• 제목/요약/키워드: In excavating of rock slope

검색결과 8건 처리시간 0.018초

The difference in the slope supported system when excavating twin tunnels: Model test and numerical simulation

  • Liu, Xinrong;Suliman, Lojain;Zhou, Xiaohan;Zhang, Jilu;Xu, Bin;Xiong, Fei;Elmageed, Ahmed Abd
    • Geomechanics and Engineering
    • /
    • 제31권1호
    • /
    • pp.15-30
    • /
    • 2022
  • Slope stability during the excavation of twin road tunnels is considered crucial in terms of safety. In this research, physical model testing and numerical analysis were used to investigate the characteristics of the settlement (uz) and vertical stresses (σz) along the two tunnel sections. First, two model tests for a (fill-rock) slope were conducted to study the settlement and stresses in presence and absence of slope support (plate support system). The law and value of the result were then validated by using a numerical model (FEM) based on the physical model. In addition, a finite element model with a slope supported by piles (equivalent to the plate) was used for comparison purposes. In the physical model, several rows of plates have been added to demonstrate the capacity of these plates to sustain the slope by comparing excavating twin tunnels in supported and unsupported slope, the results show that this support was effective in the upper part of the slope, while in the middle and lower part the support was limited. Additionally, the plates appear to induce less settlement in several areas of the slope with differing settlement and stress distribution as compared to piles. Furthermore, as a results of the previous mentioned investigation, there are many factors influence the stress and settlement distribution, such as the slope's cover depth, movement during excavation, buried structures such as the tunnel lining, plates or piles, and the interaction between all of these components.

S 석회석광산에서의 최종 잔벽사면의 안정성 평가 (Stability Assessment on the Final Pit Slope in S Limestone Mine)

  • 선우춘;이윤수;김현우;이병주
    • 터널과지하공간
    • /
    • 제23권2호
    • /
    • pp.99-109
    • /
    • 2013
  • 노천광산사면은 일반적으로 경제성 문제로 지보대책을 고려하지 않고 설계된다. 그러나 최종 잔벽사면은 장기적인 안정성이 필요하므로 경우에 따라서는 안정성을 높일 수 있는 적절한 대책이 필요하다. 본 연구를 위해 S 석회석 광산의 지질 및 불연속면 조사, 암반평가, 강도시험 등 현장조사를 수행하였다. 그리고 최종 잔벽사면에 대해 평사투영, SMR, 수치해석을 통한 안정성 평가를 실시하고, 최종 잔벽사면의 처리방안을 제안하였다. 해석결과, 사면 전체규모에서 파괴는 예상되지 않지만, 벤치규모의 사면파괴는 발생할 가능성이 있다. 최종 잔벽사면은 프리스플리팅 발파로 정리하고, 중간 소단에 폭이 넓은 berm을 설치하거나 국부적으로 지하수 유출이 있는 곳에는 수평배수공 등을 시공하여 벤치사면의 안정성을 높일 수 있을 것이다.

사면 및 터널에서의 암반 파쇄대 보강을 위한 개량형 록볼트 개발 (Development of Improved Rock Bolt for Reinforcement of Fracture Zone in Slope and Tunnel)

  • 김수로;김종태;박성철;김태혁;권현호;정교철
    • 지질공학
    • /
    • 제20권1호
    • /
    • pp.101-109
    • /
    • 2010
  • 대규모 도로사면의 경우 대부분 소단 형식의 계단식 절개사면인 경우가 많다. 특히 단층파쇄대와 동반된 절개사면은 안정성 확보를 위해 특별한 보강공법이 요구된다. 이러한 특이 사면에서의 경우는 지질적 특성 때문에 기존 사면 보강공법으로는 어려운 경우가 많다. 특히 파쇄대 발달 구간에서는 굴착과 발파로 인해 암반 내 블록의 움직임 및 불연속면의 간극이 확대되어 사면의 안전율이 크게 낮아진다. 이로 인해 파쇄대의 지질적 특성에 따른 효율적인 보강대책공법 개발이 필요하나 현재까지의 지보재로는 그 적용성에 한계가 있다. 따라서 사면 및 터널 내 특이 파쇄대 구간의 효율적인 안정성 확보를 위해 특화된 록볼트 공법 개발이 필요하다. 본 연구에서는 이를 위해 최근 특이 암반파쇄대 구간에서 전면 마찰형으로 사용되는 스웰렉스 볼트 공법의 지보효과를 증대시키는 새로운 개량형 록볼트를 개발하는데 목적을 두고 있다.

Numerical analysis on stability of express railway tunnel portal

  • Zhou, Xiaojun;Hu, Hongyun;Jiang, Bo;Zhou, Yuefeng;Zhu, Yong
    • Structural Engineering and Mechanics
    • /
    • 제57권1호
    • /
    • pp.1-20
    • /
    • 2016
  • On the basis of the geological conditions of high and steep mountainous slope on which an exit portal of an express railway tunnel with a bridge-tunnel combination is to be built, the composite structure of the exit portal with a bridge abutment of the bridge-tunnel combination is presented and the stability of the slope on which the express railway portal is to be built is analyzed using three dimensional (3D) numerical simulation in the paper. Comparison of the practicability for the reinforcement of slope with in-situ bored piles and diaphragm walls are performed so as to enhance the stability of the high and steep slope. The safety factor of the slope due to rockmass excavation both inside the exit portal and beneath the bridge abutment of the bridge-tunnel combination has been also derived using strength reduction technique. The obtained results show that post tunnel portal is a preferred structure to fit high and steep slope, and the surrounding rock around the exit portal of the tunnel on the high and steep mountainous slope remains stable when rockmass is excavated both from the inside of the exit portal and underneath the bridge abutment after the slope is reinforced with both bored piles and diaphragm walls. The stability of the high and steep slope is principally dominated by the shear stress state of the rockmass at the toe of the slope; the procedure of excavating rockmass in the foundation pit of the bridge abutment does not obviously affect the slope stability. In-situ bored piles are more effective in controlling the deformation of the abutment foundation pit in comparison with diaphragm walls and are used as a preferred retaining structure to uphold the stability of slope in respect of the lesser time, easier procedure and lower cost in the construction of the exit portal with bridge-tunnel combination on the high and steep mountainous slope. The results obtained from the numerical analysis in the paper can be used to guide the structural design and construction of express railway tunnel portal with bridge-tunnel combination on high and abrupt mountainous slope under similar situations.

