• Title/Summary/Keyword: Implementation Phase

Search Result 1,240, Processing Time 0.026 seconds

The Impact of Service Level Management(SLM) Process Maturity on Information Systems Success in Total Outsourcing: An Analytical Case Study (토털 아웃소싱 환경 하에서 IT서비스 수준관리(Service Level Management) 프로세스 성숙도가 정보시스템 성공에 미치는 영향에 관한 분석적 사례연구)

  • Cho, Geun Su;An, Joon Mo;Min, Hyoung Jin
    • Asia pacific journal of information systems
    • /
    • v.23 no.2
    • /
    • pp.21-39
    • /
    • 2013
  • As the utilization of information technology and the turbulence of technological change increase in organizations, the adoption of IT outsourcing also grows to manage IT resource more effectively and efficiently. In this new way of IT management technique, service level management(SLM) process becomes critical to derive success from the outsourcing in the view of end users in organization. Even though much of the research on service level management or agreement have been done during last decades, the performance of the service level management process have not been evaluated in terms of final objectives of the management efforts or success from the view of end-users. This study explores the relationship between SLM maturity and IT outsourcing success from the users' point of view by a analytical case study in four client organizations under an IT outsourcing vendor, which is a member company of a major Korean conglomerate. For setting up a model for the analysis, previous researches on service level management process maturity and information systems success are reviewed. In particular, information systems success from users' point of view are reviewed based the DeLone and McLean's study, which is argued and accepted as a comprehensively tested model of information systems success currently. The model proposed in this study argues that SLM process maturity influences information systems success, which is evaluated in terms of information quality, systems quality, service quality, and net effect proposed by DeLone and McLean. SLM process maturity can be measured in planning process, implementation process and operation and evaluation process. Instruments for measuring the factors in the proposed constructs of information systems success and SL management process maturity were collected from previous researches and evaluated for securing reliability and validity, utilizing appropriate statistical methods and pilot tests before exploring the case study. Four cases from four different companies under one vendor company were utilized for the analysis. All of the cases had been contracted in SLA(Service Level Agreement) and had implemented ITIL(IT Infrastructure Library), Six Sigma and BSC(Balanced Scored Card) methods since last several years, which means that all the client organizations pursued concerted efforts to acquire quality services from IT outsourcing from the organization and users' point of view. For comparing the differences among the four organizations in IT out-sourcing sucess, T-test and non-parametric analysis have been applied on the data set collected from the organization using survey instruments. The process maturities of planning and implementation phases of SLM are found not to influence on any dimensions of information systems success from users' point of view. It was found that the SLM maturity in the phase of operations and evaluation could influence systems quality only from users' view. This result seems to be quite against the arguments in IT outsourcing practices in the fields, which emphasize usually the importance of planning and implementation processes upfront in IT outsourcing projects. According to after-the-fact observation by an expert in an organization participating in the study, their needs and motivations for outsourcing contracts had been quite familiar already to the vendors as long-term partners under a same conglomerate, so that the maturity in the phases of planning and implementation seems not to be differentiating factors for the success of IT outsourcing. This study will be the foundation for the future research in the area of IT outsourcing management and success, in particular in the service level management. And also, it could guide managers in practice in IT outsourcing management to focus on service level management process in operation and evaluation stage especially for long-term outsourcing contracts under very unique context like Korean IT outsourcing projects. This study has some limitations in generalization because the sample size is small and the context itself is confined in an unique environment. For future exploration, survey based research could be designed and implemented.

  • PDF

Design and Implementation of a Concuuuency Control Manager for Main Memory Databases (주기억장치 데이터베이스를 위한 동시성 제어 관리자의 설계 및 구현)

  • Kim, Sang-Wook;Jang, Yeon-Jeong;Kim, Yun-Ho;Kim, Jin-Ho;Lee, Seung-Sun;Choi, Wan
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.4B
    • /
    • pp.646-680
    • /
    • 2000
  • In this paper, we discuss the design and implementation of a concurrency control manager for a main memory DBMS(MMDBMS). Since an MMDBMS, unlike a disk-based DBMS, performs all of data update or retrieval operations by accessing main memory only, the portion of the cost for concurrency control in the total cost for a data update or retrieval is fairly high. Thus, the development of an efficient concurrency control manager highly accelerates the performance of the entire system. Our concurrency control manager employs the 2-phase locking protocol, and has the following characteristics. First, it adapts the partition, an allocation unit of main memory, as a locking granule, and thus, effectively adjusts the trade-off between the system concurrency and locking cost through the analysis of applications. Second, it enjoys low locking costs by maintaining the lock information directly in the partition itself. Third, it provides the latch as a mechanism for physical consistency of system data. Our latch supports both of the shared and exclusive modes, and maximizes the CPU utilization by combining the Bakery algorithm and Unix semaphore facility. Fourth, for solving the deadlock problem, it periodically examines whether a system is in a deadlock state using lock waiting information. In addition, we discuss various issues arising in development such as mutual exclusion of a transaction table, mutual exclusion of indexes and system catalogs, and realtime application supports.

