• Title/Summary/Keyword: Information Management Process

Search Result 6,571, Processing Time 0.031 seconds

Pattern-based Business Process Change Management in Dynamic Business Environment

  • Kim, Dongsoo;Kim, Minsoo
    • Journal of Information Technology and Architecture
    • /
    • v.10 no.3
    • /
    • pp.295-303
    • /
    • 2013
  • This paper presents a new approach to managing dynamic business process changes based on business process change patterns. We identify and categorize business process change patterns that occur recurrently in a dynamic business environment. Several issues regarding management of process versions are discussed, and a pattern-based version management method for handling process changes more flexibly is explained in detail. We propose a mechanism for abstract process execution with runtime encapsulation of a business process, which can maximize the flexibility of process execution using multiple process versions. In addition, we propose a concept of process promotion and demotion that can dynamically choose an actual version of the process at run-time. With our pattern-based process change management and versioning approach, it is expected that the flexibility and efficiency of BPM systems can be enhanced significantly.

INFORMATION MODEL FOR DESIGN MANAGEMENT IN ROADWAY CONSTRUCTION PROJECTS

  • Kwanhee Cho;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1165-1170
    • /
    • 2005
  • This paper describes an information model, devised to manage roadway design information and to improve the collaboration among the multidisciplinary design teams. An analysis concerning the workflow, the rules and the functions of current roadway design was conducted. A process model based on the result of the analysis was developed by utilizing IDEF0 methodology. The process model reflects the interdependencies among multidisciplinary design disciplines and is capable of managing communication processes. This paper also discusses the design information hierarchy and the component representation schemes for systematic design information management. It is anticipated that the proposed information model would be able to improve the overall process of design of roadway construction projects by managing design information and helping the participants communicate and share information of the project effectively.

  • PDF

Development of Construction Process Safety Information Management System for Safety Accident Prevention (안전사고 예방을 위한 건설업 공정 안전 정보 관리 시스템 개발)

  • Jun Hyun Jong;Yang Kwang Mo;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.11-23
    • /
    • 2005
  • It is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

Development of Construction Process Safety Information System Using Analytic Hierarchy Process (AHP를 활용한 건설공정 안전평가 정보시스템 개발)

  • Kim Min-Jun;Jo Jung-Hyun;Jun Hyun-Jeong;Lee Byung Gee
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.39-44
    • /
    • 2005
  • Process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

  • PDF

A Study on the Construction and Improvement of Software Process Infrastructure for Software Firms In Korea (국내 소프트웨어 사업자의 프로세스 기반구조 구축 및 개선 방안 연구)

  • Ahn, Yeon-Shick;Moon, Song-Chul;Kim, Dong-Soo
    • Asia pacific journal of information systems
    • /
    • v.14 no.4
    • /
    • pp.23-47
    • /
    • 2004
  • This study was tried for the improvement of software process ability of the software firms, and analyzed empirically the impact that a software process infrastructure level influences on the software process level and process performance. The questionnaire were developed and data were collected from the process improvement correspondences or project quality managers of the 78 software firms. The result was shown that management-organization infrastructure was composed of software process improvement organization's role and activity, process standard and education, management system and supporting, management guides and procedures. And organization's standard development procedure or criteria, process asset, process support tools were included in technical infrastructure. This study provides that some components of software process infrastructure had an significant influence on the process level, process infrastructure management level, and software process performance.

A Study on Evaluation Model of Business Process Management Systems based on Analytical Hierarchy Process (AHP 기반의 비즈니스 프로세스 관리시스템 평가 모형에 관한 연구)

  • Yu, Sung-Yeol
    • Management & Information Systems Review
    • /
    • v.31 no.4
    • /
    • pp.433-444
    • /
    • 2012
  • The purpose of this study is to develop the evaluation model of BPMS(business process management systems) based on AHP(analytical hierarchy process). In this study, we draw some criteria to select BPMS solution from a experts panel. And, we develop an evaluation model based on AHP method. As a result, each organization can select the effective BPMS solution from the proposed evaluation model.

  • PDF

Development and Application of Process Incapability Index including Capability Analysis of Inspection or Gage System (검사/계측시스템의 능력분석을 포함한 비공정능력지수의 개발과 적용)

  • 민성진;김계완;류정현;윤덕균
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.1
    • /
    • pp.118-132
    • /
    • 2002
  • This paper presents a process incapability index to provide manager with various information of process and to reduce cost. The introduced process incapability indices indicate information about mean and variance of manufacturing process and variance of inspection process to evaluate process capability using ratio of variance and difference between target and mean to specification. This model can be used by the scale of six sigma management.

ANALYZING EFFECTIVE FACTOR OF THE CHANGE MANAGEMENT BASED ON URBAN REGENERATION PROJECT IN REPUBLIC OF KOREA

  • Jae-Pil Seo;Yoon-Ki Choi;Bo-Sik Son;Han-Guk Ryu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.591-596
    • /
    • 2011
  • There are quite a number of business processes in the urban regeneration project. Managers and participants who involved in the project make and use information for the best way to perform in the particular business process. The information can be also reused and produced for data at the next stage. Accordingly, the information sometimes goes out of existence and work data up into new information when the urban regeneration project has been accomplished. But in that case some of changes happen occasionally, the business for urban regeneration has suffered a loss of profit and time as result of confusions about decisions and inappropriate action. For that reason, the information should be analyzed to achieve its aim at the business process under the influence of changes. Then, even though detail processes and management method change, the Core Information, which are important factors for accomplishing the project, help that the project can be operated to solve the problem about confusion and loss of the business. In conclusion, the Core Information is main effective factors for successful urban regeneration projects on the change management. The purpose of this study is to research the information according to the Information-flow and changes, and to find out the influence factors and the Core Information to manage efficiently at the process of urban regeneration projects.

  • PDF

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

A Methodology of Implementing the Business Process-based Knowledge Management System and its Case Study (BPM 기반의 KMS 통합 구축 방안 및 적용사례: 'H'중공업 영업 및 견적업무 프로세스를 중심으로)

  • Kim, Tae-Chul;Jang, Gil-Sang
    • The Journal of Information Systems
    • /
    • v.18 no.3
    • /
    • pp.299-326
    • /
    • 2009
  • R In today's competitive and global business management, Concern of an enterprise is to strengthen the core competency and improve it's internal business process. Therefore, Interest in BPM(Business Process Management) has grown rapidly. BPM is recognized as best solution to meet the needs of organizations that seek the cost down, integration of information, reducing of risk, improvement of productivity. In the past, the company have usually made huge investments in knowledge management systems which are based on repository keeping tacit knowledge. But this paper shows feasibility of implementation of business process-based knowledge management system that could link knowledge with business process. From an academic point of view, Although There could be several ways to build the business process-based KMS. In this paper, when BPM project and KMS project were started at the same time, the way of how to provide workers with task-related knowledge was discussed. As an case study, an estimate process of H company was analyzed and process modelling was carried out and conceptional architecture framework was depicted.

  • PDF