The construction field is implementing cost savings and business process improvements by adopting and applying various information technologies to secure the construction sector's technological competitiveness amid the economic recessions inside and outside South Korea. Therefore, affiliated agencies of the Ministry of Land, Infrastructure, and Transport are reinforcing transparency and efficiency in construction project management through informatization. These agencies are also performing construction project management and maintenance and management businesses by constructing various information systems to create higher added values and secure competitiveness. However, as the application of the constructed information system is limited to a portion of public construction projects, it is not yet possible to understand the whole status of the national infrastructures. Therefore, this paper aims to propose a construction information service plan, its future promotion method and procedure of application on the entire national infrastructures. This plan would be carried out by collecting, linking and fabricating the main construction information from the information systems of the affiliated agencies around the construction project information system(Construction CALS System) being applied at the organizations under the Ministry of Land, Infrastructure, and Transport. Such a plan is expected to facilitate effective project management and maintenance of public construction projects and serve as a useful tool for major decision making endeavors such as future policy planning. The proposed plan is also expected to facilitate the management and application of construction information from the construction up to the maintenance management of the national infrastructures.
Journal of the Korean BIBLIA Society for library and Information Science
/
v.29
no.4
/
pp.57-68
/
2018
In a situation when domestic construction market is expected to be stagnant, Overseas Information System for Construction Engineering (OVICE) is operated to support the construction SMEs that advance to the global market. In this study, we aimed to improve the quality of information service by providing direction of information provision, by comparing expert questionnaire with information system user statistics. For statistical analysis of information systems, to improve the efficiency of statistical analysis that is difficult to prioritize, K-means clustering is used for more efficient analysis. As a result, analyzing the difference between the survey results and the information system statistics, we were able to identify improvement point of information provision in the system and important contents that were not highlighted during the survey.
Kim Changyong;Hong Sungwan;Bae Gyujin;Kim Kwangyeom
한국지구물리탐사학회:학술대회논문집
/
2003.11a
/
pp.262-271
/
2003
Specification of reinforcement method was suggested according to the ground condition and tunnelling environment such as adjacent building and surface settlement. Tunnel database consists of 8 different groups of data according to the tunnel construction situations and major problems of ground. A tunnel countermeasure expert system based on client/server system was developed with on-line. The expert system provides proper solution to the each construction sites backing up the information of the tunnelling and ground information through Internet. The effective factors of tunnel construction were shown by the analyzing relationship and partial relationship between face stability and RMR factors. This study will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system escaping from the dependence of some experienced experts for the absent of guide.
Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety control of domestic CM, this study analyzed safety control operation system in CM home and abroad and suggested a model for the construction of safety control management information system suitable to the conditions of Korea.
Kang Leen-Seok;Moon Hyoun-Seok;Park Seo-Young;Lee Yang-Kyu
Proceedings of the KSR Conference
/
2005.11a
/
pp.1143-1148
/
2005
Recently, the application of construction IT (Information Technology) is recognized as an essential tool for the effective construction management and construction CALS. And the large construction projects are already using PMIS tool, and the application of construction IT tool will be accelerated by rapid popularization of computerized construction management system. This study defines a concept of construction IT and suggests an improved method to apply construction IT tool for construction supervision system.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.654-657
/
2008
Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.
Park, Yong-Sung;Oh, Chi-Don;Jeon, Yong-Seok;Park, Chan-Sik
Korean Journal of Construction Engineering and Management
/
v.9
no.6
/
pp.257-267
/
2008
In order to encourage construction practitioners to acknowledge failures and disseminate the information, the failure information must be documented and accumulated with a well-structured format, which contains not only the fact and result but also the circumstance and cause of the failure. In the Korean construction industry, many failures are not explained clearly and often not even reported publicly, partly because due to the lack of understanding positive aspects of failures, which can improve construction practices as a result of learning from failures. The purpose of this study is to develop a web-based construction failure information system using the case-based reasoning techniques, which can systematically accumulate, manage, and share the valuable failure information using a structured failure cases database. It can be utilized for planning proactive solutions on future failures by searching the very similar past failure cases.
Proceedings of the Korean Institute of Building Construction Conference
/
2019.05a
/
pp.127-128
/
2019
The cost of procurement in construction projects varies depending on the type of project, but the proportion of the cost component is very large. Therefore, efficient procurement system operation affects the success of the project. However, difficulties arise in procurement management due to problems such as availability of data due to limited information, inaccurate scheduling and integration of costs. Therefore, the purpose of this study is to develop a procurement management system to help efficient communication decision by combining Big Data which can analyze a lot of information and Block Chain technology which can secure information and record reliability to satisfy the above requirements. The results of this study are used to develop a system to develop academically improved procurement management system and practically to develop a system to secure business competitiveness and to facilitate rapid communication among project participants.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.68-73
/
2008
Recently, construction management technology based on information technology is being changed from numerical information management to visual information management with virtual reality (VR) method. This study suggests a IDEF0 model for development process of VR system for the planning, design and construction phases of civil engineering project. And the simulation functions by each phase based on VR were developed by using the suggested IDEF0 model. The developed virtual construction system can be used as an effective design review tool by visualization of design information based on 3D object.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.458-461
/
2001
The whole of industry sectors are getting achieved BPR(Business process Reencountering) which innovate the inefficient product organization through examined the value chain. Besides, they try to integrate ERP, CRM, and SCM which is based on value chain. Construction Industry, however, not only is not regularized it but is not inadequacy about information mind. Nowadays Korean government lead the construction CALS, only some large company Innovate and restructure the organization and product structure. It Is necessary to efficient manage the project information and historical data and develop CIC/PMIS to transfer from the function based information-flow to the project based information-flow. The purpose of the Information management system's success In Korea, therefore, this paper analyzes the information-intensive problems and proves the device to achieve the Information Management System through the Standardization, Synchronization, Centralization for Construction Company.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.