  • PDF

Development of an Object-Oriented Framework Data Update System (객체 기반의 기본지리정보 갱신시스템 개발)

  • Lee, Jin-Soo;Choi, Yun-Soo;Seo, Chang-Wan;Jeon, Chang-Dong
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.1
    • /
    • pp.31-44
    • /
    • 2008
  • The 1st phase framework data implementation of National Geographic Information Systems (NGIS) used 1:5,000 digital map with 5 years updating period which is lacking in the latest information. This is a significant factor which hinders the use of framework data. This study proposed the efficient technical method of a location based object data management and system implementation for updating framework data. First, we did an object-oriented data modeling and database design using a location based features identifier(UFID: Unique Feature IDentifier). The second, we developed the system with various functions such as a location based UFID creation, input and output, a spatial and attribute data editing, an object based data processing using UML(Unified Modeling Language). Finally, we applied the system to the study area and got high quality data of 99% accuracy and 35% benefit effect of personnel expenses compare to the previous method. We expect that this study can contribute to the maintenance of national framework data as well as the revitalization of various GIS markets by providing user the latest framework data and that we can develop the methods of a feature-change modeling and monitoring using an object based data management.

  • PDF

Science Teaching Professionalism Changes of High-Career Elementary School Teachers Through Instructional Consulting (수업컨설팅을 통한 고경력 초등교사의 과학수업전문성 변화)

  • Kwon, Chi-Soon;Yi, Sun-Mi
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.4 no.3
    • /
    • pp.278-296
    • /
    • 2011
  • The purpose of this study is to examine the pedagogical content knowledge (PCK) elements and the changes in the science lesson planning and implementation difficulties experienced by high-career elementary school teachers with over 20 years of educational experience through the instructional consulting case of the Seoul City Office of Education Scholarship Support Group in order to find implications on effective instructional consulting support plan for improving the science teaching professionalism of high-career elementary school teachers. The result of this study is as follows : First, the pedagogical content knowledge (PCK) elements on the science lesson planning and implementation difficulties experienced by high-career elementary school teachers with over 20 years of educational experience were related to teaching strategy and they experienced difficulties in lesson content organization using lesson model and experiment facilitation and questioning, as well as in the area of interest and motive management that are definitional characteristic of learner in the learner element. Second, as for the changes in the PCK through science instructional consulting, they recognized the importance of the designing and experimenting process as students become the subject in the experiment facilitation in lesson, and they ended up attempting the postscript for promoting the thinking power of students. In addition, it was found that not only the cognitive characteristic but also the definitional characteristic of learner is important in science lesson and that students' motive is also an element that needs to be continuously managed. Third, as for effective instructional consulting plan for enhancing the science teaching professionalism of high-career elementary school teachers, it was revealed that it is necessary to first develop lesson expertise improvement consulting program that takes into account of teaching profession advancement phase of high-career teachers, and establish instructional consulting system and human resource pool of high-quality consultants based on the administrative and financial support from the Office of Education. The academic significance of this study is in the fact that it examined and searched for support plan on science teaching professionalism of high-career elementary school teacher, but a more extensive and in-depth study is needed since there is a limitation in this study on the object of study and the period.

