• 제목/요약/키워드: IXL(Interlocking)

검색결과 3건 처리시간 0.016초

한국형 고속전철용 신호시스템의 실험실 시험을 위한 통합 신호시스템 (Integrated Railway Signaling Systems for Laboratory Testing of Next-generation High-speed Train)

  • 황종규;이종우;박용진
    • 전기학회논문지P
    • /
    • 제53권1호
    • /
    • pp.32-39
    • /
    • 2004
  • Railway signaling systems consist of several vital computerized equipment such as CTC(Centralized Traffic Control), EIS(Electronic Interlocking System), ATC(Automatic Train Control) and so on. Currently, the project for development of railway signaling systems for the next-generation high-speed train is progressed according to the G7 project and railway signaling related several companies and research institute are joined this project consortium. The railway signaling systems, being developed in this project, called as a kTCS(Korean Train Control System), is composed of kTCS-CTC, kTCS-IXL, kTCS-ATC and etc. kTCS signaling systems have to be operated at the laboratory testing level as integrated signaling systems by interface between each railway signaling systems before railway field installation and revenue service. To solve this matter, communication protocols between each signaling equipment are designed and message codes for each defined protocols have defined. And also several equipment has developed for the railway integrated signaling systems for laboratory testing. We has plentifully tested and verified the designed protocols and the characteristics of integrated railway signaling systems with our developed each kTCS signaling equipment and communication protocols. In this paper, the integrated kTCS system including communication protocols is presented.

한국형고속철도 열차제어시스템 하부구성요소 신뢰도입증에 관한 연구 (A Study on the Reliability Demonstration for Korea High Speed Train Control System)

  • 이재호;이강미;김용규;신덕호
    • 한국철도학회논문집
    • /
    • 제9권6호
    • /
    • pp.732-738
    • /
    • 2006
  • This research provides a scheme for Highly Accelerated Stress Test that is necessary to demonstrate reliability prediction of Korean Rapid Transit Railway Train Control System sub-equipment, which is calculated by a relevant standard for failure rate prediction of electronic products. Although determining failure information generated in the process of trial running by statistic analysis is widely accepted as a measure of confirmation for reliability prediction, this research suggests the modeling for System Life Test determined by accelerating stress factors as a measure of confirmation for reliability prediction of sub-equipment unit that is generated ahead of a trial running in System Life Cycle. Consequently, the research demonstrates sub-equipment unit reliability test, which is based on the model derived from Accelerated Stress Test, according to accuracy level and the number of samples, and conducts an official experiment by making out a reliability test procedure sheet based on test time as well.

지상신호설비의 유지보수 효율화를 위한 집중화 및 전자화 연구 (The Study on Centralization & Electronic for Maintenance Efficiency of Ground Signaling System)

  • 백종현;김용규;이강미
    • 한국산학기술학회논문지
    • /
    • 제11권8호
    • /
    • pp.2983-2988
    • /
    • 2010
  • 국내 철도 신호시스템은 전자화로 발전하고 있으며 이 중 연동장치의 전자화는 57%에 이르고 있고, 선로변장치 중 건널목 보안장치는 통합시스템으로 개발이 완료되어 있다. 그러나 기존선 전 구간의 폐색장치는 전자화 및 통합화가 되어있지 않아 건설과 유지보수 측면에서 많은 보완점을 가지고 있다. 현재 국내 기존선에 사용되고 있는 ABS와 경부 및 호남선에 설치중인 LEU는 동일한 장소에서 동일한 열차의 신호정보에 의해 열차를 제어하고 있음에도 불구하고 각각 별개의 시스템으로 분리되어 설치되어 있기 때문에 동일한 정보를 각각 별개로 나누어 송수신하여 열차를 제어하고 있다. 따라서 종래의 ABS와 LEU에서는 램프검지부나 전원부 등과 같이 중복 설치된 부품이 많기 때문에 전체적인 제품의 제조 원가가 높아질 뿐만 아니라, 시공비 역시 2중으로 소요되고 유지보수에도 많은 인력과 비용을 투자해야 하는 등의 문제가 있다. 따라서 본 논문에서는 현재 사용 중인 ABS에 통신 및 전자기술을 접목시켜서 집중형 전자폐색제어장치를 개발하기 위한 내용을 제시하고 있으며, 해당역 관내 폐색장치를 집중감시 및 관리를 하고 ATP 시스템의 지상장치인 LEU와 연계하여 정보 전송이 가능하도록 하고자 한다.