• Title/Summary/Keyword: Index Maintenance

Search Result 582, Processing Time 0.028 seconds

Experimental investigation of effects of sand contamination on strain modulus of railway ballast

  • Kian, Ali R. Tolou;Zakeri, Jabbar A.;Sadeghi, Javad
    • Geomechanics and Engineering
    • /
    • v.14 no.6
    • /
    • pp.563-570
    • /
    • 2018
  • Ballast layer has an important role in vertical stiffness and stability of railway track. In most of the Middle East countries and some of the Asian ones, significant parts of railway lines pass through desert areas where the track (particularly ballast layer) is contaminated with sands. Despite considerable number of derailments reported in the sand contaminated tracks, there is a lack of sufficient studies on the influences of sand contamination on the ballast vertical stiffness as the main indicator of track stability. Addressing this limitation, the effects of sand contamination on the mechanical behavior of ballast were experimentally investigated. For this purpose, laboratory tests (plate load test) on ballast samples with different levels of sand contamination were carried out. The results obtained were analyzed leading to derive mathematical expressions for the strain modulus ($E_V$) as a function of the ballast level of contamination. The $E_V$ was used as an index for evaluation of the load-deformation characteristics and bearing capacity of track substructure. The critical limit of sand contamination, after which the $E_V$ of the ballast reduces drastically, was obtained. It was shown that the obtained research results improve the current track maintenance approach by providing key guides for the optimization of ballast maintenance planning (the timing of ballast cleaning or renewal).

Case Study on Deciding a Time for Repairing Asphalt Pavement of Incheon International Airport (인천국제공항 아스팔트 포장 보수시기 결정 사례 연구)

  • Lee, Jae-Ho;Kim, Jang-Rack;Mun, Hyung-Chul;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.49-60
    • /
    • 2013
  • PURPOSES : The evaluation of the pavement condition of the asphalt concrete pavement of No. 2 runway of Inchon International Airport through PMS, a supporting system for making a decision of pavement, maintenance and repair, was made, and the proper time for repair according to the PCI reduction rate was suggested. METHODS : By comparing and analyzing the evaluation results of pavements built in 2009, 2010, 2011, PCI change in each facility (No. 2 runway, C parallel taxiway, connection taxiway) was calculated. By applying the calculated change to PCI deduction rate model, the pavement condition of the target sections was estimated, and then the necessary section and time for repair were chosen. RESULTS : After careful consideration of the time for pavement and maintenance, based on the result of PCI prediction, it was estimated that the southern takeoff and landing section of No. 2 runway was required to be repaired in 2012; connection taxiway in 2013; and C parallel taxiway in 2014; however, the section which is the main moving route of connection taxiway and C parallel taxiway was needed to be repaired in 2012. CONCLUSIONS : For maintenance and repair of airport pavements, the optimal alternative should be chosen by considering economics and operability, via examining the time for repair and the aspect of management all together on the basis of this study.

Seismic performance of South Nias traditional timber houses: A priority ranking based condition assessment

  • Sodangi, Mahmoud;Kazmi, Zaheer Abbas
    • Earthquakes and Structures
    • /
    • v.18 no.6
    • /
    • pp.731-742
    • /
    • 2020
  • Due to incessant earthquakes, many historic South Nias traditional timber houses have been damaged while some still stand today. As Nias is part of an extremely active tectonic region and the buildings are getting older by day, it is essential that these unique houses are well maintained and functioning well. A post-earthquake condition assessment was conducted on 2 selected buildings; 'Building A' survived the seismic shakings while 'Building B' got severely damaged. The overall condition assessment of "Building A' was found out to be poor and the main structural members were not performing as intended. In 'Building B', the columns were not well anchored to the ground, no tie beams to tie the columns together, and eventually, the timber columns moved in various directions during the earthquake. The frequent earthquakes along with deterioration due to lack of proper maintenance program are responsible for the non-survival of the buildings. Thus, a process guideline for managing the maintenance of these buildings was proposed. This is necessary because managing the maintenance works could help to extend the life of the buildings and seek to avoid the need for potentially expensive and disruptive intervention works, which may damage the cultural significance of the buildings.

Stochastic FMECA Assessment for Optimal RCM of Combustion-Turbine Generating Unit (복합화력발전기의 신뢰도 기반 유지보수를 위한 확률론적 FMECA 평가)

  • Joo, Jae-Myung;Lee, Seung-Hyuk;Shin, Jun-Seok;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.2
    • /
    • pp.254-259
    • /
    • 2007
  • PM(Preventive Maintenance) can avail the generating unit to reduce cost and gain more profit in a competitive supply-side power market. So, it is necessary to perform reliability analysis on the power systems in which reliability is essential. Thus, to schedule optimal PM planning based on reliability that is defined RCM(Reliability-Centered Maintenance), FMECA(Failure Mode Effects and Criticality Analysis) assessment is very important. Therefore, in this paper, the procedure of FMECA assessment for optimal RCM is proposed by probabilistic approach using real historical failure data of combustion-turbine generators in Korean power systems. The stochastic FMECA is performed based on the effects of probable failure modes of combustion-turbine generating unit.

