SIMULATED ANNEALING FOR LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS

  • C.I. Yen
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.530-539
    • /
    • 2007
  • Many construction projects such as highways, pipelines, tunnels, and high-rise buildings typically contain repetitive activities. Research has shown that the Critical Path Method (CPM) is not efficient in scheduling linear construction projects that involve repetitive tasks. Linear Scheduling Method (LSM) is one of the techniques that have been developed since 1960s to handle projects with repetitive characteristics. Although LSM has been regarded as a technique that provides significant advantages over CPM in linear construction projects, it has been mainly viewed as a graphical complement to the CPM. Studies of scheduling linear construction projects with resource consideration are rare, especially with multiple resource constraints. The objective of this proposed research is to explore a resource assignment mechanism, which assigns multiple critical resources to all activities to minimize the project duration while satisfying the activities precedence relationship and resource limitations. Resources assigned to an activity are allowed to vary within a range at different stations, which is a combinatorial optimization problem in nature. A heuristic multiple resource allocation algorithm is explored to obtain a feasible initial solution. The Simulated Annealing search algorithm is then utilized to improve the initial solution for obtaining near-optimum solutions. A housing example is studied to demonstrate the resource assignment mechanism.

  • PDF

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

Quantitative Analysis about Phenolic Compounds of Dendranthema Species in Korean Native Plants (국내 자생 구절초속 중 페놀화합물 함량분석)

  • Kim, Kyeong Mi;Lee, Seon Yu;Jo, Ara;Kang, Byoung Man;Ham, Seongho;Cho, Junghee;Lee, Gukyeo
    • Korean Journal of Pharmacognosy
    • /
    • v.48 no.1
    • /
    • pp.70-76
    • /
    • 2017
  • Dendranthema spp are distributed in various regions in Korea. This report is the quantitative results of phenolic compounds on the 5 resources collected from all over the country. It was known that it has phenolic compounds, as an anticoagulant activities and immunoadjuvant activity of contribute to the cardiovascular effects. This was used for quantitative analysis of chlorogenic acid(CA), 3,5-Dicaffeoylquinic acid(3,5-DCA), 4,5-Dicaffeoylquinic acid(4,5-DCA) and linarin, with UPLC-PDA and LC-IT-TOF-MS. Extraction efficiency of compounds was compared by using ultrasonic extraction and reflux extraction with different extraction conditions (methods and time). In 50% MeOH extracs (30 mins) of Dendranthema zawadskii (Herb.) Tzvelev (SDZ), Dendranthema zawadskii var. yezoense (Maek.) Y.M.Lee & H.J.Choi (NDZ), Dendranthema zawadskii (Herb.) Tzvelev var. teuisectum (Kitag.) J. H. Pak (GDZ), Dendranthema careanum (H. $L{\acute{e}}v$. & Vaniot) Vorosch. (HDC) and Dendranthema zawadskii var. tenuisectum Kitag (PDZ), chlorogenic acid contents were 1.14‰, 6.95‰, 7.27‰, 1.47‰ and 2.64‰, 3,5-dicaffeoylquinic acid contents were 3.30‰, 5.60‰, 10.81‰, 2.67‰ and 1.50‰, 4,5-dicaffeoylquinic acid contents were 0.74‰, 1.93‰, 3.36‰, 0.61‰ and 0.43‰ and linarin contents were 3.90‰, 10.15‰, 0.15‰, 0.73‰ and 0.21‰, respectively.

