• Title/Summary/Keyword: Individual Model Construction

Search Result 231, Processing Time 0.028 seconds

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

Bear Theme Park Design ('곰' 주제공원 조경설계)

  • Woo Jung-Sang
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.3 s.110
    • /
    • pp.105-113
    • /
    • 2005
  • Human desire is required to be changed variously as time flows. A theme park which is planned to male a good memory including a variety of story, drama, and experience with one of themes is increasingly and currently broaden to be a good economic value of cultural tourism for the local autonomy institution or individual business. The plan for a theme park should be developed to give the tourist satisfaction at studious and ecology educational needs in conformity with our country's distinctive four seasons, its surrounding environment, facilities, and its contents. This design which is called 'Bear theme park' has only one theme focused on a combined effort with a landscape designer and a sculptor. It is estimated that the park must be our country's unique model of a theme park The purpose of this study is to request the designer's direct construction to participate in it by themselves, to solve any problems on the design side, to experience the real construction procedure, and to take the designer's techniques, and skills as soon as the design completed.

Development of HVAC System to Lower the Conveyance Energy and Building Height

  • Kim, Jung-Yup;Shin, Hyun-Joon
    • International Journal of Air-Conditioning and Refrigeration
    • /
    • v.13 no.1
    • /
    • pp.31-43
    • /
    • 2005
  • The new HVAC system is developed to lower the conveyance energy and building height using IAV(Increasing Air Volume) technique. IAV units which are equipped in each zone carry out air-conditioning and supply fresh air by induction of outdoor air in main duct. The design program which decides size of OAHU and IAV unit according to air conditioning load and fresh air demand of each zone is presented. The control system is developed to operate efficiently HVAC system and IAV unit, so that individual zone operation and well-deal with partial load and IAQ problem are possible. The new system is investigated in model building and makes more profit in conveyance energy. size of air conditioning facilities room and building height than VAV system. But in construction cost it is worse by about 15 percentage.

Analysis of Influence Factors on the Intention to Use Personal Cloud Computing (개인용 클라우드 컴퓨팅 사용에 미치는 영향요인 분석)

  • Ryu, Jae Hong;Moon, Hye Young;Choi, Jinho
    • Journal of Information Technology Services
    • /
    • v.12 no.4
    • /
    • pp.319-335
    • /
    • 2013
  • Cloud computing allows users to access software or specific programs that support the cloud platform through an information communicating device that can connect to the internet anywhere or anytime. Also, the cloud architecture not only reduces the expenses of IT infrastructure construction and maintenance, but also speeds up processing and mobility, which leads to a significant ease of use. In spite of the advantages of cloud computing, previous studies have been centered on case studies of the execution, advantages, and problems of cloud computing. In contrast, empirical research on individual cloud computing up till now is very insufficient. Thus, the research aims to create a model of an individual user's perspective and verify validation. This study reveals types of influence that characteristics can have on an individual user's intention to use, by searching the characteristics that the individual user recognizes on cloud computing services. The results are as follows:first, the characteristics of cloud computing indicates a significant influence on usage intention. Second, all characteristics in cloud computing, accessibility, reliability, perceived ease of use, and fusibility, are confirmed in providing significant influences in shaping social influence forms. Third, social influence has a significant influence on usage intention.

A Structural Approach for the Construction of the Open Instruction Model in Mathematics (열린 수학 수업 모델 구성을 위한 구조적 접근)

  • 백석윤
    • Journal of Educational Research in Mathematics
    • /
    • v.8 no.1
    • /
    • pp.101-123
    • /
    • 1998
  • The purpose of this study is to construct the "open" instructional model that might be used properly in mathematics classroom. In this study, the core philosophy of "openness" in mathematics instruction is looked upon as the transference itself from pursuing simply strengthening the function of instruction such as effectiveness in the management of educational environment into the understanding of the nature of mathematics learning and the pursuing of true effectiveness in mathematics learning. It means, in other words, this study is going to accept the "openness" as functional readiness to open all the possibility among the conditions of educational environment for the purpose of realizing maximum learning effectiveness. With considering these concepts, this study regards open mathematics education as simply one section among the spectrum of mathematics education, thus could be included in the category of mathematics education. The model for open instruction in mathematics classroom, constructed in this study, has the following virtues: This model (1) suggests integrated view of open mathematics instruction that could adjust the individual and sporadic views recently constructed about open mathematics instruction; (2) could suggest structural approach for the construction of open mathematics instruction program; (3) could be used in other way as a method for evaluation open mathematics instruction program.thematics instruction program.

  • PDF

A study of relevant model of information management system based on business process for embodying BPM on construction company (건설기업 BPM 구현을 위한 업무 프로세스 기반의 업무지원 시스템 연계모델에 관한 연구 -공정관리 업무 프로세스를 중심으로-)

  • Lee, Jung-Woo;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.13-27
    • /
    • 2009
  • Construction companies are trying to apply process management to their business to improve efficiency in business circumstance of high competition and globalization. Since 1990s, construction firms adopted process management to improve internal and external business structure based on process. It however has a few improvement functions. In addition, business support systems for business process efficiency improvement were developed, but separation between business process and IT system occurred because it focused on function-based individual construction and data input/output. To solve this problem, this study proposed business process and IT integration model for supporting user to use business information and system based on visualized business process and improving use of previous business support system. Business efficiency is expected to be improved with this model which based on integration required business condition(stakeholder, business data, functions of business supporting system). This study developved process model, architecture, and BPA of whole construction management business. According to BPA, it analyzed business process stakeholder, detail activities, and input-output data. And also it examined 12 main business supporting system of Korean construction firms. Based on analyzed data, this study developed business process supporting integration model based on business process through PDCA and CRUD analysis.

