• Title/Summary/Keyword: Industrialization Construction

Search Result 169, Processing Time 0.021 seconds

An application of integrated water cycle system in U-City (도시 용수 통합관리 방안 연구)

  • Jung, Jin-Hong;Choi, Gye-Woon;Oh, Hyun-Je
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6597-6601
    • /
    • 2013
  • This study aims at suggesting a evaluation method of water cycle soundness in U-City. The distortion of water cycle soundness induced industrialization and urbanization was quantitatively analyzed. In order to evaluate the soundness of water cycle in U-City the reduction ratio of runoff was evaluated in comparison of before the construction of the water recycling facilities for natural water cycle, the reduction ratio of urban water was evaluated in comparison of before the introduction of the artificial recycling facilities for artificial water cycle.

The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facliity (하수처리시설의 효율적인 VE수행을 위한 다단계성능평가 분석)

  • Kim, Dongjin;Park, Jaeil;Lee, Jaehun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.40-47
    • /
    • 2016
  • Recently, the demand of sewage treatment facilities have increased by growing the population growth of city and industrialization. However, most of public sewage treatment facilities lack the preparations of design criteria by increasing sewage water amount in the future. In order to respond to this situation, the government has consistently promoted the sewage treatment construction project. This study conducted a survey targeting residents and sewage treatment facilities, civil engineering a VE project professionals for effectively operating the sewage treatment facilities and improving its value to be built in the future. Based on this survey, this study will introduce the list of performance measurements which can not only save cost but also reflect opinion of users and residents. In addition, using Multi-Level Performance Measurement and AHP analyzed the weights of performance measurement which is more objective than existing things for applying efficient VE process

A Comparative Experimental Study on Thermal Performance of Box-typed Double Skin and Curtain Wall in Cooling Period (박스형 이중외피와 커튼월의 냉방기 열적성능에 관한 비교실험 연구)

  • Park, Chang-Young;Lee, Keon-Ho;Yoon, Yong-Sang;Choi, Chang-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.2
    • /
    • pp.111-119
    • /
    • 2007
  • The annual mean temperature of South Korea has risen by $1.3^{\circ}C$ for last 100 years by urbanization and industrialization. Especially, the frequency of unusual hot weather in summer increases for a long time and the frequency of unusual cold weather in winter clearly decreases. In recently, The considerable portion of curtain wall system is appled to building skin in domestic. As related to this, the Korea Institute of Construction Technology devised the box typed double skin facade(It is occasionally called as FDFS : Functional Double Facade System) as an alternative that reflects the distinctive local climate and saves cooling energy. Two mock-ups($49m^*4.9m$) applied to single skin(curtain wall) and double skin each were monitored under the outdoor condition. Therefore, the characteristics of natural ventilation and cooling energy consumption of each window had been analyzed in real time. The results of this study are summarized as follow, Analysis of the experiment on an air conditioner: the indoor temperature of the chamber with FDFS is lower than that of the chamber with single skin facades by $3{\sim}6$ degrees(C). A temperature variation of about $1{\sim}2$ degrees between the 0.2m and 1.7m height of the mock-up occurs in FDFS, while that of about maximum 7 degrees occurs in single skin facade at noon with abundant intensity of solar accident. Also, 67 percent of energy consumption for air conditioning has been saved.

Big Data Platform Construction and Application for Smart City Development (스마트 시티의 발전을 위한 빅데이터 플랫폼 구축과 적용)

  • Moon, Seung Hyeog
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.529-534
    • /
    • 2020
  • The development of civilization is in line with evolution of cities and transportation technology caused by industrialization. Up to now, a city has been developed owing to transportation cost reduction and needs for land utilization as a limited core business district. Continuous increase of urban population density has accompanied by lots of problems socioeconomically such as rise of land value, traffic congestion, gap between the rich and poor, air pollution, etc. Those issues are difficult to be solved in existing city ecosystem. However, a clue for solving the problems could be found in there. The design of Seoul mid-night bus route was from analysis of movement of people in the rural area by using ICT so that a city ecosystem should be firstly analyzed for solving rural issues. If the cause of those is found, big data platform construction is required to raise the life quality of citizen and the problems could be solved. Big data should be located in the middle of the platform connected with every element of city based on ICT for real-time collection, analysis and application. This paper addresses construction of big data platform and its application for sustainable smart city.

A Study on the Efficient Integration Program between ISO 9000 and ISO 14000 (ISO 9000과 ISO 14000의 효율적인 통합방안에 관한 연구-건설업체 문서체계를 중심으로)

  • 이재훈;강창욱
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.211-218
    • /
    • 1997
  • Since Industrial Revolution, the sudden industrialization and population explosion have brought about a serious environmental pollution on the air of the earth, the quality of water and the soil, and the greenhouse effect by the destruction of the ozone layer and the greenhouse gas, the organism diversity decline, the desertification by the ruining of woods and the overall global environmental pollution such as the contamination of the ocean and rivers have been come to the front. So the new recognition on the environment is being spreaded in construction business and the efforts for certification acquisition of ISO 14000 being followed by ISO 9000 are progressing, Accordingly, with an example of H Company where integration system is built so that it can minimize the efforts and cost at the construction of the management system, operation and management after the fact, this paper shall suggest the practical scheme of 3 steps through a study to integrate both existing quality management system and new environmental management system. As the integration system of the quality and environment which is constructed by this method is executed, the number of the established and managed document is cut by about a third and so the disorder to encounter between these documents is prevented and unnecessary efforts is reduced in constructing a system, consequently the efficiency of the system is accomplished. Also as the dualization of quality management system and environmental management system additionally needs more men and money after certification acquisition, the non-construction of the integration system may give rise to a cause to aggravate the burden of the company and hereafter when a new system is imported, it may be very difficult to integrate the system. This system integration enables a efficient and effective system to be constructed , operated , and managed after the fact.