Establishment of Ecological Environment Plan Item on Urban Development Stages (도시개발 사업 단계별 생태환경계획수립 항목 설정에 관한 연구)

  • Lee, Eun Yeob;Kang, Myung Su
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.4
    • /
    • pp.12-23
    • /
    • 2008
  • This study has a purpose of setting applicable ecological environment plan items when establishing city development plan. To achieve this purpose, multiple methods of data gathering, documentary surveys, and questionaries research were used in this study. The main findings of this study can be summarized as follows; 1. The appliance of ecological environment plan is appropriate to apply before the establishment of development plan. 2. The items applicable to ecological environment plan establishment step by step is the following. First, it is necessary to prepare the environment improvement plan and ecology restoration on the stage of assigning the area. Second, on the stage of planning development plan, it is required to set the restoration plan of ecological resources and step by step ecological environment plan. Third, on the stage of plan implementation, it is required to set the maintenance guide on ecological environment. 3. The planning items of ecological environment plan are "geographical features and soil", "water resource", "wind resource", "green resource", "circulation of resource", "usage of nature energy" and "habitats", etc. 4. To apply ecological environment plan to the planning of development, it is necessary to specify the clear concepts and specific plan. 5. This study is limited to select generalized planning items and later on, it is necessary to develop detailed planning contents.

Resource Metric Refining Module for AIOps Learning Data in Kubernetes Microservice

  • Jonghwan Park;Jaegi Son;Dongmin Kim
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.6
    • /
    • pp.1545-1559
    • /
    • 2023
  • In the cloud environment, microservices are implemented through Kubernetes, and these services can be expanded or reduced through the autoscaling function under Kubernetes, depending on the service request or resource usage. However, the increase in the number of nodes or distributed microservices in Kubernetes and the unpredictable autoscaling function make it very difficult for system administrators to conduct operations. Artificial Intelligence for IT Operations (AIOps) supports resource management for cloud services through AI and has attracted attention as a solution to these problems. For example, after the AI model learns the metric or log data collected in the microservice units, failures can be inferred by predicting the resources in future data. However, it is difficult to construct data sets for generating learning models because many microservices used for autoscaling generate different metrics or logs in the same timestamp. In this study, we propose a cloud data refining module and structure that collects metric or log data in a microservice environment implemented by Kubernetes; and arranges it into computing resources corresponding to each service so that AI models can learn and analogize service-specific failures. We obtained Kubernetes-based AIOps learning data through this module, and after learning the built dataset through the AI model, we verified the prediction result through the differences between the obtained and actual data.

Digital Government Application: A Case Study of the Korean Civil Documents using Blockchain-based Resource Management Model

  • Hanbi Jeong;Jihae Suh;Jinsoo Park;Hanul Jung
    • Asia pacific journal of information systems
    • /
    • v.32 no.4
    • /
    • pp.830-856
    • /
    • 2022
  • The Digital Government landscape is changing to reflect how governments try to discover innovative digital solutions, and how they transform themselves in the process. In addition, with the advent of information and communication technology (ICT), e-governance became an essential part of the government. Among the services provided by the Korean government, the Minwon24 online portal is the most used one. However, it has some processing limitations, namely: (1) it provides a cumbersome document authenticity service; (2) people cannot know what happened even if the agency handles the documents arbitrarily. To address the issues outlined above, blockchain processing can be a good alternative. It has a tremendous potential in that it has maximum transparency and a low risk of being hacked. Resource management is one of the areas where blockchain is frequently used. The present study suggests a new model based on blockchain for Minwon24; the proposed model is a type of resource management. There are three participants: issuer, owner and receiver. The proposed model has two stages: issuing and exchanging. Issuing is creating civil documents on the database, which is BigchainDB in this study. Exchanging, the next stage, is a transaction between the owner and the receiver. Based on this model, the actual program is built with the programming language Python. To evaluate the model, the study uses various criteria and it shows the excellence of the model in comparison to others in prior research.

Service based Disk I/O Control supporting Predictable I/O Bandwidth (예측 가능한 입출력 대역폭을 제공하는 서비스 기반의 디스크 입출력 제어)

  • Kang, Dong-Jae;Lee, Pyoung-Hwa;Jung, Sung-In
    • Journal of Korea Multimedia Society
    • /
    • v.13 no.11
    • /
    • pp.1594-1609
    • /
    • 2010
  • In the case that multiple services are in race condition for limited I/O resource, the services or processes with lower priority occasionally occupy most of limited I/O resource. And it decreases QoS and performance of important services and makes it difficult to efficiently use limited I/O resource. Although system administrator allocates I/O resource according to priority of process, he/she can't know or expect how much resource will be used by the specific process. Due to these reasons, it causes the problem that he/she can't guarantee the service QoS and performance stability. Therefore, in this paper, we propose service based disk I/O control supporting predictable I/O bandwidth to resolve upper problems. Proposed I/O control guarantees the service QoS and performance stability by supporting the service based predictable I/O bandwidth and it makes limited I/O resource to be efficiently used in respect of service.