실차의 거동한계를 고려한 굴착기의 굴착 경로설계 연구 (A Study on Excavation Path Design of Excavator Considering Motion Limits)

  • 신대영
    • 드라이브 ㆍ 컨트롤
    • /
    • 제18권2호
    • /
    • pp.20-31
    • /
    • 2021
  • An excavator is a construction machine that can perform various tasks such as trenching, piping, excavating, slope cutting, grading, and rock demolishing. In the 2010s, unmanned construction equipment using ICT technology was continuously developed. In this paper, the path design process was studied to implement the output data of the decision stage, and the path design algorithm was developed. For example, the output data of the decision stage were terrain data around the excavator, excavator mechanism information, excavator hydraulic information, the position and posture of the bucket at key points, the speed of the desired bucket path, and the required excavation volume. The result of the path design was the movement of the hydraulic cylinder, boom arm, bucket, and bucket edge. The core functions of the path design algorithm are the function of avoiding impact during the excavation process, the function to calculate the excavation depth that satisfies the required excavation volume, and the function that allows the bucket to pass through the main points of the excavation process while maintaining the speed of the desired path. In particular, in the process of developing the last function, the node tracking method expressed in the path design table was newly developed. The path design algorithm was verified as this path design satisfied the JCMAS H02 requirement.

절개사면에 설치된 앵커지지 합벽의 변형거동 및 사면안정효과 (Deformation Behavior and Slope Stability Effect of Anchored Retention Walls Installed in Cut Slope)

  • 홍원표;한중근
    • 한국지반공학회논문집
    • /
    • 제20권9호
    • /
    • pp.57-64
    • /
    • 2004
  • 절개사면에 설치된 앵커지지 흙막이벽의 설계법을 확립하기 위해서는 흙막이벽체 및 배면지반의 변형거동을 규명할 필요가 있다 따라서, 본 연구에서는 아파트 신축부지 절개사면의 보강을 위해 앵커지지 흙막이벽과 억지말뚝이 설치된 사면을 대상으로 계측을 수행하였다. 굴착단계별 앵커설치시 흙막이벽의 수평변위는 감소하고 상대적으로 배면지반의 변형은 증가하는 경향이 있다. 앵커력 도입시 흙막이벽의 수평변위는 전반적으로 감소하며, 앵커의 인장력은 흙막이벽의 변형에는 큰 영향을 미치지만 배면지반의 변형에 미치는 영향은 크지 않았다. 흙막이벽의 최대수평 변위는 굴착깊이의 $1~4\%$사이에 발생하며, 암반굴착면을 갖는 배면수평면인 앵커지지 흙막이벽의 최대수평변위보다 $2\~8$배정도 크게 발생된다. 한편, SLOPILE(Ver 3.0)프로그램을 이용하여 앵커지지 흙막이벽의 사면안정효과를 검토하였으며, 사면안정해석시 앵커지지 흙막이말뚝에 작용하는 측방토압은 배면수평면인 앵커지지 흙막이벽에 적용하는 경험토압의 평균값이 적용가능하다.

드럼커터 어태치먼트의 작용력에 대한 현장시험 (Field Test for Estimation of Acting Force on the Drum Cutter Attachment)

  • 최순욱;이철호;강태호;장수호
    • 터널과지하공간
    • /
    • 제32권6호
    • /
    • pp.373-385
    • /
    • 2022
  • 굴착기의 어태치먼트 형태로 사용하는 드럼커터는 현장에서 다양한 작업이 가능한 굴착기와 연계하여 사용하는 점에서 그 효용이 크다. 본 연구에서는 굴착기에 설치된 드럼커터 어태치먼트를 이용하여 노출된 암반사면을 대상으로 굴착 시 나타나는 유압과 변형률을 측정하여 드럼커터에 작용하는 하중과 토크를 추정하였다. 굴착기의 붐과 암의 작업각도와 sumping, lowering작업에 따라 8가지 작업모드로 구분하고 작업모드에 따른 유압과 작용력 변화를 분석한 결과, 유압과 유량은 드럼커터 어태치먼트의 제작사양에서 고려된 범위 내에서 문제없이 구동될 수 있음을 확인하였다. 드럼커터 어태치먼트에 작용하는 평균 하중과 토크는 제작사양의 범위 안에 있었지만, 최대하중은 제작사양의 4배까지 나타났다. 높은 지반강도의 영향으로 sumping이 적정하게 이루어지지 못한 점과 일부 위치에서 불연속면의 포함 등으로 인하여 굴착기의 붐과 암의 각도에 따른 하중과 토크의 경향을 발견하지 못하였다. 그러나 해당 결과는 높은 강도의 지반을 굴착할 경우에 드럼커터 어태치먼트에 나타나는 하중과 토크의 범위를 파악하는데 사용될 수 있을 것으로 판단된다.