IDENTIFICATION OF SIGNIFICANT CRITERIA FOR SELECTION OF CONSTRUCTION PROJECT MANAGERS IN IRAN

  • Abbas Rashidi;Fateme Jazebi;Mohamad Hassan Sebt
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1564-1569
    • /
    • 2009
  • Project managers play a key role in cost, time, and quality of a project. Selection of an appropriate project manager, therefore, is considered as one of the most important decisions in any construction project. It should be noted that most important decision makings are carried out by the project manager throughout the project. Traditionally, project manager selection in construction companies in Iran is through organizing an interview with candidates and selecting the most appropriate choice in accordance with the capabilities, potentials and individual specifications coupled with the requirements of the project. In the same direction, organizing interview on selection of appropriate candidate is usually carried out by senior managers of companies. Determination of the most important criteria for selection of project managers and also identification of significance coefficient of each criterion can highly help senior managers of companies to make sound selection decisions. In this paper, a numerical model has been considered for determination of significance of each criterion, details of which are submitted for selection of project manager in Iranian petrochemical, oil and gas sector companies. For this reason, all criteria- considered by senior managers of the companies under study- are first determined. Then, information obtained through 38 interviews, conducted by senior managers of the mentioned companies while selecting project manager, is analyzed. Significant coefficient of each criterion is calculated through the accumulated data using fuzzy curves method.

  • PDF

MODELING THE TECHNOLOGY TRANSFER PROCESS IN THE THAI CONSTRUCTION INDUSTRY: A PILOT STUDY

  • Tanut Waroonkun;Rodney A. Stewart;Sherif Mohamed
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.845-848
    • /
    • 2005
  • Technology transfer (TT) has been defined as the shared responsibility between the source and the destination for ensuring that technology is accepted and at least understood by someone with the knowledge and resources to apply and/or use the technology. The adoption of TT in construction industries is necessary for economic growth to occur in developing countries such as Thailand. This process should provide numerous benefits for the host sector in areas such as increased productivity, enhancement of product quality, cost savings, improvements in market share and entry to new markets. However, there are many factors, which may impact on the TT process and its subsequent outcomes for Thai construction firms and individuals, including, the transfer environment, learning environment, transferor characteristics and transferee characteristics. The performance and interaction of these enablers will influence the degree of value added to the local construction sectors in areas such as economic advancement, knowledge advancement and project performance. This paper presents a conceptual framework for international TT that accommodates the numerous factors believed to impact on the processes effectiveness. Through a Pilot Study, where 27 industry professionals from Thailand were interviewed, the significant factors which impact on the TT process have been identified along with the strength of interrelationship between individual and groups of factors. Future research seeks to target a greater sample of respondents with the view to validate the conceptual model and apply it on a number of large Thai projects where international TT was incorporated into the project agreement.

  • PDF

DEVELOPMENT OF A GIS-BASED GEOTECHNICAL INFORMATION ENTRY SYSTEM USING THE GEOTECHNICAL INVESTIGATION RESULT FORM AND METADATA STANDARDIZATION

  • YongGu Jang;HoYun, Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1388-1395
    • /
    • 2009
  • In March 2007, Korea's Ministry of Construction & Transportation (MOCT) established "Guidelines on the Computerization and Use of Geotechnical Investigation Results," which took effect as official instructions. The 2007 Geotechnical Information DB Construction Project is underway as a model project for a stable geotechnical information distribution system based on the MOCT guidelines, accompanied by user education on the geotechnical data distribution system. This study introduces a geotechnical data entry system characterized by the standardization of the geotechnical investigation form, the standardization of metadata for creating the geotechnical data to be distributed, and the creation of borehole space data based on the world geodetic system according to the changes in the national coordinate system, to define a unified DB structure and the items for the geotechnical data entry system and to computerize the field geotechnical investigation results using the MOCT guidelines. In addition, the present operating status of the geotechnical data entry system and entry data processing statistics are introduced through an analysis of the model project, and the problems of the project are analyzed to suggest improvements. Education on, and the implementation of, the model project for the geotechnical data entry system, which was developed via the standardization of the geotechnical investigation results form and the metadata for institutions showed that most users can use the system easily. There were problems, however, including those related to the complexity of metadata creation, partial errors in moving to the borehole data window, partial recognition errors in the installation program for different computer operating systems, etc. Especially, the individual standard form usage and the specificity of the person who enters the geotechnical information for the Korea National Housing Corporation, among the institutions under MOCT, required partial improvement of the geotechnical data entry system. The problems surfaced from this study will be promptly addressed in the operation and management of the geotechnical data DB center in 2008.

  • PDF

A Study on the Changes of Flood Vulnerability in Urban Area Using One-Way Error Component Regression Model (One-Way Error Component Regression Model을 활용한 도시지역 수재해 취약성 변화의 실증연구)

  • Choi, Choong-Ik
    • Journal of Environmental Policy
    • /
    • v.3 no.2
    • /
    • pp.89-112
    • /
    • 2004
  • This Study aims to demonstrate how much flood vulnerability in urban area changed for the past 32 years by using the panel model. At the same time, this study strives to determine the primary factors and to construct an effective counter-plan by means of empirical research. After selecting research hypotheses based on considerations of issues concerning causes for urban flooding, their relevance is put to the test by conducting empirical research in individual case locations. This research verifies the four research hypotheses by using one-way error component regression model. In conclusion, this research has shown that urban land use and local characteristics act as significant flood determinants, with forests acting to reduce flood dangers. Moreover, constructing embankments can no longer represent a reliable flood control policy. The changes in future flood control policies need to incorporate local characteristics and to minimize natural destruction, so that humans and nature can coexist through environmentally friendly flood management policies.

  • PDF