• Title/Summary/Keyword: Industrial Inspection

Search Result 865, Processing Time 0.026 seconds

Analysis of an Inspection Process Allowing Consecutive Two-time Testing of Products Using Markov Chains (연속되는 이중 검사를 허용하는 제품품질검사 프로세스에 대한 마르코프 체인을 이용한 분석)

  • Ko, Jeong-Han
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.6
    • /
    • pp.2452-2457
    • /
    • 2012
  • When a quality inspection process rejects a product unit, consecutive repeated inspections are sometimes conducted for the rejected unit to reduce a false reject possibility. This paper analyzes a special inspection process that allows up to two times of consecutive testing for each product to decrease type I inspection errors. This study uses a Markov chain to model the steps of the inspection process and a product unit's quality states during inspection. Historical inspection results from a company are used as the data for the Markov chain model. Using the Markov chain model and data, this study analyzes the effect of this special inspection rule on the proportion of the final quality levels and scrap rate. The results demonstrate that this inspection process of possible double testing could help reduce unnecessary rejects and consequently decrease material and production costs.

Development of a Inspection System for Automotive Part (자동차 부품 누락 방지를 위한 자동 선별 시스템)

  • Shin, Seok-Woo;Lee, Jong-Hun;Park, Sang-Heup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.756-760
    • /
    • 2017
  • Meeting the growing demand deadlines, reducing the production cost and upgrading the quality control measurements are the reasons why the automotive part manufacturers are venturing into automation. Attaining these objectives is impossible with human inspection for many reasons. Accordingly, the introduction of inspection system purposely for door hinge bracket inspection is presented in this study as an alternative for human inspection. This proposal is designed to meet the demands, features and specifications of door hinge bracket manufacturing companies in striving for increased throughput of better quality. To improve demerits of this manual operation, inspection system is introduced. As the inspection algorithm, template matching algorithm is applied to distinguish the articles of good quality and the poorly made articles. Through the verification test of the inspection process algorithm and the similarity metric matching algorithm, the detection accuracy was 98%, and it was applied to the production site to contribute to the improvement of the productivity due to the decrease of the defective product.

Design of Complete Inspection Procedures Using the Performance and Screening Variables (주품질특성 및 대용특성을 활용한 전수검사의 설계)

  • Hong, Sung-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.2
    • /
    • pp.279-285
    • /
    • 1998
  • A quality inspection procedure interchangeably using the performance and screening variables is proposed. At the start of the inspection, the performance variable is measured for all items. As soon as i consecutive items are found to be free of defects, the screening variable is measured instead of the performance variable. If an item is rejected, the inspection based on the performance variable is resumed. All nonconforming items found in the inspection are either reworked or replaced with conforming items. It is assumed that the performance variable is dichotomous, and the screening variable given the performance variable is normally distributed with known mean and variance. The average outgoing quality (AOQ) expression is derived, and the methods of finding the inspection procedure with a specified average outgoing quality limit (AOQL) are presented.

  • PDF

Decision-making Method of Optimum Inspection Interval for Plant Maintenance by Genetic Algorithms (유전 알고리즘에 의한 플랜트 보전을 위한 최적검사기간 결정 방법론)

  • 서광규;서지한
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.1-8
    • /
    • 2003
  • The operation and management of a plant require proper accounting for the constraints coming from reliability requirements as well as from budget and resource considerations. Most of the mathematical methods to decide the inspection time interval for plant maintenance by reliability theory are too complicated to be solved. Moreover, the mathematical and theoretical models are not usually cases in the practical applications. In order to overcome these problems, we propose a new the decision-making method of optimal inspection interval to minimize the maintenance cost by reliability theory and genetic algorithm (GA). The most merit of the proposed method is to decide the inspection interval for a plant machine of which failure rate $\lambda$(t) conforms to any probability distribution. Therefore, this method is more practical. The efficiency of the proposed method is verified by comparing the results obtained by GA-based method with the inspection model haying regular time interval.

A Study on Algorithm for Inspection of Automobile's plastic part locking lever (자동차 플라스틱 부품 락킹레버 검사를 위한 알고리즘 연구)

  • Jang, Bong-Choon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.5
    • /
    • pp.1558-1563
    • /
    • 2010
  • This paper describes a study on algorithm for the development of machine vision system as well as the inspection of automobile's plastic part locking lever to replace a human worker's eye inspection. Before developing the machine vision system based on the PC, the purpose of this research is to develop the algorithm to decide whether a product is a good/bad one in real time inspection. NI-LabVIEW software is used in the inspection method and an inspection program is developed using LabVIEW Vision image functions. The inspection program was built and validated to help the system operator set up the inspection area and change the criteria number in the program.

