• 제목/요약/키워드: Improvement execution quality

검색결과 59건 처리시간 0.021초

통신을 이용한 열차제어시스템의 기존 도시철도 적용을 위한 시행절차연구 (The Study for execution procedural to apply CBTC(Communication Based Train Control) on the subway)

  • 김유호;이훈구;이수환;김종기;백종현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 학술회의 논문집 정보 및 제어부문 B
    • /
    • pp.357-360
    • /
    • 2003
  • Improvement is required to solve problems depending on long term use of signal equipment in the existing city railroad and to raise quality of passenger services. Accordingly, for more efficient improvement, we examined the procedure of executing construction of the communication based train control system in Korean city railroads, which is globally studied. The procedure of executing construction of the system is to present a plan for construction first of ail and then to prepare a strategy for construction of the system. It is required to establish a procedure for execution in each step depending on the prepared strategy and then to establish a detailed execution plan. We studied such an execution procedure, divided the execution procedure for application of the train control system through five steps to prepare the execution procedure.

  • PDF

선박검사 및 심사부문의 품질경영시스템 구성요인에 관한 연구 (A Study on the Compositional Elements of Quality Management System of Ship Inspection and Audit Sector)

  • 노창균
    • 품질경영학회지
    • /
    • 제29권4호
    • /
    • pp.18-37
    • /
    • 2001
  • On this research, recognizing that ship inspection and audit services are closely related in Improving ship safety, the importance of active quality managements of ship inspection and audit services have been notified. For this research, based on previous research results, Quality managements of ship inspection and audit services were divided into the following aspects; the source of quality managements, execution of quality managements and outcome of quality managements. The results of this study is as follows. Overall, it is clearly shown that the elements of quality managements execution such as management responsibilities, resource management., product realization, measurement and analyzation, and improvement had also acted as a mediator between the relation of quality managements source and outcome.

  • PDF

의약품 설계 기반 품질 고도화(QbD)를 위한 QbD 6시그마 체계 구축에 관한 연구 (A Study on the Build of a QbD Six Sigma System to Promote Quality Improvement(QbD) Based on Drug Design)

  • 김강희;김현정
    • 품질경영학회지
    • /
    • 제50권3호
    • /
    • pp.373-386
    • /
    • 2022
  • Purpose: This study proposes the application of Six Sigma management innovation method for more systematically enhanced execution of Quality by Design (QbD) activities. QbD requires a deeper understanding of the product and process at the design and development stage of the drug, and it is very important to ensure that no fault is fundamentally generated through thorough process control. Methods: Analyzing the background and specific procedures of quality improvement based on the drug design basis, and analyzing the key contents of each step, we have differentated and common points from the 6 Sigma methodology. We propose a new model of Six Sigma management innovation method suitable for pharmaceutical industry. Results: Regulatory agencies are demanding results from statistical analysis as a scientific basis in developing medicines to treat human life through quality improvement activities based on drug design. By utilizing the education system to improve the statistical analysis capacity in the Six Sigma activities and operating the 6 Sigma Belt system in conjunction, it helped systematically strengthen the execution power of quality improvement activities based on pharmaceutical design based on the members of the pharmaceutical industry. Conclusion: By using QbD Six Sigma, which combines quality enhancement based on pharmaceutical design basis and Six Sigma methodology suitable for pharmaceutical industry, it is possible to obtain satisfactory results both by pharmaceutical companies and regulators by using appropriate statistical analysis methods for preparing scientific evidence data required by regulatory.

Getting Feedback on a Compiler's Optimization Decisions, Enabling More Code-Optimization Opportunities

  • Min, Gyeong Il;Park, Sewon;Han, Miseon;Kim, Seon Wook
    • IEIE Transactions on Smart Processing and Computing
    • /
    • 제4권6호
    • /
    • pp.450-454
    • /
    • 2015
  • Short execution time is the major performance factor for computer systems. This performance factor is directly determined by code quality, which is influenced by the compiler's optimizations. However, a compiler has limitations when optimizing source code due to insufficient information. Thus, if programmers can learn the reasons why a compiler fails to apply optimizations, they can rewrite code that is more easily understood by the compiler, and thus improve performance. In this paper, we propose a compiler that provides a programmer with reasons for failed optimization and recognizes programmer's additional information to obtain better optimization. As a result, we obtain performance improvement, i.e., reducing execution time and code size, by taking advantage of additional optimization opportunities.

현장측량시스템을 이용한 터널공사의 효용성 향상 (Improvement Efficiency of Tunnel Work using Site Surveying System)

  • 최석근;안원태
    • 대한공간정보학회지
    • /
    • 제14권3호
    • /
    • pp.31-37
    • /
    • 2006
  • 기존의 터널 측량 방법은 관측시간이 많이 소요되고, 이로 인한 공사비 증가 및 공사기간 지연 등의 문제점을 가지고 있기 때문에 터널측량에서의 오차요인과 시간 및 경비절감 문제 등을 해결할 수 있는 측량시스템을 개발하여 효율성 증대를 위한 측량방법을 제안하였다. 이러한 문제점들을 해결하기 위하여 측량 장비와 Note book 컴퓨터를 연결하여 현장에서 실시간으로 터널측량과 동시에 위치 및 오차들을 결정할 수 있는 시스템을 개발하였다. 터널측량시스템을 개발함으로서 터널 측량시 오차발생과 터널 굴착시의 미굴 및 여굴의 가능성을 최소화하여 시공품질의 향상과 원가 절감 및 공기 단축 등의 효과를 가져 올 수 있도록 하였다.

