• Title/Summary/Keyword: Information Costs

Search Result 2,719, Processing Time 0.031 seconds

Traceable Ciphertet-Policy Attribute-Based Encryption with Constant Decryption

  • Wang, Guangbo;Li, Feng;Wang, Pengcheng;Hu, Yixiao
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.9
    • /
    • pp.3401-3420
    • /
    • 2021
  • We provide a traceable ciphertext-policy attribute based encryption (CP-ABE) construction for monotone access structures (MAS) based on composite order bilinear groups, which is secure adaptively under the standard model. We construct this scheme by making use of an "encoding technique" which represents the MAS by their minimal sets to encrypt the messages. To date, for all traceable CP-ABE schemes, their encryption costs grow linearly with the MAS size, the decryption costs grow linearly with the qualified rows in the span programs. However, in our traceable CP-ABE, the ciphertext is linear with the minimal sets, and decryption needs merely three bilinear pairing computations and two exponent computations, which improves the efficiency extremely and has constant decryption. At last, the detailed security and traceability proof is given.

Implementation of Quality Management System for Wild-Simulated Ginseng Using Blockchain

  • Sung, Youngjun;Won, Yoojae
    • Journal of Information Processing Systems
    • /
    • v.18 no.2
    • /
    • pp.173-187
    • /
    • 2022
  • A special government agency has been charged with implementing quality management to guarantee the quality of wild-simulated ginseng. However, these processes are carried out by use of documents, and this has resulted in information omission and high document management costs. To solve this problem, this study analyzed the existing quality management process by using a smart contract for the existing offline form and proposed a new quality management system for storing and managing all log data in the blockchain. This system reduced documentation management costs about quality management and recorded information in the previous step through the quality management steps, thus forming a step-by-step record chain. Experiments were conducted by implementing this system, which improved data integrity and reliability. Additionally, sensitive information, such as personal information, was included in the system by use of the off-chain technology.

Verification of ERP Standard Time Using TOC Technique and Improvement of MES Routing Point (TOC 기법을 적용한 ERP 표준시간 검증 및 MES 공정실적개선)

  • Kim, Sung-Min;Ahn, Jaekyoung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.22-33
    • /
    • 2018
  • Recently domestic manufacturing companies have been experiencing worsening profitability and stunted growth due to the long-term economic recession and the rapid rise of developing countries such as China and Southeast Asia. These difficulties force many companies to concentrate their core competencies on new value creation and innovation in order to gain momentum for new growth. Enterprise Resource Planning (ERP) has been considered as one of viable solutions. Among the various modules in ERP, shop floor control function in the production management module is rather limited. In order to overcome this problem, Manufacturing Execution System (MES) has been used as a subsystem which has a strong information gathering power and flexibility. Both systems interact closely with each other. In particular, ERP requires fast, accurate shop floor information at MES. This paper describes how to synchronize relevant information between ERP and MES with theory of constraints (TOC). The processing time information transmitted from the MES workplace is received at the ERP workplace. In the process, the received processing time is causing information distortion in ERP, when the information gathering standard of MES is different from the ERP information interpretation standard. The Drum-Buffer-Rope theory of TOC was applied to resolve this problem, therefore, information synchronization between both systems was made. As a precondition, the standard time of the upper ERP system was rearranged according to the capacity constraints resource. As a result, standard time restructuring has affected changes in labor costs. Standard labor costs have come close to actual ones, and information synchronization of MES transmission data has improved the reliability of standard product costs, such that it enabled various company-wide restructuring actions to be much more effective.

The Socioeconomic Cost of Diseases in Korea (질병의 사회.경제적 비용 추계)

  • Ko, Suk-Ja;Jung, Young-Ho
    • Journal of Preventive Medicine and Public Health
    • /
    • v.39 no.6
    • /
    • pp.499-504
    • /
    • 2006
  • Objectives : The aim of the study was to estimate the annual socioeconomic cost of diseases in Korea. Methods : We estimate both the direct and indirect costs of diseases in Korea during 2003 using a prevalence-based approach. The direct cost estimates included medical expenditures, traffic costs and caregiver's cost, and the indirect costs, representing the loss of production, included lost workdays due to illness and lost earnings due to premature death, which were estimated based on the human capital theory. The cost estimates were reported at three different discount rates (0, 3 and 5%). Results : The cost of diseases in Korea during 2003 was 38.4 trillion won based on 0% discount rate. This estimate represents approximately 5.3% of GDP The direct and indirect costs were estimated to be 22.5 trillion (58.5% of total cost) and 15.9 trillion won (41.5%), respectively. It was also found that the cost for those aged $40\sim49$ accounted for the largest proportion (21.7%) in relation to age groups. The cost of diseases for males was 23.5% higher than that for females. For major diseases, the total socioeconomic costs were 16.0, 13.4, 11.3 and 11.19% for neoplasms, and diseases of the digestive, respiratory and circulatory systems, respectively. Conclusions : This study can be expected to provide valuable information for determining intervention and funding priorities, and for planning health policies.

A Markov-based prediction model of tunnel geology, construction time, and construction costs

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Ali, Hunar Farid Hama;Salim, Sirwan Ghafoor;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.421-435
    • /
    • 2022
  • The necessity of estimating the time and cost required for tunnel construction has led to extensive research in this regard. Since geological conditions are significant factors in terms of time and cost of road tunnels, considering these conditions is crucial. Uncertainties about the geological conditions of a tunnel alignment cause difficulties in planning ahead of the required construction time and costs. In this paper, the continuous-space, discrete-state Markov process has been used to predict geological conditions. The Monte-Carlo (MC) simulation (MCS) method is employed to estimate the construction time and costs of a road tunnel project using the input data obtained from six tunneling expert questionnaires. In the first case, the input data obtained from each expert are individually considered and in the second case, they are simultaneously considered. Finally, a comparison of these two modes based on the technique presented in this article suggests considering views of several experts simultaneously to reduce uncertainties and ensure the results obtained for geological conditions and the construction time and costs.

