• Title/Summary/Keyword: Inflow conditions

Search Result 408, Processing Time 0.026 seconds

Numerical calculation of the wind action on buildings using Eurocode 1 atmospheric boundary layer velocity profiles

  • Lopes, M.F.P.;Paixao Conde, J.M.;Gomes, M. Gloria;Ferreira, J.G.
    • Wind and Structures
    • /
    • v.13 no.6
    • /
    • pp.487-498
    • /
    • 2010
  • When designing structures to the wind action, the variation of the mean wind velocity and turbulence parameters with the height above the ground must be taken into account. This paper presents the numerical simulation results of atmospheric boundary layer (ABL) airflows, in a numerical domain with no obstacles and with a cubic building. The results of the flow characterization, obtained with the FLUENT CFD code were performed using the ${\kappa}-{\varepsilon}$ turbulence model with the MMK modification. The mean velocity and turbulence intensity profiles in the inflow boundary were defined in accordance with the Eurocode 1.4, for different conditions of aerodynamic roughness. The maintenance of the velocity and turbulence characteristics along the domain were evaluated in an empty domain for uniform incident flow and the ABL Eurocode velocity profiles. The pressure coefficients on a cubic building were calculated using these inflow conditions.

Evaluation of hydropower dam water supply capacity (II): estimation of water supply yield range of hydropower dams considering probabilistic inflow (발전용댐 이수능력 평가 연구(II): 확률론적 유입량을 고려한 발전용댐 용수공급능력 범위 산정)

  • Jeong, Gimoon;Kang, Doosun;Kim, Dong Hyun;Lee, Seung Oh;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.515-529
    • /
    • 2022
  • Identifying the available water resources amount is an essential process in establishing a sustainable water resources management plan. Dam facility is a major infrastructure storing and supplying water during the dry season, and the water supply yield of the dam varies depending on dam inflow conditions or operation rule. In South Korea, water supply yield of dam is calculated by reservoir simulation based on observed historical dam inflow data. However, the water supply capacity of a dam can be underestimated or overestimated depending on the existence of historical drought events during the simulation period. In this study, probabilistic inflow data was generated and used to estimate the appropriate range of the water supply yield of hydropower dams. That is, a method for estimating the probabilistic dam inflow that fluctuates according to climatic and socio-economic conditions and the range of water supply yield for hydropower dams was presented, and applied to hydropower dams located in the Han river in South Korea. It is expected that the understanding water supply yield of the hydropower dams will become more important to respond to climate change in the future, and this study will contribute to national water resources management planning by providing potential range of water supply yield of hydropower dams.

The development of a preliminary designing program for ORC radial inflow turbines and the design of the radial inflow turbine for the OTEC (ORC 반경류터빈의 예비설계프로그램 개발 및 OTEC용 반경류터빈의 설계)

  • Kim, Do-Yeop;Kang, Ho-Keun;Kim, You-Taek
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.3
    • /
    • pp.276-284
    • /
    • 2014
  • The purpose of this study is to establish the designing method of ORC(Organic Rankine Cycle) radial inflow turbines. RTDM(Radial Turbine Design Modeler) Ver.2.1 which is a preliminary design program of radial inflow turbines was developed to achieve this purpose. The 200kW-class radial inflow turbine for OTEC(Ocean Thermal Energy Conversion) was designed by using the RTDM Ver.2.1 and CFD(Computational Fluid Dynamics) simulation was performed to verify the accuracy of RTDM Ver.2.1. With the result of simulation, the accuracy of RTDM Ver.2.1 was almost 94.6% based on the designed total enthalpy drop of the radial inflow turbine. Strategy of adjusting the mass flow rate was adopted on this study to satisfy the requirements of its power and rotor outlet's conditions for the designed radial inflow turbine. The mass flow rate was consequently increased to 21.2 kg/s for the designed 200kW-class radial inflow turbine for OTEC, and then Total to total and Total to static efficiency are 89.8% and 85.36% respectively.