  • PDF

건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구 (Analysis of Construction Safety Management and Execution Tasks for Performance Improvement)

  • 강상훈;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 - (A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works -)

  • 이주성;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제5권3호
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

가상화 기술을 활용한 무기체계 소프트웨어 규격자료 품질향상 방안 연구 (An improvement method of weapon system software standards material quality using virtualization technology)

  • 최민관;국승학;이태호
    • 소프트웨어공학소사이어티 논문지
    • /
    • 제29권1호
    • /
    • pp.1-6
    • /
    • 2020
  • 최근 무기체계에서 소프트웨어가 차지하는 비중이 증가함에 따라 소프트웨어 개발환경 또한 매우 다양해지고 있다. 무기체계 소프트웨어 분야에서는 국방 규격자료로 소프트웨어 기술문서, 소프트웨어 소스코드, 소프트웨어 실행파일을 제출하도록 하고 있다. 국방 규격을 통해 소프트웨어 실행파일을 재생성하기 위한 소프트웨어 파일목록 및 개발환경을 문서화하도록 요구하고 있다. 하지만 연구개발 종료 후 해당 규격자료를 기반으로 소프트웨어 실행파일을 생성하기 위해서는 기술문서에 작성된 개발환경 정보를 참고하여 개발환경 재구축 등의 추가적인 노력이 필요하다. 따라서 본 연구에서는 가상화 기술을 활용하여 소프트웨어 규격자료의 품질을 향상하는 방안을 제시하고자 한다. 이를 통해 소프트웨어 개발환경 재구축에 대한 노력 절감 및 개발환경 단종으로 인한 문제를 해결할 수 있을 것으로 기대한다.

수도권 미세먼지 환경 개선을 위한 미국의 대기환경정책 사례 조사 연구 (Review of PM-related Air Quality Improvement Policies of United States for PM-related Air Quality Improvement of Metropolitan Region in Korea)

  • 우정헌
    • 한국대기환경학회지
    • /
    • 제25권6호
    • /
    • pp.579-593
    • /
    • 2009
  • Several fine particle-related policies in Northeast United States were investigated in support of the execution of special measures to improve air quality of Seoul Metropolitan Area (SMA). The definition of particulate matter (PM) in the Clean Air Act (CAA), components and procedures of Regional Haze Rule (RHR), and Air Quality Management (AQM) were reviewed. Several State Implementation Plans (SIPs) were also reviewed as the way to attain required air quality under the Clean Air Act. $PM_{2.5}$ attainment SIP of Maryland, 8-hr Ozone attainment SIP of New Jersey, and Regional Haze Rule attainment SIP of MANE-VU were analyzed in detail as case studies. We realized that "Special Measures for Air Quality Improvement in the Seoul Metropolitan Area" has many similarities with its US counterparts in terms of purpose, components, procedures, and implementation methods. US policies, however, have more advanced features, such as standardized procedures and methods, transparent guidelines, and stable relationship among federal/state/local governments and stakeholders, which would be helpful to improve air quality in SMA.

당일 감마나이프수술 환자의 표준진료지침 개발을 통한 질 향상 효과 측정 (Measuring Effects of Quality Improvement through the Development of Critical Pathway for Gamma Knife Radiosurgery)

  • 김무성;하소영;배윤혁;정용태;김성태;이원희;고연주
    • 한국의료질향상학회지
    • /
    • 제18권1호
    • /
    • pp.27-36
    • /
    • 2012
  • Objectives : A protocol called "critical pathway" was developed to standardize the management of hospital patients the day after they underwent gamma knife radiosurgery. The quality of improvement in patient outcomes was evaluated. Methods : Critical pathway was developed, according to the regulations of the I hospital, by analyzing the medical records of 22 inpatients who underwent gamma knife surgery within the period from January to April 2011 on the day of the surgery. The study included a group of 22 patients admitted to the hospital the day after they underwent gamma knife radiosurgery, between July and September 2011. The control group included 22 patients who had surgery employing the same method within the period from May to June 2011. To measure the effects on quality improvement, the average length of stay, the execution rate of the hospital discharge notice system, daily hospital revenue, and the satisfaction of the patients and the medical team were assessed. The patient questionnaire employed a four-point Likert scale while the medical-staff questionnaire employed a five-point Likert scale. Result : The average length of stay was significantly shorter in the study group compared to the control group (2.3 days vs. 3.8 days, P<0.05). The execution rate of the hospital discharge notice system was higher in the study group (100% vs. 72%) than in the control group. Daily hospital revenues were higher by 264,178 Korean won in the study group when compared to the control group. The study group showed greater satisfaction of patients compared to the control group based on a four-point Likert scale (P<0.05). The study group showed greater satisfaction in medical team compared to the control group based on a five-point Likert scale (P<0.05). Conclusion : The development and implementation of a critical pathway protocol for hospital admission the day after gamma knife radiosurgery is an effective care process that improves the clinical quality.

  • PDF