A Case Study on the Information Systems Operations and Maintenance (정보시스템 운영 및 유지보수 업무에 관한 사례 연구)

  • Hwang Kyung Tae;Nam Kichan;Kim Hwasik
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.3
    • /
    • pp.77-87
    • /
    • 2004
  • The importance of information systems(IS) operations and maintenance is increasing as the costs of IS operations and maintenance take larger share of total IS costs and organization's dependency on IS is increasing. However, this area has received relatively little attention from scholars and practitioners despite of its significance. The main objectives of this study are to provide practical guidelines for improving IS operations and maintenance practices, and to propose a research framework for this area. To accomplish this objectives, the following three issues are investigated. First, IS operations and maintenance practices of a case company are analyzed. Second, the current practices are compared with best practices. Finally, suggestions are made based on the analyses to improve the IS operations and maintenance practices.

  • PDF

An Empirical Performance Analysis on Hadoop via Optimizing the Network Heartbeat Period

  • Lee, Jaehwan;Choi, June;Roh, Hongchan;Shin, Ji Sun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.12 no.11
    • /
    • pp.5252-5268
    • /
    • 2018
  • To support a large-scale Hadoop cluster, Hadoop heartbeat messages are designed to deliver the significant messages, including task scheduling and completion messages, via piggybacking to reduce the number of messages received by the NameNode. Although Hadoop is designed and optimized for high-throughput computing via batch processing, the real-time processing of large amounts of data in Hadoop is increasingly important. This paper evaluates Hadoop's performance and costs when the heartbeat period is controlled to support latency sensitive applications. Through an empirical study based on Hadoop 2.0 (YARN) architecture, we improve Hadoop's I/O performance as well as application performance by up to 13 percent compared to the default configuration. We offer a guideline that predicts the performance, costs and limitations of the total system by controlling the heartbeat period using simple equations. We show that Hive performance can be improved by tuning Hadoop's heartbeat periods through extensive experiments.

A Market-Based Replacement Cost Approach to Technology Valuation (기술가치평가를 위한 시장대체원가 접근법)

  • Kang, Pilsung;Geum, Youngjung;Park, Hyun-Woo;Kim, Sang-Gook;Sung, Tae-Eung;Lee, Hakyeon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.2
    • /
    • pp.150-161
    • /
    • 2015
  • This paper proposes a new approach to technology valuation, the market-replacement cost approach which integrates the cost-based approach and market-based approach. The proposed approach estimates the market-replacement cost of a target technology using R&D costs of similar R&D projects previously conducted. Similar R&D projects are extracted from project database based on document similarity between project proposals and technology description of the target technology. R&D costs of similar R&D projects are adjusted by mirroring the rate of technological obsolescence and inflation. Market-replacement cost of the technology is then derived by calculating the weighted average of adjusted costs and similarity values of similar R&D projects. A case of "Prevention method and system for the diffusion of mobile malicious code" is presented to illustrate the proposed approach.

A Study on the Importer Security Filing and Additional Carrier Requirements(10+2 rule) in U.S. (미국 관세청의 선적전 추가 보안관련 정보 제출법안(10+2 Rule)에 관한 연구)

  • Song, Seon-Uk
    • International Commerce and Information Review
    • /
    • v.10 no.4
    • /
    • pp.395-416
    • /
    • 2008
  • The advance information for oceangoing cargoes destined to th United States enable CBP to evaluate the potential risk of smuggling WMD and to facilitate the prompt release of legitimate cargo following its arrival in the Unites States. On January 1, 2008, CBP promulgate regulations, also known as 10+2 rule, to require the electronic transmission of additional data elements for improved high-risk targeting, including appropriate security elements of entry data for cargo destined to the United States by vessel prior to loading of such cargo on vessels at foreign seaports. The potential impact to an importer's international supply chain will be as follows ; Firstly, importers will take incremental supply chain costs and filing costs. Secondly, anticipate delay in shipment of containerized cargo. Thirdly, importers could be charged fines if they fail to file and file inaccurate or missing data. Companies exporting to the United States should be interested in 10+2 rule, analyze their current processes and procedures to ensure that they are prepared to handle the additional filing requirements of 10+2 rule. And they should focus on how 10+2 impacts their supply chain in terms of costs and sourcing. They will be necessary to revise service legal agreements with their forwarders, customs brokers or carriers in order to meet filing requirements of 10+2 rule.

  • PDF

A Study on the Methodology of U-City Services Standardization (신도시 U-City 서비스 표준화 방법론에 관한 연구)

  • Lee, Sang Hun;Yang, Dong Suk
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.4
    • /
    • pp.53-62
    • /
    • 2012
  • U-City means the high-tech city that applied ubiquitous technology and information communication technology. U-City aims to intensify urban competitiveness and to improve the quality of residents' life through efficient management of the urban. Currently, 77 U-City projects is underway. The each project cost and scale estimate is not clear in the absence of the U-Service Standardization Model. So, many of the project are trouble about making a production the proper number of U-Service or the cost of project. The excessive service construction is reflected on the construction costs, which leads to the rise of sales price and passes onto the executor of a project as a burden of the project costs, and the problem of the delay of the change-over occurs due to supporting the operation costs for the operation of the constructed service and the demand for additional installation of facilities between a local autonomous entity and the executor of a project. In this paper, we suggested the U-Services Construction Standardization Methods and proposed the standardization services guideline of crime prevention services. U-City services in the future are able to maintain the consistency of the system through the utilization of the proposed standard model. As a result, the U-City project's pre-estimated cost and scale can be extracted.