the construction industry in an attempt to find out the feasibility of ubiquitous technologies such as RFID, USN, etc. The construction process, which is executed in the natural environment, will benefit from the state-of-are information technologies in terms of improved communication interface.

  • PDF

초고층 공사 리프트의 그룹제어 시스템 적용을 위한 기초 연구 (A Preliminary Study to Apply Group Control System to Lifts for High-rise Construction)

  • 김태훈;임현수;김창원;김승우;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.260-261
    • /
    • 2017
  • The objective of this study is to propose the basic design plan of system by comparing and analyzing application environment of lift and elevator group control system, as preliminary study for the application of group control system to lifts for high-rise construction. The basic design plan is suggested in terms of group control algorithm, hall call system type, operation information recording device, information communication method, and operation method. The results of this study can be used as basic data for software and hardware design for application of group control technology of lifts for super tall building construction and ultimately contribute to improve the operation efficiency of lift for high-rise construction.

  • PDF

건설분야에서의 설계문서 DTD 개발 (A Development of Design Document's DTD in Construction Project)

  • 정성윤;김진욱;옥현;김성진
    • 한국정보처리학회:학술대회논문집
    • /
    • 한국정보처리학회 2003년도 추계학술발표논문집 (하)
    • /
    • pp.1469-1472
    • /
    • 2003
  • 본 연구는 도로, 하천, 댐 등 시설물 건설공사를 설계하는 과정에서 생성되는 각종 보고서, 계산서, 내역서 등의 설계문서를 단순하게 전자화하지 않고 정해진 구성체계와 항목에 따라 전자화 할 수 있도록 전자문서 표준체계를 정립하고자 DTD를 개발하였다. 아울러, XML을 기반으로 설계문서를 전자문서화하기 위한 개발 절차와 방법을 마련하였으며 건설분야에 설계문서 DTD를 적용하기 위한 방안을 제시하고자 하였다.

  • PDF

활성화함수와 학습노드 진행 변화에 따른 건축 공사비 예측성능 분석 (Analysis on the Accuracy of Building Construction Cost Estimation by Activation Function and Training Model Configuration)

  • 이하늘;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제12권2호
    • /
    • pp.40-48
    • /
    • 2022
  • It is very important to accurately predict construction costs in the early stages of the construction project. However, it is difficult to accurately predict construction costs with limited information from the initial stage. In recent years, with the development of machine learning technology, it has become possible to predict construction costs more accurately than before only with schematic construction characteristics. Based on machine learning technology, this study aims to analyze plans to more accurately predict construction costs by using only the factors influencing construction costs. To the end of this study, the effect of the error rate according to the activation function and the node configuration of the hidden layer was analyzed.

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

Robust Real-time Object Detection on Construction Sites Using Integral Channel Features

  • Kim, Jinwoo;Chi, Seokho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.304-309
    • /
    • 2015
  • On construction sites, it is important to monitor the performance of construction equipment and workers to achieve successful construction project management; especially, vision-based detection methods have advantages for the real-time site data collection for safety and productivity analyses. Although many researchers developed vision-based detection methods with acceptable performance, there are still limitations to be addressed: 1) sensitiveness to the shape and appearance changes of moving objects in difference working postures, and 2) high computation time. To deal with the limitations, this paper proposes a detection algorithm of construction equipment based on Integral Channel Features. For validation, 16,850 frames of video streams were recorded and analyzed. The results showed that the proposed method worked in high performance in terms of accuracy and processing time. In conclusion, the developed method can help to understand useful site information including working pattern, working time and input manpower analyses.

  • PDF