Analysis of Proper Linked Treatment Load Using GPS-X Simulation (GPS-X 시뮬레이션을 이용한 적정 연계처리부하량 분석)

  • Kim, Sungji;Lee, Jiwon;Gil, Kyungik
    • Journal of Wetlands Research
    • /
    • v.21 no.3
    • /
    • pp.244-250
    • /
    • 2019
  • Due to the industrial development and population growth, it has recently been shown that there are many problems caused by the rinked treatment water in local goverments and sewage treatment plants. The rinked treatment water has a characteristic of low flow rate and high concentration unlike general sewage. These characteristics increase sewage treatment difficulty and sewage treatment fee of sewage treatment facilities. Among the many influencing factors that increase sewage treatment unit cost, 'linked treatment load/design inflow load (%)' was derived as the most correlated factor. Through the selection and modeling of sewage treatment plants, the excess scope of design discharge water quality was investigated under the conditions of temperature and the conditions of 'linked treatment load/design inflow load (%)' taking into account the effects of the four seasons. The study found that for TN, 'linked treatment load/design inflow load (%)' was 19.7%, 22.6%, 25.1%and 27.7%, respectively, under conditions of $5^{\circ}C$, $10^{\circ}C$, $20^{\circ}C$ and $25^{\circ}C$. In case of TP, 'rinked treatment load/design inflow load (%)' was 10.7%, 12.2%, 15.6% and 17.5% at $5^{\circ}C$, $10^{\circ}C$, $20^{\circ}C$, and $25^{\circ}C$, respectively, under conditions of $5^{\circ}C$, $10^{\circ}C$, $20^{\circ}C$ and $25^{\circ}C$.

Development of Reservoir Operating Rule Using Explicit Stochastic Dynamic Programming (양해 추계학적 동적계획기법에 의한 저수지 운영률 개발)

  • Go, Seok-Gu;Lee, Gwang-Man;Lee, Han-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.3
    • /
    • pp.269-278
    • /
    • 1997
  • Operating rules, the basic principle of reservoir operation, are mostly developed from maximum or minimum, mean inflow series so that those rules cannot be used in practical operating situations to estimate the expected benefits or provide the operating policies for uncertainty conditions. Many operating rules based on the deterministic method that considers all operation variables including inflows as known variables can not reflect to uncertainties of inflow variations. Explicit operating rules can be developed for improving the weakness. In this method, stochastic trend of inflow series, one of the reservoir operation variables, can be directly method, the stochastic technique was applied to develop reservoir operating rule. In this study, stochastic dynamic programming using the concepts was applied to develop optimal operating rule for the Chungju reservoir system. The developed operating rules are regarded as a practical usage because the operating policy is following up the basic concept of Lag-1 Markov except for flood season. This method can provide reservoir operating rule using the previous stage's inflow and the current stage's beginning storage when the current stage's inflow cannot be predicted properly.

  • PDF

Dynamics of Water Environmental Factors and Phytoplankton Before and After Inflow of Seawater in Shingwa Reservoir (시화호에서 해수유입 전.후의 수환경 요인과 식물플랑크톤 동태)

  • 신재기;김동섭;조경제
    • Journal of Environmental Science International
    • /
    • v.9 no.2
    • /
    • pp.115-123
    • /
    • 2000
  • The dynamics of water quality and phytoplankton population had examined by monthly sampling from the upper to the lower part of watergate in an artificial Shihwa Reservoir in which situated near newly cities and incustrial complex on the west coast of Korea from January 1997 to December 1998. Among environmental factors, yearly average concentration of chl-a, TN and TP seemed to eutrophic or hypertrophic conditions that ranged 146.4~245.8 $\mu\textrm{g}$/$\ell$, 1.6~2.7 mg N/$\ell$, 258~448 $\mu\textrm{g}$ P/$\ell$, 26.9~80.7 $\mu\textrm{g}$/$\ell$, 1.0~2.4 mgN/$\ell$ and 74~239 $\mu\textrm{g}$P/$\ell$ respectively. Water quality was extremely deteriorated to consistently accumulation into inner reservoir by load of pollutants from autochthonous and allochthonous until early July 1997 after embankment. Water pollution of Shihwa Reservoir was remarkble on the biological condition with largely persistent bloom of phytoplankton and increase rate of standing crops was 2.4/yr. The development trend of phytoplankton in water ecosystem were closely related to increse and decrease of physico-chemical factors and those scale seemed to control by nutrient contents. Inflow of seawater into reservoir to object of repair of water quality. As to see dominant species, composition of those composed to mostly freshwater algae before inflow of seawater such as Selenastrum capricornutum of green algae, cyclotella atomus, C. meneghiniana of diatom and Microcystis spp. of blue-green algae and the other hand brackish algae were dominated after inflow of seawater such as Chaetoceros dicipiens, Skeletonema costatum of diatom, Dinophysis acuminata, Gymnodinium mikimotoi, G. sanguineum, Gyrodinium spirale, Prorocentrum minmum of dinoflagellate and Eutreptiella gymnastica of euglenoid. Moreover, small flagellates including Chroomonas spp. of cryptomonad were abundant throughout the year. The cause of water deterioration during fill of the freshwater were complexly supported with extra and intra parameters. The variation pattern of phytoplankton were related to water temperature and salinity by inflow of seawater based to plentiful nutrients. The dynamics of phytoplankton were assessed to ecosystem that clearly condition of dominant by unique or a few angel species seasonally.