  • PDF

Experimental Study on the Corrosion Behavior of Al Coatings Applied by Plasma Thermal Arc Spray under Simulated Environmental Conditions (모사 부식 환경에서 플라즈마 아크용사에 의한 Al 코팅의 부식특성에 관한 실험적 연구)

  • Jeong, Hwa-Rang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.559-570
    • /
    • 2023
  • The corrosion of structural steel used in the construction industry is increasing due to the industrialization where many aggressive ions released in the atmosphere. Therefore, in the present study Al coating was deposited by arc and plasma arc thermal spray process and compared their effectiveness in simulated weathering condition i.e. Society of Automotive Engineers(SAE) J2334 solution which mostly contain Cl- and CO32- ions. Different analytical techniques have been used to characterize the coating and draw the corrosion mechanism. The Al coating deposited by plasma arc thermal spray process exhibited uniform, dense and layer by layer deposition resulting higher bond adhesion values. The open circuit potential(OCP) of Al coating deposited this process is exhibited more electropositive values than arc thermal spray process in SAE J2334 solution with immersion periods. The total impedance of plasma arc thermal spray process exhibited higher than arc thermal spray process. The corrosion rate of the plasma arc thermal sprayed Al coating is reduced by 20% compared to arc thermal spray process after 23 days of immersion in SAE J2334 solution.

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.

  • PDF

Technology Valuation Evaluation Model of Decision Making System using Income Approach for Commercialization in LNG Plant Construction (수익접근법을 활용한 LNG 플랜트공사의 의사결정지원시스템 기술가치 평가)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.58-67
    • /
    • 2014
  • The proportion of investment in national R&D projects in construction and transportation has been increasing continuously; in terms of the size of R&D projects, there are many medium- to large-sized projects of over KRW 10 billion. However, in spite of such continuous increase in R&D investments, there are many technologies developed but not commercialized, i.e., the quiescence of technology. Accordingly, it is necessary to link the R&D results to commercialization by expanding the scope of R&D projects. In this context, this study presented objective reference prices to be used in contracting/transacting technology and implementing commercialization strategy by conducting technology valuations against on-going research projects with earnings approach, and by estimating value of patented technology. Sum of free cash flow (business value) that can be generated during the life of the technology was estimated as KRW 512 million by reflecting a discount rate of 16.34% to convert it into the present value. In addition, the technology value was computed as KRW 227million by applying a technology factor of 44.39% to the above value. Based on the technology value estimated in this way, it is necessary to establish industrialization and commercialization strategy of the technology.

A Study on the Application and Assessment of Urban River Restoration in the Anyang River (안양천 도시하천 복원의 실행과 평가에 관한 연구)

  • Lee, Sam-Hee;Choi, Jung-Kwon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.1
    • /
    • pp.1-8
    • /
    • 2007
  • The Anyang River which located in an urban area near Seoul had been managed focusing on supplying home and industrial water and preventing floods, coping with rapid industrialization and urbanization. Consequently, it was changed into a deadly river during 25 years. Its channel was straightened by concrete and water quality deteriorated to BOD 190mg/l. In addition, water quantity has been rapidly decreased and has been drying up. Also, as the river ecosystem, landscape, water-friendly function, and so forth were seriously deteriorated, people turn away from the urban river. From 2001, the master plan under the 10-year has been actively carried out centering on the preceding items, which are healthy river in which fishes inhabit, safe river free from floods and droughts, and pleasant river where citizens visit. As a result, its water quality was remarkably improved by BOD 5mg/l in 2005 and some upper zones were improved enough to allow people to swim. Moreover, various animals including fish and birds gather around the river. Now, the 'Anyang River Restoration Project' is recognized as the first comprehensive and systematic nature-friendly urban river improvement in Korea.

A Study of Integrated Community Welfare Facilities Planning for the Elderly - Focused on the case in Germany - (고령자를 위한 지역 통합적 복지시설 계획 - 독일의 사례를 중심으로 -)

  • Nam, Yun-Ok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.4 no.7
    • /
    • pp.75-84
    • /
    • 1998
  • Like all other European countries, as a result of gradual industrialization, Germany is just before the start of new social system; the so-called 'aged society'. Over half of the century, Germany focused their welfare system on facilities. However, with the start of the new 'aged society', they introduced a new concept which consists mainly on home care and community care. These new concepts resulted from the general idea that even elderly have the right to live an independent quality life. Therefore, to satisfy the elderly with such life it has been seen as necessary not only to offer them efficient protection but to introduce an economical welfare system and facility scheme. The regional integration plan for welfare is one of the open schemes in which the lifestyle of the elderly are seen as the whole. Participated by several members and specialists of all social standings, necessary facilities are planned. By looking into a project example carried out in Germany, this study is aimed to increase the quality of the elderly welfare system and facility construction plan.

  • PDF