• Title/Summary/Keyword: Influent water quality

Search Result 187, Processing Time 0.021 seconds

Assessing Water Quality of Siheung Stream in Shihwa Industrial Complex Using Both Principal Component Analysis and Multi-Dimensional Scaling Analysis of Korean Water Quality Index and Microbial Community Data (Principal Component Analysis와 Multi-Dimensional Scaling 분석을 이용한 시화공단 시흥천의 수질지표 및 미생물 군집 분포 연구)

  • Seo, Kyeong-Jin;Kim, Ju-Mi;Kim, Min-Jung;Kim, Seong-Keun;Lee, Ji-Eun;Kim, In-Young;Zoh, Kyung-Duk;Ko, Gwang-Pyo
    • Journal of Environmental Health Sciences
    • /
    • v.35 no.6
    • /
    • pp.517-525
    • /
    • 2009
  • The water quality of Lake Shihwa had been rapidly deteriorating since 1994 due to wastewater input from the watersheds, limited water circulation and the lack of a wastewater treatment policy. In 2000, the government decided to open the tidal embankment and make a comprehensive management plan to improve the water quality, especially inflowing stream water around Shihwa and Banwol industrial complex. However, the water quality and microbial community have not as yet been fully evaluated. The purpose of this study is to investigate the influent water quality around the industrial area based on chemical and biological analysis, and collected surface water sample from the Siheung Stream, up-stream to down-stream through the industrial complex, Samples were collected in July 2009. The results show that the downstream site near the industrial complex had higher concentrations of heavy metals (Cu, Mn, Fe, Mg, and Zn) and organic matter than upstream sites. A combination of DGGE (Denaturing Gradient Gel Electrophoresis) gels, lists of K-WQI (Korean Water Quality Index), cluster analysis, MDS (Multi-Dimensional Scaling) and PCA (Principal Component Analysis) has demonstrated clear clustering between Siheung stream 3 and 4 and with a high similarity and detected metal reducing bacteria (Shewanella spp.) and biodegrading bacteria (Acinetobacter spp.). These results suggest that use of both chemical and microbiological marker would be useful to fully evaluate the water quality.

Removal Characteristics of Residual Hydrogen Peroxide (H2O2) according to Application of Peroxone Process in O3/BAC Process (O3/BAC 공정에서 Peroxone 공정 적용에 따른 잔류 과산화수소 제거 특성)

  • Yeom, Hoon-Sik;Son, Hee-Jong;Seo, Chang-Dong;Kim, Sang-Goo;Ryu, Dong-Choon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.12
    • /
    • pp.889-896
    • /
    • 2013
  • Advanced Oxidation Processes (AOP) have been interested for removing micropollutants in water. Most of water treatment plants (WTPs) located along the lower part of Nakdong River have adopted the $O_3/BAC$ process and have interesting in peroxone process a kind of AOP. This study evaluated the removal characteristics of residual hydrogen peroxide ($H_2O_2$) combining with the biofiltration process in the next BAC process when the hydrogen peroxide is applied for the WTP operating $O_3/BAC$ process. In the experiment, changing the temperature and the concentration of $H_2O_2$ of influent, the biofiltration process showed rapidly dropped the biodegradability when the $H_2O_2$ concentration was increased and lowered water temperature while BAC process maintained relatively stable efficiency. The influent fixed at $20^{\circ}C$ and the concentration of $H_2O_2$ at 300 mg/L was continuously input for 78 hours. Most of the $H_2O_2$ in the influent did not remove at the biofiltration process controlled 5 to 15 minutes EBCT condition after 24~71 hours operating time while BAC process controlled 5 to 15 minutes EBCT showed 38~91% removal efficiency condition after 78 hours operating time. Besides, after 78 hours continuously input experiment, the biomass and activity of attached bacterial on the biofilter and BAC were $6.0{\times}10^4CFU/g$, $0.54mg{\cdot}C/m^3{\cdot}hr$ and $0.4{\times}10^8CFU/g$, $1.42mg{\cdot}C/m^3{\cdot}hr$ respectively. These biomass and activity values were decreased 99% and 72% in biofilter and 68% and 53% in BAC compared with initial condition. The biodegradation rate constant ($k_{bio}$) and half-life ($t_{1/2}$) in BAC were decreased from $1.173min^{-1}$ to $0.183min^{-1}$ and 0.591 min to 3.787 min respectively according to increasing the $H_2O_2$ concentration from 10 mg/L to 300 mg/L at $5^{\circ}C$ water temperature and the $k_{bio}$ and $t_{1/2}$ were $1.510min^{-1}$ to $0.498min^{-1}$ and 0.459 min to 1.392 min at $25^{\circ}C$ water temperature. By increasing the water temperature from $5^{\circ}C$ to $15^{\circ}C$ or $25^{\circ}C$, the $k_{bio}$ were increased 1.1~2.1 times and 1.3~4.4 times. If a water treatment plant operating $O_3/BAC$ process is considering the hydrogen peroxide for the peroxone process, post BAC could effectively decrease the residual $H_2O_2$, moreover, in case of spilling the $H_2O_2$ into the water process line, these spilled $H_2O_2$ concentration can be able to decrease by increasing the EBCT at the BAC process.