An implementation of 2D/3D Complex Optical System and its Algorithm for High Speed, Precision Solder Paste Vision Inspection (솔더 페이스트의 고속, 고정밀 검사를 위한 이차원/삼차원 복합 광학계 및 알고리즘 구현)

  • 조상현;최흥문
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.41 no.3
    • /
    • pp.139-146
    • /
    • 2004
  • A 2D/3D complex optical system and its vision inspection algerian is proposed and implemented as a single probe system for high speed, precise vision inspection of the solder pastes. One pass un length labeling algorithm is proposed instead of the conventional two pass labeling algorithm for fast extraction of the 2D shape of the solder paste image from the recent line-scan camera as well as the conventional area-scan camera, and the optical probe path generation is also proposed for the efficient 2D/3D inspection. The Moire interferometry-based phase shift algerian and its optical system implementation is introduced, instead of the conventional laser slit-beam method, for the high precision 3D vision inspection. All of the time-critical algorithms are MMX SIMD parallel-coded for further speedup. The proposed system is implemented for simultaneous 2D/3D inspection of 10mm${\times}$10mm FOV with resolutions of 10 ${\mu}{\textrm}{m}$ for both x, y axis and 1 ${\mu}{\textrm}{m}$ for z axis. Experiments conducted on several nBs show that the 2D/3D inspection of an FOV, excluding an image capturing, results in high speed of about 0.011sec/0.01sec, respectively, after image capturing, with $\pm$1${\mu}{\textrm}{m}$ height accuracy.

Design and Implementation of Microstrip Quadrature Coupler and High Power Transmitting/Receiving Switch Using Dynamic Loading Technique for 1-Tesal MRI System (동적 부하 기술을 이용한 1-Tesla 자기공명 영상 시스템용 마이크로 스트립 quadrature coupler 및 고출력 송수신 스위치의 설계 및 제작)

  • 류웅환;이미영;이흥규;이황수;김정호
    • Journal of the Korean Institute of Telematics and Electronics D
    • /
    • v.36D no.3
    • /
    • pp.1-11
    • /
    • 1999
  • It is now common practice to utilize the quadrature RF coils to improve the signal-to-noise ratio (SNR) in the Magnetic Resonance Imaging (MRI) System. In addition, to make such an available SNR improvement, it is mandatory to use a well-designed quadrature coupler, which facilitates a perfect 3-dB coupling and quadrature-phase shift. However, the four ports matching condition has to be well considered during the RF excitation and the signal detection period. This work investigates the effects of such a mismatching condition (especially, due to patient) from the analysis, simulation, and real implementation and firstly proposes dynamic loading technique for a quadrature coupler and transmitting/receiving switch module to minimize a patient mismatching and enhance a system reliability. Also, we designed and implemented the quadrature coupler and transmitting/receiving switch module using microstrip. As a result, the SNR of our MRI system using the microstrip quadrature coupler and transmitting/receiving switch module with dynamic load increases 3 dB compared with the old one using USA quadrature switch. Also, the power capability of quadrature coupler and transmitting/receiving switch module is 5-kw peak power. Considering power loss and reduction of size, we used a RT/duroid 6010 substrate with high permittivity and for simulation we use Compact Software.

  • PDF

Design and Implementation of Fuzzy-based Algorithm for Hand-shake State Detection and Error Compensation in Mobile OIS Motion Detector (모바일 OIS 움직임 검출부의 손떨림 상태 검출 및 오차 보상을 위한 퍼지기반 알고리즘의 설계 및 구현)

  • Lee, Seung-Kwon;Kong, Jin-Hyeung
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.8
    • /
    • pp.29-39
    • /
    • 2015
  • This paper describes a design and implementation of fuzzy-based algorithm for hand-shake state detection and error compensation in the mobile optical image stabilization(OIS) motion detector. Since the gyro sensor output of the OIS motion detector includes inherent error signals, accurate error correction is required for prompt hand-shake error compensation and stable hand-shake state detection. In this research with a little computation overhead of fuzzy-based algorithm, the hand-shake error compensation could be improved by quickly reducing the angle and phase error for the hand-shake frequencies. Further, stability of the OIS system could be enhanced by the hand-shake states of {Halt, Little vibrate, Big vibrate, Pan/Tilt}, classified by subdividing the hand-shake angle. The performance and stability of the proposed algorithm in OIS motion detector is quantitatively and qualitatively evaluated with the emulated hand-shaking of ${\pm}0.5^{\circ}$, ${\pm}0.8^{\circ}$ vibration and 2~12Hz frequency. In experiments, the average error compensation gain of 3.71dB is achieved with respect to the conventional BACF/DCF algorithm; and the four hand-shake states are detected in a stable manner.