Analysis of Application Cases of Living Lab for Urban Water Resources: Focusing on Sam-bang Water Living Lab (도시 수자원 리빙랩 적용사례 분석: 김해시 삼방워터 리빙랩을 중심으로)

  • Lee, Nam Jung;Lee, Jung Hoon;Kum, Ah Ro
    • Journal of Information Technology Services
    • /
    • v.20 no.6
    • /
    • pp.141-150
    • /
    • 2021
  • With the recent spread of the concept of Smart Cities which is to solve urban problems with ICT technology, Living Lab, which identifies the demands of citizens who dwell in the city and verifies the acceptability of the services being introduced, has become an important topic. Living Lab is an open innovation platform introduced in consideration of the user's perspective in real life and is a new approach in that service developers use collective intelligence in the process of Co-creation with users. Living Lab is operated on topics which is close to citizens' daily lives such as energy, housing, transportation, and education. In particular, as energy and environmental-focused Living Lab emerges in accordance with the 'Korean New Deal Policy', interest and importance in the field are increasing. The paper derives the characteristics of water resource Living Lab through case analysis of several Living Lab practices. Water resource Living Lab in Daejeon and Chuncheon, which are located in Korea, and water resource Living Lab in Romania and Indonesia are covered in this paper as the reference. The paper finally analyzes the case of Sambang Water Living Lab in Gimhae, which is the city located in southern part of Korea. As a result of case analysis, the urban water resource Living Lab focuses on the raw water of urban water resource and should respond sensitively to the safety of citizens. And for the success of this urban water resource Living Lab, it is essential to ensure that citizens participating in the Living Lab clearly understand the concept of water resources, and citizens' opinions to be implemented as services.

Development of ABC based Management Resource Analysis System - Centering Ground Government Investment Corporation - (활동기준원가 개념에 기반한 경영자원투입분석 시스템 개발 - 정부투자기관의 구축사례를 중심으로 -)

  • Baek Dong-Hyun;Sul Won-Sik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.2
    • /
    • pp.81-93
    • /
    • 2005
  • The main purpose of this paper Is to develop the Management Resource Analysis System for KOTRA which is based on Activity Based Costing(ABC). Because the products and services of KOTRA are exclusive and include a government subsidy, we need develop a different system from the private firm's ABC system. The Management Resource Analysis System that we propose is embodied using JAVA and JSP within an UNIX environment and developed as a Web-enabling base. It is expected for aiding a manager's decision-making such as resource inquiry, standard resource analysis, estimating the ratio of a government subsidy, case based reasoning, what-if analysis. The results of this paper suggest what points are to be considered when we apply ABC for Government Investment Corporation.

The AQR Control in the SCADA System of Manless Power Plant (무인발전소 SCADA SYSTEM 에서의 AQR 제어 운영)

  • Ok, Yeon-Ho;Lee, Eun-Woong;Byun, Ill-Hwan;Kim, Ki-Won;O, Seok-Yeong;Choi, Hyeong-Cheol;Lee, Nam-Hyung
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.58_59
    • /
    • 2009
  • Generator excitation system, supplying the voltage to power system, is controlled by various manners as aspects of power system. Previously excitation systems mainly used AVR(Automatic Voltage Regulator) and FCR(Field Current Regulator) to control voltage, but nowadays the excitation systems have the tendency to adopt AQR(Automatic Reactive power Regulator) and APFR(Automatic Power Factor Regulator) to do it so as to get into step with diverse requirements of power system and high digital technology. This paper presents which operation methods is effective for the equipment, according to increase the unmanned power station thanks to automation technic.

  • PDF