Early-Year Performance of the Sihwa Constructed Wetland for Stream Water Treatment (하천수 정화를 위한 시화인공습지의 초기 수질 정화능)

  • Kwun, Soon-Kuk;Lee, Kyung-Do;Cho, Young-Hyun;Kim, Song-Bae;Cheon, Gi-Seol
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.47 no.1
    • /
    • pp.93-102
    • /
    • 2005
  • A prototype surface flow constructed wetland was built in the upstream area of Sihwa reclaimed tidal lands to improve the water quality of Lake Sihwa by treating severely polluted stream water. In this study, we monitored hydrology, macrophyte (Phragmites communis Trin,) growth, and water quality in the Banwol and Donghwa wetlands to evaluate their performance during the initial period after the completion of wetland construction, The average removal efficiency($\%$) in each wetland was relatively low compared with the performance data from the North America Wetland Treatment System Database (NADB), which mainly includes urban sewage-treatment wetlands. However, the average removal rates per unit area ($g/m^{2}/day$) were 0.72, 0.72 and 0.51 (BOD), 2,04, 2.46 and 0.70 (SS), 0.89, 0.43 and 1.09 (TN) and 0.02, 0.02 and 0.02 (TP) in the Banwol and Donghwa wetlands and NADB, respectively. The overall performance of the Banwol and Donghwa wetlands was within the expected range of the wetland system processes contributing the reduction of the pollutant load to Lake Sihwa during the initial period of wetland operation. Considering the low influent concentration, high hydraulic loading rate, and insufficient macrophyte growth since the wetland was constructed, better performance is expected if an improved operational scheme is adopted.

Optimization of Operational Conditions of Existing BNR Process with Various C/N Ratio using Simulation Method (시뮬레이션 기법을 이용한 기존 BNR공정의 C/N비 변화에 따른 운전조건 최적화)

  • Rho, Hae-Yeon;Gil, Kyung-Ik
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.3
    • /
    • pp.367-370
    • /
    • 2007
  • Numerous sets of simulation were conducted in order to find out the optimum operational conditions of the existing BNR process using GPS-X program. The model of ASM3 and modified Bio-P module were applied for simulations. From the result of this study, effluent quality was closely related with the step feeding rate and influent C/N ratio. The effluent TN concentration seemed to be significantly affected by step feeding rate at the low C/N condition. But at the high C/N condition, the effluent concentration of TP rather than that of TN was affected by the control of step feeding rate.

Verification of biological nitrogen removal model in anoxic-oxic process (무산소-산소 공정에서 생물학적 질소 제거 모델의 검증)

  • Lee Byung-Dae;Cheong Kung-Hoon
    • Journal of Environmental Science International
    • /
    • v.14 no.12
    • /
    • pp.1155-1161
    • /
    • 2005
  • Anoxic-oxic process were analyzed numerically for the each unit and final TN effluent by Water Quality Management(WQM) model and the results were compared data from these sewage or wastewater treatment plants. No bugs and logic error were occurred during simulation work. All of the simulation results tried to two times were obtained and both results were almost same thus this model has good reappearance. A few of simulation results were deviated with measured data because lack of influent water qualities are reported however simulation results have wholly good relationship with measured data. Also each unit of simulation result was kept good relationship with that of measured data therefore this WQM model has good reliance. Finally, WQM model predicts final TN effluent within ${\pm}4.1\;mg/{\ell}$

Water Quality Modeling of the Ara Canal, Using EFDC-WASP Model in Series (3차원 EFDC-WASP 연계모델을 이용한 경인아라뱃길 수질 예측)

  • Yin, Zhenhao;Seo, Dongil
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.2
    • /
    • pp.101-108
    • /
    • 2013
  • Ara Canal is the first artificial canal in Korea that connects the Han River and the Yellow Sea. Due to mixture of waters with different salinity and water quality, complicated hydrodynamic and water quality distributions are expected to occur inside the canal. An integrated hydrodynamic and water quality modeling system was developed using the 3 dimensional hydrodynamic model, EFDC (Environmental Fluid Dynamics Code) and the water quality model WASP (Water Quality Analysis and Simulation Program). According to the modeling results, BOD, TN, TP and Chl-a concentrations inside the canal were lower at the West Gate side than the Han River side since influent concentrations of the West Gate side are significantly lower. Chemical stratification due to salinity difference were more evident at the West Gate side as vertical salinity difference were more pronounced in this area. On the other hand, Chl-a concentrations showed more pronounced vertical distribution at the Han River side as Chl-a concentrations were higher in this area. It was notable that Dissolved Oxygen concentrations can be lower than 2 mg/L occasionally in the middle part of the canal. While major factor affecting DO concentrations in the canal are inflows via both gates, the other important factor was found to be BOD decay in the canal due to extended hydraulic residence time. This study can be used to predict hydrodynamic conditions and water quality in the canal during the year and thus can be helpful in the development of gate operation method of the canal.