A Survey on Endocrine Disruptors among Agricultural Products in the North of Seoul

  • Kim Yang-Suk;Lee Sung-Duk;Kim Soo-Jin;Baek Soo-hyun
    • Proceedings of the Korean Society of Food Hygiene and Safety Conference
    • /
    • 2001.10a
    • /
    • pp.120-122
    • /
    • 2001
  • This study was carried out to monitor suspected endocrine disrupting pesticides and industrial organic chemicals among circulated agricultural products in the north area of Seoul in 2001. Procymidone, vinclozolin, endosulfan, chlorothalonil, chloropyrifos and pendimetaline (pesticides) and butylated hydroxytoluene(industrial organic chemicals) were certified by GC-MS. Detected 6 pesticides were remained mostly in the green vegetables, spices and wild plants with $3\%$ detected. Butylated hydroxytoluene(industrial organic chemicals) used for green house cover stuffs was contained mostly in the green vegetables, spices and wild plants not in the fruits and cereals with $43\%$ detected. In the same agricultural products containing butylated hydroxy toluene showed same detection tendency with remaining endocrine disrupting pesticides.

  • PDF

Development of A Lot Quality Assurance and Inspection Cost Estimation System for Process-Centered Inspections (공정 중심의 검사 방식에 대한 로트 품질보증 및 검사비용 추정 시스템 개발)

  • Lee, Do-Kyung;Lee, Seung-Woo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.1
    • /
    • pp.34-40
    • /
    • 2006
  • Many producers put sampling inspection policy into the way of their convenience. Examples of the convenience are irregular lot size and too small sample size. Because they don't use a standard sampling inspection policy, they can not guarantee the quality level of their products. In this study, we developed a user-centered design program which can calculate the AOQL of their products to their buyers in the case of irregular lot size and too small sample size. Also this program propose a linear inspection cost by Hald's model.

Design of a Continuous Screening Procedure in the Bivariate Normal Model (이변량 정규모형 하에서 연속생산형 스크리닝 절차의 설계)

  • Hong, Sung Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.31 no.2
    • /
    • pp.99-105
    • /
    • 2005
  • A quality inspection procedure interchangeably using the performance and surrogate variables is proposed. At the start of the inspection, the continuous performance variable is measured for all items. As soon as iconsecutive items are found to be conforming, the continuous surrogate variable is measured instead of the performance variable. If an item is rejected, the inspection based on the performance variable is resumed. It is assumed that the performance variable and the surrogate variable are jointly normally distributed with known means and standard deviations. The average outgoing quality (AOQ) expression is derived, and the methods of finding the inspection procedure with a specified average outgoing quality limit (AOQL) are presented.

An Algorithm for Determining Double Rectifying Inspection Plans (선별형 2회 샘플링 검사방식의 최적설계를 위한 알고리즘 개발)

  • Kang, Bo-Chul;Cho, Jai-Rip
    • Journal of Korean Society for Quality Management
    • /
    • v.24 no.4
    • /
    • pp.207-223
    • /
    • 1996
  • These days, customers have attached great importance to the function of product liability and quality assurance. In Korea, the single rectifying sampling inspection for attribute (KS A 3105) has been used. But this inspection plan given by tables (KS A 3105) has some defects. There are limitations in the range of applications and irrationality of approximate probability and the double rectifying sampling inspection is not mentioned. Moreover, ATI (average total inspection) does not reflect sampling costs and the loss of nonconforming item. Therefore, the objectives of this study is to develope new algorithms and computer program that provide the optimal sampling inspection plan based on minimum linear costs (single & double inspection plan). The result of this study revealed that the new algorithm is less than KS A 3105 in ATI and basically, double inspection plan is more economical. Also it comes over restrictions in KS A 3105. So, it is definite that the optimal solution can be obtained considering cost factors in manufacturing and sampling process, and costs can be saved in the long term.

  • PDF

Variable Sampling Inspection with Screening When Lot Quality Follows Mixed Normal Distribution

  • Suzuki, Yuichiro;Takemoto, Yasuhiko;Arizono, Ikuo
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.3
    • /
    • pp.131-138
    • /
    • 2009
  • The variable sampling inspection scheme with screening for the purpose of assuring the upper limit of maximum expected surplus loss after inspection has been proposed. In this inspection scheme, it has been assumed that a product lot consists of products manufactured through a single production line and lot quality characteristics follow a normal distribution. In the previous literature with respect to inspection schemes, it has been commonly assumed that lot quality characteristics obey a single normal distribution under the condition that all products are manufactured in the same condition. On the other hand, the production line is designed in order that the workload of respective processes becomes uniform from the viewpoint of line balancing. One of the solutions for the bottleneck process is to arrange the workshops in parallel. The lot quality characteristics from such a production line with the process consisting of some parallel workshops might not follow strictly the single normal distribution. Therefore, we expand an applicable scope of the above mentioned variable sampling inspection scheme with screening in this article. Concretely, we consider the variable sampling inspection with screening for the purpose of assuring the upper limit of average outgoing surplus quality loss in the production lots when the lot quality follows the mixed normal distribution.