Design and Implementation of Distributed QoS Management Architecture for Real-time Negotiation and Adaptation Control on CORBA Environments (CORBA 환경에서 실시간 협약 및 작응 제어를 위한 분사 QoS 관리 구조의 설계 및 구현)

  • Lee, Won-Jung;Shin, Chang-Sun;Jeong, Chang-Won;Joo, Su-Chong
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.27 no.1C
    • /
    • pp.21-35
    • /
    • 2002
  • Nowadays, in accordance with increasing expectations of multimedia stream service on the internet, a lot of distributed applications are being required and developed. But the models of the existing systems have the problems that cannot support the extensibility and the reusability, when the QoS relating functions are being developed as an integrated modules which are suited on the centralized controlled specific-purpose application services. To cope with these problems, it is suggested in this paper to a distributed QoS management system on CORBA, an object-oriented middleware compliance. This systems we suggested can provides not only for efficient control of resources, various service QoS, and QoS control functions as the existing functions, but also QoS control real-time negotiation and dynamic adaptation in addition. This system consists of QoS Control Management Module(QoS CMM) in client side and QoS Management Module(QoS MM) in server side, respectively. These distributed modules are interfacing with each other via CORBA on different systems for distributed QoS management while serving distributed streaming applications. In phase of design of our system, we use UML(Unified Modeling Language) for designing each component in modules, their method calls and various detailed functions for controlling QoS of stream services. For implementation of our system, we used OrbixWeb 3.1c following CORBA specification on Solaris 2.5/2.7, Java language, Java Media Framework API 2.0 beta2, Mini-SQL 1.0.16 and the multimedia equipments, such as SunVideoPlus/Sun Video capture board and Sun Camera. Finally, we showed a numerical data controlled by real-time negotiation and adaptation procedures based on QoS map information to GUIs on client and server dynamically, while our distributed QoS management system is executing a given streaming service.

Design and Implementation of Plannar S-DMB Antenna with Omni-Directional Radiation Pattern Using Metamaterial Technique (메타 물질 기법을 이용한 전방향성 복사 패턴을 갖는 평면형 S-DMB 안테나 설계 및 구현)

  • An, Chan-Kyu;Yu, Ju-Bong;Jeon, Jun-Ho;Kim, Woo-Chan;Yang, Woon-Geun;Nah, Byung-Ku;Lee, Jae-Ho
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.21 no.12
    • /
    • pp.1343-1351
    • /
    • 2010
  • In this paper, a novel patch antenna based on the metamaterial CRLH(Composite Right- and Left-Handed) structure is designed, implemented, and measured. Contrary to the standard microstrip patch's fundamental resonance mode of half-wavelength or its positive multiple, the proposed antenna shows the in-phase electric field over the entire antenna. The proposed antenna has a desired omni-directional field pattern which is typical characteristic of $\lambda/4$ monopole antenna, and also shows the merit of low profile. HFSS(High Frequency Structure Simulator) of Ansoft which is based on the FEM(Finite Element Method) is used to simulate the proposed antenna. FR-4 substrate of thickness 1.6 mm and relative permitivity 4.4 is used for the proposed antenna implementation. The implemented antenna showed VSWR (Voltage Standarding Wave Ratio)$\leq$2 for the frequency band from 2.63 GHz to 2.655 GHz which is used for S-DMB (Satellite-Digital Multimedia Broadcasting) service. And measured peak gain and efficiency are 2.65 dBi and 81.14 %, respectively.

Design and Implementation of High Efficiency Transceiver Module for Active Phased Arrays System of IMT-Advanced (IMT-Advanced 능동위상배열 시스템용 고효율 송수신 모듈 설계 및 구현)

  • Lee, Suk-Hui;Jang, Hong-Ju
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.7
    • /
    • pp.26-36
    • /
    • 2014
  • The needs of active phased arrays antenna system is getting more increased for IMT-Advanced system efficiency. The active phased array structure consists of lots of small transceivers and radiation elements to increase system efficiency. The minimized module of high efficiency transceiver is key for system implementation. The power amplifier of transmitter decides efficiency of base-station. In this paper, we design and implement minimized module of high efficiency transceiver for IMT-Advanced active phased array system. The temperature compensation circuit of transceiver reduces gain error and the analog pre-distorter of linearizer reduces implemented size. For minimal size and high efficiency, the implented power amplifier consist of GaN MMIC Doherty structure. The size of implemented module is $40mm{\times}90mm{\times}50mm$ and output power is 47.65 dBm at LTE band 7. The efficiency of power amplifier is 40.7% efficiency and ACLR compensation of linearizer is above 12dB at operating power level, 37dBm. The noise figure of transceiver is under 1.28 dB and amplitude error and phase error on 6 bit control is 0.38 dB and 2.77 degree respectively.