An Evaluation of Influencing Parameters on Biaxial Bending Moment Strength of Reinforced Concrete Columns (철근 콘크리트 기둥의 2축휨 강도에 영향을 미치는 변수 고찰)

  • Yoo, Suk-Hyung;Bahn, Byong-Youl;Shin, Sung-Woo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.2
    • /
    • pp.239-246
    • /
    • 2003
  • In the PCA Load Contour Method, the biaxial bending design coefficient of columns(${\beta}$) is based on the equivalent rectangular stress block (RSB). And coefficient of ${\beta}$ estimates the reinforcement index to be a influencing parameter on biaxial moment strength of RC columns without considering the arbitrary condition of bar arrangement. The experimental results of high strength concrete (HSC) columns subjected to combined axial load and biaxial bending moment were compared to the analysis results of RSB method. As result, the accuracy of RSB method is still acceptable for HSC columns and, as the reinforcement is placed densely in each corner of column section, the ${\beta}$ is decreased.

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

Damage Assessment of a Post-Tensioned Segmental Concrete Bridge Using Modal Testing Data (모달시험을 통한 Post-Tensioned Segmental 콘크리트 교량의 손상평가)

  • Heo, Gwanghee;Choi, Man-Yong;Wang, M.L.
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.3 no.4
    • /
    • pp.205-214
    • /
    • 1999
  • 구조물의 동특성(고유진동수, 감쇠, 모드형상 등)의 변화는 구조물의 안전도를 평가할 수 있는 한 방법이다. 본 연구에서 콘크리트 세그먼트의 웨브 부분에 상당히 많은 균열이 진전되고 있는 상태의 Post-Tensioned Segmental 콘크리트 교량의 안전도 평가를 시도하였다. 안전도 평가를 위한 근간 데이터로 1986년 측정했던 데이터와 2차원 유한요소해석에서 얻은 결과값을 사용했다. 손상의 정도와 손상의 위치를 보다 정확히 찾아내기 위한 기술 중의 한 방법으로 Modal Test를 이용하였다. 이 방법이 Post-Tensioned Segmental 콘크리트 교량에 적용되어 교량의 안전도를 분석 평가하였다.

  • PDF

Damage Prediction of Reinforced Concrete Structures due to Ground Motion (지반진동으로 인한 R/C 구조물의 손상에 관한 연구)

  • Rhim, Hong-Chul;Kim, Ji-Yeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.2
    • /
    • pp.195-202
    • /
    • 2002
  • Urbanization and development of industry makes people concerned about quality of circumstances. Problems of vibration are on the rise. Vibration makes inhabitants feel unpleasant and involves structural damage. The purpose of this study is to assess damage of reinforced concrete structures due to ground motions as the parameters of frequency, duration time and aspect ratio of structures are changed. Ground motions were modeled as sine waves. To compare sine waves with real ground motions, two cases are selected; one is blast loading case and the other is earthquake loading. It was intended to provide means to assess R/C structure damage due to ground motions.

Large-scale Generator Maintenance Scheduling via Sensitivity Analysis Method (민감도 분석에 기초한 대규모 전력계통의 예방정비계획 방법론 개발)

  • Jung, Man-Ho;Park, Jong-Bae
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1020-1023
    • /
    • 1998
  • This paper presents a new approach to large-scale optimal generator maintenance scheduling. To do this, we developed a kind of discrete sensitivity index of each generator by using difference of objective fuction when it is on and off status. Based on the sensitivity value, we applied the conventional priority approach as an optimization method in the order of each generator's sensitivity measure. By applying the developed method, we can efficiently search the state space and dramatically reduce the computation time in a large scale power system.

  • PDF

Development of Plant Safety Information Management System for Preventive Maintenance (사전예방을 위한 설비안전정보시스템 개발)

  • Kim Tae Hwan;Yang Kwang Mo;Choi Seung Hee;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.2
    • /
    • pp.1-12
    • /
    • 2005
  • TPM(Total Productive Management) that is enforcing introducing more than $80\%$ in domestic manufacturing industry is using total plant efficiency by the evaluation index, and as a result, can see a lot of examples that plant productivity is increased. This study's purpose centers total productive management activities that is management system for total plant efficiency's maximization, plant information system that total productive management activities factor that is enforcing in manufacturing industry can develop evaluation model that can evaluate qualitative activities by quantitative activities in process that maximize total plant efficiency wishes to do design.