• Title/Summary/Keyword: Implementation Methods

Search Result 3,486, Processing Time 0.032 seconds

A Study on Implementaion of the GIS Based u-City urban Infrastructures (GIS기반 u-City 도시 인프라 구축에 관한 연구)

  • O, Jong-U;O, Seung-Hun
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2006.12a
    • /
    • pp.379-386
    • /
    • 2006
  • The purpose of this paper is to analyze the implementation of the GIS infrastructure systems for the u-City, GIS base u-City represents spatial information derived fields, such as geographical distribution of the urban boundaries, physical configuration of the urban locations and cultural characteristics of the urban history. These three aspects relate to urban infrastructure systems implementation, urban monitoring center implementation, and spatial database implementation. In terms of the GIS based u-Ci쇼 urban infrastructure implementation systems, the u-City depends on IT contents and spatial features. IT contents are strongly related to IT839 strategy due to the national agenda is "u-Korea". GIS should contribute to u-City construction through the spatial analyses methods. For these methods various GIS functions will guide to u-City's distribution, location, and characteristics of urbanization. The infrastructure consists of road and road facilities, underground facilities, related agencies facilities, dispatch systems, environmental systems, and urban planning. These six units of the urban infrastructures have spatial databases that consist of spatial configuration, such as dots, lines, and polygons in order to draw the spatial distribution of the u-City GIS based u-City urban infrastructure implementation systems should deal with It convergence to generate fusion affects.

  • PDF

A Study on Analysis of the Implementation Status and the Advancement of Computerized Maintenance Management System (CMMS) in Korean Companies (한국기업의 설비관리정보시스템(CMMS) 구현실태 분석과 고도화에 관한 연구)

  • Ku, Sung Tae;Kim, Chang Eun
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.4
    • /
    • pp.693-708
    • /
    • 2013
  • Purpose: This study is to develop an evaluation model for analysis of CMMS Implementation status and provide CMMS advancement methods to maximize implementation effect through the evaluation model. Methods: After extracting common modules from CMMS packages and establishing evaluation standard for each module, then the evaluation standard is applied to 33 Korean companies for evaluating their own current implementation status. Results: Preventive maintenance and analysis information modules were considered the most vulnerable in Korean companies which have introduced CMMS packages. And the reason why preventive maintenance is vulnerable is that there is poor build-up of their own preventive maintenance standards. Conclusion: Korean companies which will introduce CMMS need to make preventive maintenance standards, and data of the materials and the equipment to improve the effectiveness in advance.

Implementation of PPF Controller Using Analog Circuit and Microprocessor (아날로그 회로와 마이크로 프로세서를 이용한 PPF 제어기의 구현)

  • Heo, Seok;Kim, Ki-Young;Kwak, Moon-Kyu
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.14 no.6
    • /
    • pp.455-462
    • /
    • 2004
  • This paper is concerned with the implementation of the active vibration suppression controller using analog circuit and microprocessor. The target active vibration controller is the positive position feedback(PPF) controller since it provides a simple algorithm suitable for both analog circuit and digital controllers. In this study, the analog PPF controller is realized using an operational amplifier and the digital PPF controller is realized using a low-cost micro-controller. The circuit diagrams are explained in detail. We then discuss the advantages and disadvantages of both methods from the view of practical implementation. Experimental results show that both implementation methods can be effectively used for the active vibration control but need to be chosen based on the mission objective.

A Study on the Observer Training and Implementation for Effective Normal Operation Safety Survey (NOSS)

  • Choi, Jin-Kook;Choi, Se-Jong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.2
    • /
    • pp.111-116
    • /
    • 2021
  • Normal Operation Safety Survey (NOSS) is a safety management tool used by air traffic control organizations to measure data related to threats and errors to proactively prevent accidents before they occur. NOSS was developed to be applied to the air traffic control field according to the concept of Line Operation Safety Audit (LOSA) conducted by airlines to reduce human errors in the cockpits. Safety management based on data is crucial for the prevention of control-related accidents, and the competency of observers for this is important for the successful implementation of NOSS. Based on LOSA implementation experiences and expert interviews, this paper introduces the international NOSS methods and discusses the key factors required for effective observation and the implementation methods and implications of NOSS observer training.

