• Title/Summary/Keyword: Information Costs

Search Result 2,719, Processing Time 0.032 seconds

The Effect of Inefficient Management on Debt Ratio in Public Institutions

  • Jang, Ji-Kyung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.4
    • /
    • pp.223-229
    • /
    • 2021
  • This study investigated the determinants of debt ratio in public institutions. For this purpose, we analyzed the impact of inefficient management as internal factors on debt ratio. In this paper, inefficient management included total costs, payment, and employee benefit. The results of this study are as follows. First, we find that there is a significant positive relation between total costs and debt ratio. This result means that the higher total costs, the higher debt ratio. Second, we find that there is not a significant relation between payment and debt ratio. And we also find that there is not a significant relation between employee benefit and debt ratio. These results are empirical results that can be answers about some concerns that inefficient management of public institutions worsen debt ratio.

Cost Estimation System for Design Evalution (설계평가를 위한 제조비용산정 시스템)

  • 박홍석;이규봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.281-284
    • /
    • 2000
  • For estimation manufacturing cost during the early design stage, desingers have to know compositon of manufacturmg cost. Manufacturing cost is summalion of material cost and processmg cost. To be able to control the manufacturmg cost, it is necessary to estimate the costs adequately and to store the cost data in a generic way. a generic system, which is the basis for the control of the production costs, takes into account geometric information, material information, process information and production planning information Manufacturing cost is summation of material cost and processing cost.

  • PDF

Development of a Descriptive Cost Effectiveness Model for a Subcontractor with Limited Resources

  • Kim, Dae Young
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.40-48
    • /
    • 2017
  • It only takes one failed project to wipe out an entire year's profit, when the projects are not managed efficiently. Additionally, escalating costs of materials and a competitive local construction market make subcontractors a challenge. Subcontractors have finite resources that should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. The objective of this thesis is to identify the effect of productivity changes on the total cost resulting from shifting crews across projects using a descriptive model. To effectively achieve the objective, this study has developed a descriptive cost model for a subcontractor with multi-resources and multi-projects. The model was designed for a subcontractor to use as a decision-making tool for resources allocation and scheduling. The model identified several factors affecting productivity. Moreover, when the model was tested using hypothetical data, it produced some effective combinations of resource allocation with associated total costs. Furthermore, a subcontractor minimizes total costs by balancing overtime costs, tardiness penalties, and incentive bonus, while satisfying available processing time constraints.

The Impact of Switching Costs on Intention to Stay with MS-Windows (윈도 운영시스템의 지속적 사용의도에 전환비용이 미치는 영향)

  • 현정석
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.1
    • /
    • pp.69-82
    • /
    • 2004
  • The role of switching costs in customer retention has been posited, but has not been subjected to rigorous empirical testing. Therefore, our main focus is on the factors that influence whether consumers will have intention to switch or stay with an incumbent technology (e.g., MS-Windows). Based on consumer survey with MS-Windows users, we find empirical support for the link between the existence of compactible software, consumer's expertise in MS-Windows and intention to stay with MS-Windows. Specifically, switching costs are found to be positively associated with the existence of compatible software. Further, the lack of expertise in MS-Windows on the part of consumers tends to increase the likelihood that they will rely on current MS-Windows, rather than switch to other alternative operating systems.

  • PDF

A Cooperative Game Embedding Transmission Pricing in the Competitive Electricity Market (송전요금을 고려한 게임이론적 전력거래분석)

  • Kang, Dong-Joo;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.3-5
    • /
    • 2000
  • It has been the paradigm of game theory that more than two utilities compete and determine the price and amount of dispatch. In order for this theory to be available on real power system, it is necessary to consider the transmission costs as well as the generation costs. In addition Independent System Operator(ISO) should be able to mitigate the congestion, recover the transmission costs and provide information for long-term capacity investment by devising reasonable pricing schemes for the transmission services. Generators also have to take the transmission costs into account when building the bidding strategies. This paper proposes an approach to analyzing the profit maximizing game considering the transmission cost in a competitive electricity market.