  • PDF

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

Temperature Effect on the Nutrient Removal in the Combined Biological Nutrient Removal System (CBNR) with Anaerobic-Intermittent Aerobic-Modified Oxic Reactors (혐기조-간헐포기조-개량조로 구성된 영양소 제거 공정에서 온도의 영향)

  • Kang, Young-Hee;Han, Gee-Bong
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.4
    • /
    • pp.639-647
    • /
    • 2006
  • The temperature effect at $20^{\circ}$ and $10^{\circ}$ on the nutrient removal efficiency was evaluated in the combined biological nutrient removal system (CBNR) with anaerobic-intermittent aerobic-oxic reactors. The test was conducted under the conditions of various ratios of intermittent aeration time and distribution of influent raw water to CBNR. The removal efficiencies of organics, nitrogen and phosphorus were a little bit better at $20^{\circ}$ than at $10^{\circ}$. However the large difference of temperature effect on the nutrient removal efficiency between $20^{\circ}$ and $10^{\circ}$ was not appeared because of highly sustained MLSS concentrations in the reactors and controlled intermittent aeration time. In the removal of phosphorus, Mode III (50/70 min in aeration on/off time, 3 times of intermittent aeration) showed more effective compared with short aeration time of Mode IV. In case of N, P removal, the denitrification rate was lower in Mode A with splitted inflow into anaerobic and intermittent aeration basins than in Mode B with sole inflow into anaerobic basin.

A Study of Design Conditions for Decision Area of Constructed Wetland to treat Nonpoint Source Pollution from Agricultural Area (농촌유역 비점오염원처리를 위한 적정 인공습지 규모결정에 관한 연구(지역환경 \circled1))

  • 장정렬;박종민;권순국;윤경섭
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.490-499
    • /
    • 2000
  • Several studies on development of water quality treatment systems by wetlands are on going because of their benefits of low construction cost and high efficiency of waste water treatment. The objectives of this study were to review the necessary contents of survey and design factors for constructing constructed wetlands and to examine the required wetland area to treat non-point source pollution through case studies. The measurement of water quality and quantity in precipitation period is needed to analyse the inflow characteristics of the non-point pollution and to determine the amount of design flow. The design inflow for constructing constructed wetland was determined to the total runoff from 30mm of daily rainfall in the AMC(III) condition of the SCS method and is similar 70% of the annual mean runoff. The natural type wetland system with 0.1m of water depth and 5 hours of detention time was applied. From the results of the case studies, 70% of inflow could be treated and 1∼3% of wetland area of the total basin is needed.

  • PDF

A large eddy simulation on the effect of buildings on urban flows

  • Zhang, Ning;Jiang, Weimei;Miao, Shiguang
    • Wind and Structures
    • /
    • v.9 no.1
    • /
    • pp.23-35
    • /
    • 2006
  • The effect of buildings on flow in urban canopy is one of the most important problems in local/micro-scale meteorology. A large eddy simulation model is used to simulate the flow structure in an urban neighborhood and the bulk effect of the buildings on surrounding flows is analyzed. The results demonstrate that: (a) The inflow conditions affect the detailed flow characteristics much in the building group, including: the distortion or disappearance of the wake vortexes, the change of funneling effect area and the change of location, size of the static-wind area. (b) The bulk effect of the buildings leads to a loss of wind speed in the low layer where height is less than four times of the average building height, and this loss effect changes little when the inflow direction changes. (c) In the bulk effect to environmental fields, the change of inflow direction affects the vertical distribution of turbulence greatly. The peak value of the turbulence energy appears at the height of the average building height. The attribution of fluctuations of different components to turbulence changes greatly at different height levels, in the low levels the horizontal speed fluctuation attribute mostly, while the vertical speed fluctuation does in high levels.