Analysis of Land Use and Pollutant Source Effect on Water Quality Characteristics of the Watershed (유역의 토지이용과 오염원 현황이 수질특성에 미치는 영향 분석)

  • Jung, Kwang-Wook;Jang, Jae-Ho;Kim, Hyung-Chul;Yoon, Chun-Gyeong
    • Korean Journal of Ecology and Environment
    • /
    • v.39 no.1 s.115
    • /
    • pp.41-51
    • /
    • 2006
  • The influence of land use and pollutant source on water quality was investigated using 3-yrs monitoring data major influent stream in Hwaong reservoir watershed. The seven water quality station (N1, N2, J1, J3, J4, E2, E3) were used analysis of land use and pollutant effect, and six water quality station (N3, N4, J2, J5, E1, E4) were used analysis of waster quality status. Water quality parameter were positively correlated with residential and forest, negatively with paddy and upland especially during dry period. During wet period, correlation between land use and water quality was less apparent. Population and livestock density was correlated well to water quality parameter than just number of population and livestock. The watersheds studied are mainly non-urban and their land uses are similar to typical watershed of other estuarine reservoirs, therefore, the correlation developed in this study might be helpful to manage other estuarine reservoir watersheds.

Unit Mass Estimation and Analysis from Fiber Dyeing and Finishing Facility Nearby Nakdong River Basin (낙동강수계에서 섬유염색 및 가공 업체에 대한 공정별 원단위산정 및 분석)

  • Gu, Jung-Eun;Nah, Dong-Hoon;Lee, Seung-Hwan
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.31 no.9
    • /
    • pp.765-774
    • /
    • 2009
  • Fiber Dyeing and Finishing facility has been recognized as an important pollution source due to its consumption of large volumes of water and chemicals. Unit mass discharge for the conventional water quality parameters such as flowrate, SS, $BOD_5,\;COD_{Mn},\;COD_{Cr}$, TN, TP were estimated. To represent the respective industries, three companies were carefully selected based on its manufacturing goods, flowrate and location at various unit operations and processes. More than 90% of decrease in unit mass estimation between influent and effluent of BOD was observed. But the values themselves were similar to those of Fiber Manufacturing facility due to the high loadings of organic matter. Biodegradability of influent was almost three times higher than that of effluent. Unit mass discharge estimations of unit process (estimated in this study) based on space, products and raw material were similar to those of composite process (estimated by National Institute of Environmental Research), while big difference was observed in the other factors. Unit mass discharge factors calculated in this study can be used as the reference for the estimation of water pollution loading costs in Nakdong river basin. For the effective water pollution control and management, it is essential to characterize the various types of water quality parameters from the effluents of individual industrial wastewater treatment plants.

A Study on Process Improvement for Reduction of Pollution Loading Rate in Small Individual Sewage Plant (소규모 개인하수처리시설의 MBR공정 적용에 관한 연구)

  • Eom, Han Ki;Choi, Yoo Hyun;Joo, Hyun Jong
    • Journal of Environmental Science International
    • /
    • v.25 no.2
    • /
    • pp.323-329
    • /
    • 2016
  • In this study, the applicability of MBR process was evaluated to improve processing of personal sewage treatment facilities of $50m^3/day$ or less. As result of the research, stable discharge water quality could be secured as result of the MBR effector operation according to rate of inflow and inflow load and treatment efficiency of 98% or higher was shown by the membrane filtering method operation for SS, $BOD_5$. it was found that high treatment efficiency of 99% or higher. It is judged that detention time can be designed until 6.9 hr when applying MBR process on personal sewage treatment facilities with high pollution load and that cutback of pollution load can be possible through this study. It was shown that MBR process application reduces an annual cost of 4,829,600 won based on the basic unit calculation results and solves burden of amount of borne by causers according to excess of discharge water quality standards.

The Effect of Sludge Settleability on the Performance of DNR Process (슬러지 침전성이 DNR 공정에 미치는 영향 평가)

  • Suhl, Chang-Won;Lan, Thi Nguyen;Jeong, Hyeong-Seok;Lee, Sang-Min;Lee, Eui-Sin;Shin, Hang-Sik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.2
    • /
    • pp.273-280
    • /
    • 2006
  • The sludge settleability is a key factor for operating activated sludge process as well as BNR (biological nutrient removal) process, because the poor sludge settling causes an increase of suspended solid in the effluent. In order to improving the sludge settleability, a settling agent such as iron dust can be applied. In this study, the effect of sludge settleability on the performance of DNR (Daewoo nutrient removal) process was investigated with GPS-X, which is the popular wastewater treatment process model program, and the result of modeling was verified with operating lab-scale DNR process. As a result, if the sludge blanket keeps stable in the secondary settling tank, the effluent quality is similar in spite of different SVI values. And in case of the good sludge settleability, short HRT or long SRT increased the biomass concentration in the bioreactor, and improved the pollutant removal efficiency. In spite of daily influent changing, the good sludge settleability also guaranteed the stable effluent quality. And the results of the lab-scale DNR process experiment could support the simulated results.