  • PDF

Minimizing Project Quality Costs by Activity-Based Prevention (활동기준예방에 의한 프로젝트 품질코스트 최소화)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

Urban Big Data: Social Costs Analysis for Urban Planning with Crowd-sourced Mobile Sensing Data (도시 빅데이터: 모바일 센싱 데이터를 활용한 도시 계획을 위한 사회 비용 분석)

  • Shin, Dongyoun
    • Journal of KIBIM
    • /
    • v.13 no.4
    • /
    • pp.106-114
    • /
    • 2023
  • In this study, we developed a method to quantify urban social costs using mobile sensing data, providing a novel approach to urban planning. By collecting and analyzing extensive mobile data over time, we transformed travel patterns into measurable social costs. Our findings highlight the effectiveness of big data in urban planning, revealing key correlations between transportation modes and their associated social costs. This research not only advances the use of mobile data in urban planning but also suggests new directions for future studies to enhance data collection and analysis methods.

Analysis of Medical Use and Treatment Costs of Hepatocellular Carcinoma Patients Using National Patient Sample Data (환자표본자료를 이용한 간세포암종 환자의 의료이용 특성 및 치료별 의료비용 분석)

  • Oh, Byeong-Chan;Cho, Jeong-Yeon;Kwon, Sun-Hong;Lee, Eui-Kyung;Kim, Hye-Lin
    • Korean Journal of Clinical Pharmacy
    • /
    • v.31 no.2
    • /
    • pp.153-159
    • /
    • 2021
  • Background: With increasing economic evaluation studies on the treatment of or screening tools for liver diseases that cause hepatocellular carcinoma (HCC), interest in the analysis of the medical utilization and costs of HCC treatment is increasing. Therefore, we aimed to estimate the medical utilization and costs of HCC patients, and calculate the cost of main procedures for HCC treatment, including liver transplant (LT), hepatic resection (HR), radiofrequency ablation (RFA), and transarterial chemoembolization (TACE). Methods: We analyzed claim data from January to December 2018 from the Health Insurance and Review and Assessment Service-National Patient Sample (HIRA-NPS-2018) dataset, including data of patients diagnosed with HCC (Korean Standard Classification of Diseases code C22.0) who had at least one inpatient claim for HCC. Results: A total of 715 HCC patients were identified. In 2018, the yearly average medical cost per HCC patient was ₩18,460K (thousand), of which ₩14,870K was attributed to HCC. Among the total medical costs of HCC patients, the inpatient cost accounted for the largest portion of both the total medical and HCC-related costs. The major procedures of HCC treatment occurred most frequently in the order of TACE, RFA, HR, and LT. The average medical cost per treatment episode was the highest for LT (₩87,280K), followed by HR (₩10,026K), TACE (₩4,047K), and RFA (₩2,927K). Conclusion: By identifying the medical costs of HCC patients and the costs of the main procedures of HCC treatment, our results provide basic information that could be utilized for cost estimation in liver disease-related economic evaluation studies.

The Impact of Information Technology Investment on Cost Reduction in Korean Insurance Industry (한국 생명보험산업의 정보화투자와 비용절감)

  • Lee Young-Soo;Jung Kun-Oh
    • Journal of Korea Technology Innovation Society
    • /
    • v.9 no.1
    • /
    • pp.175-198
    • /
    • 2006
  • Analyzing the effects of information technology(IT) in the life insurance Industry is important in establishing the direction for future information technology investment. In this research, the cost-elasticity of IT capital stock was measured by the SUR technique, using the second-order translog cost function, which was drawn out by a Taylor expansion of the multi-product joint cost function. Analysis was made based on data from 1991 to 2003 collected from 33 life insurance firms. The results show that although the effects of information technology investment vary according to individual life insurance firms, half of the life insurance firms surveyed reduced their costs by investing in information technology. The research also revealed that although large life insurance firms reduced their costs by investing in information technology medium & small life insurance firms and foreign ,life insurance firms increase their costs. Additionally, although both information capital and information labor increase as the information budget increases, the increase in information capital is larger than one in information labor. Because the price of information capital is decreased rapidly more than one of information-related labor.

  • PDF