An Implementation of the Disaster Management Systems on the Space and Terrestrial System Damages by Solar Maximum (태양폭풍 영향 우주 및 육상시스템 피해에 관한 재난안전정보시스템 구현)

  • Oh, Jongwoo
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.419-431
    • /
    • 2012
  • This paper takes precautions proposals against prospective disasters from the space weather maximum in 2013. A geomagnetic space storm sparked by a solar maximum like the one that flared toward earth is bound to strike again and could wreak havoc across the modern world. The purpose of the study is that the disaster reduction and safety service implementation study on the ultimate space weather systems by the information systems of the space weather. The process methods of the study are that an implementation of preparation for the smart IT and GIS based disaster management systems of the solar maximum deal with analysis on the flare, solar proton event, and geomagnetic storm from space blasters, These approach and methods for the solar maximin display national policy implementation of the pattern of the radio wave disasters from the protection and preparation methods. This research can provide affective methods for the saving lives and property protections that implementation of the disaster prediction and disaster prevention systems adapts the smart IT systems and converged decision making support systems using uGIS methodology.

BIM IMPLEMENTATION STRATEGY AND TASKS FOR ARCHITECTURAL INDUSTRY IN KOREA

  • Ki Byung Yoon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.88-92
    • /
    • 2011
  • Even though attempts are made to transform from 2D CAD to BIM representation for building design and construction, it were not so successful for practical implementation until recently in construction industry in Korea. However, there is a dramatic change for the use of BIM by collaboration among government, independent organizations as well as industry itself. Government reckons that BIM is an important tool for environment friendly construction and industry competitiveness. The government not only makes national BIM standards and push policies in order to make market environment. Independent organizations such as BuildingSMART Korea does active role to stimulate the transformation process successfully. They act as opinion leaders for the Government to consider BIM implementation for industry competitiveness issue. They make roadmap as well as technical standards and guidelines. It also leads technical developments and supports for its implementation. Government supports researches for the implementation of BIM. The research includes BIM standards, guidelines, linking with existing Architectural Administrative Information Systems, making libraries as well as education. Government makes policy for BIM as a compulsory data for bidding process of newly designed government buildings. Private sector not only agrees BIM as a tool to adapt but also essential methods for its survival in domestic and foreign construction market. Architectural design companies and constructions companies currently develop technical skills and implement BIM for new projects such as Dongdaemoon Plaza that cannot be successfully drawn by conventional methods.

  • PDF

PARALLEL IMPLEMENTATION OF HYBRID ITERATIVE METHODS FOR NONSYMMETRIC LINEAR SYSTEMS

  • Yun, Jae-Heon;Kim, Sang-Wook
    • Journal of applied mathematics & informatics
    • /
    • v.4 no.1
    • /
    • pp.1-16
    • /
    • 1997
  • In this paper we study efficient parallel implementation for hybrid iterative methods BICGSTAB and BICGSTAB $(\ell)$ with ${Well}=2$ on the CRAY C90 and the efficiency of their parallel performance is evaluated. numerical experiments suggest that on the CRAY C90 a parallel inner product algorithm called PDOTB be used for the par-allelization of hybrid iterative methods containing sensitive values of inner products. Lastly it is shown that the number of iterations in which parallel hybrid iterative methods satisfy a certain convergence criterion depends on the number of processors to be used.

Computational Experience of Linear Equation Solvers for Self-Regular Interior-Point Methods (자동조절자 내부점 방법을 위한 선형방정식 해법)

  • Seol Tongryeol
    • Korean Management Science Review
    • /
    • v.21 no.2
    • /
    • pp.43-60
    • /
    • 2004
  • Every iteration of interior-point methods of large scale optimization requires computing at least one orthogonal projection. In the practice, symmetric variants of the Gaussian elimination such as Cholesky factorization are accepted as the most efficient and sufficiently stable method. In this paper several specific implementation issues of the symmetric factorization that can be applied for solving such equations are discussed. The code called McSML being the result of this work is shown to produce comparably sparse factors as another implementations in the $MATLAB^{***}$ environment. It has been used for computing projections in an efficient implementation of self-regular based interior-point methods, McIPM. Although primary aim of developing McSML was to embed it into an interior-point methods optimizer, the code may equally well be used to solve general large sparse systems arising in different applications.

Theoretical Consideration About Separate Order for the Electrical Work - Focusing on the Policy Implementation Theory - (전기공사 분리발주의 이론적 고찰 - 정책집행 이론을 중심으로 -)

  • Kim, Hyo-Jin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2165-2170
    • /
    • 2011
  • The separate order for the electrical work is an institutional plan to improve the electrical construction quality and strengthen the competitiveness of the electrical contractors. The systematic approach for the policy implementation of the separate ordering system can make its adaptability higher and lead to a policy success. There are many kinds of effects on the implementation of the separate order, but institutional foundation is needed for increasing the policy adaptability. The necessity of the systematic and theoretical foundation was detected in various factors by considering policy implementation theory. In order to fix the separate ordering system, reasonable methods such as finding inducements and offering incentive are more effective than legal procedures. At last, a variety of policy adaptability plans must be founded in order to invigorate the separate ordering system in a view of the policy implementation.