• Title/Summary/Keyword: IT project performance

Search Result 1,413, Processing Time 0.033 seconds

An Empirical Study of the Mediating Effect of Governance in Relationship between Resident Participation and Rural Community Design Project Performance - Focused on the Case of Utturu Village - (주민참여와 농촌 마을만들기 사업성과의 관계에서 거버넌스의 매개효과 실증분석 - 제주 웃뜨르권역 사례를 중심으로 -)

  • Kang, Ki-Ho;Lee, Jin-Hee
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.1
    • /
    • pp.103-115
    • /
    • 2015
  • As rural development projects, mostly carried out in a top-down development method in the past came to take a bottom-up development method in earnest, entering the 2000s, resident participation became an essential element of a rural community design project, to the extent that it can influence the success or failure of a rural community design project. It is taken for granted that rural residents independently participate in community design projects, but as they are accustomed to various subsidy projects carried out by the government and become increasingly aging, it is not easy to induce their spontaneous participation in farming areas with such problems. Especially, to prevent the distrust between administrative agencies and residents from serving as an obstacle in the residents' spontaneous participation, it is necessary to construct horizontal governance among the village residents, administrative agencies and the group of experts supporting for the project. This study attempted to verify the mediating effect of governance in the relationship between resident participation and the performance of the rural community design project based on this problem recognition, and for this purpose, the results of a survey with residents in Utturu Village, Hangyeong-myeon, Jeju-si, which was completed by carrying out a comprehensive rural development project, the typical bottom-up community design project was used for an empirical analysis. The results of the study can provide implications for setting directions, establishing strategies and constructing governance of rural community design projects in the future, and especially, it can be said that this study has academic significance in that governance is recognized as an important variable related to the project performance.

Analysis of Performance Factors of Defense Logistics Strategy (국방물류전략의 성과요인 분석)

  • Kim, Jinho;Lee, Seong-Yoon;Lee, Jaiill;Seo, Jeonghun;Kang, Seokjoong
    • Journal of Information Technology Services
    • /
    • v.17 no.4
    • /
    • pp.21-35
    • /
    • 2018
  • This study reconstructed the military logistics improvement project currently being implemented by ROK military as a defense logistics strategy. In addition the factors affecting the performance of the defense logistics strategy are analyzed using PLS. The significance of this study is as follows. First, the defense logistics improvement project was structured as a defense logistics strategy according to function. Second, PLS is used for performance factor analysis. Most of the existing defense researches utilized the ML structural equation. However, this study used the PLS structural equation in view of the fact that each detail project is the formation of defense logistics strategy. Third, we identified projects that have a substantial impact on defense logistics performance and those that do not. We found that inventory, process, and information strategy influenced logistics performance among defense logistics strategies. On the other hand, it was confirmed that the facility/equipment strategy had no significant effect on defense logistics performance.

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

The Effects of Correct Implementation of Six Sigma Practices on Customer Focus Performance, Quality Performance and Business Performance (식스시그마의 올바른 실행이 고객관점 성과, 품질성과 및 사업성과에 미치는 영향)

  • Yoon, Jae-Hong
    • Korean Management Science Review
    • /
    • v.30 no.1
    • /
    • pp.59-72
    • /
    • 2013
  • This research has seven factors such as top management leadership, belt system operation, implementation of systematic methods, adequate project performance measurement, customer focus performance, quality performance and business performance. Those are critical to correct implementation of Six Sigma. I set seven hypotheses which represented the relationships among the seven factors, gathered questionnaires and analyzed the data. Top management leadership affected positively the adequate project performance measurement and the belt system operation, The belt system operation affected the implementation of systematic methods positively and it also affected the adequate project performance measurement. It affected positively the customer focus performance, the quality performance and the business performance, respectively.

Evaluation on the Relationship between Software Engineering Level and Schedule Deviation in Software Development (SW 공학수준과 SW 프로젝트 납기성과와의 관계)

  • Kim, Seung-Gweon;Ko, Byung-Sun
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.191-204
    • /
    • 2011
  • Recently, many software companies are trying to improve the software quality and project outcome with more costs and efforts in development time. In the software convergence and integration environments, it is required efforts to gain high quality of software. In other words, it is required to utilize software engineering knowledge and technology for higher software quality and better software project productivity. The Software development productivity can be varied by software process capability according to building a framework for software development, selection and use of appropriate technology, human resource management. Software process capability will influence software project outcome which is the general opinion. This study provides empirical evidence about software engineering efforts and investment approach to lead software project performance. We measured the software engineering efforts by SW engineering level and analyzed the corelation between software engineering level and schedule deviation. And, we verified that this performance is affected by the size of software company. As a result, software process capability is important to build a infrastructure and develop systematically software project. The higher software engineering level can lead to improved software project performance.

The Effect of Service Usefulness of Mobile Communication Services on Team Project Performance in the Convergence Era (융복합 시대 모바일 커뮤니케이션 서비스 유용성이 팀 과제 성과에 미치는 영향)

  • Hong, Se-il;Kim, Byoung-soo
    • Journal of Digital Convergence
    • /
    • v.14 no.10
    • /
    • pp.183-193
    • /
    • 2016
  • Recently, collaborations through MCS use in team projects are frequently conducted. This study developed a research model to examine the impact of collaboration through MCS on project performance. Team commitment and team trust regarded as the key drivers of enhancing project performance. Moreover, we also investigated the effect of usefulness of MCS on project performance. We posit ubiquity, polychronic use, and ease of use as the key antecedents of usefulness of MCS. The proposed theoretical framework was tested by using survey data collected from 116 university students who have rich experience with collaboration through MCS. PLS was employed for the analysis of the data. The analysis results showed that team trust significantly influences team commitment and project performance, respectively. However, usefulness of MCS is not significantly related to team commitment, while it play a prominent role in enhancing project performance. The results reveals that ease of use has a significant effect on usefulness of MCS, whereas ubiquity and polychronic use are not significantly related to it. From theoretical and practical perspective, this paper can provide in-depth knowledge of the effects of collaboration via MCS on project performance.

An Exploratory Study on the Relationship with Previous Project Risk Evaluation and Project Performance (사전 프로젝트 리스크 평가와 프로젝트 성과와의 관계에 관한 탐색적 연구)

  • Hosnag, Kim;Kyungsik Yang
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.70-92
    • /
    • 2022
  • Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.

Evaluation of Management Performance for Heritage Buildings Case Study: Greco-Roman Museum - Alexandria, Egypt

  • Adel El-Menchawy;Wael Kamel;Amal Mamdouh;Mirna Eskander
    • Architectural research
    • /
    • v.25 no.3
    • /
    • pp.41-51
    • /
    • 2023
  • Building restoration is a complex process with a high level of uncertainty. Restoration professionals can significantly benefit from the well-established discipline of project management to achieve their targets; however, available evidence shows that the use of the project management body of knowledge in restoration projects is far from the desired level. Several historical organisations have since been established with the goal of preserving and governing cultural identity, and numerous studies have supported the need of preserving architectural heritage. Many owners, investors, academics, and developers believe that it would be considerably more expensive to renovate and restore an old building than to create a new one. Although the project management process is generally recognised, the concept of project management for architectural heritage projects differs due to the uniqueness of each project. It differs from many construction projects in terms of the need for research-based practices to define scope, planning, scheduling, supervision,decision-making,and also performance. The Greco-Roman Museum in Alexandria's planning, design, and building phases are being studied with the aim of identifying and analysing the variables that contribute to project delays. Three project management pillars were established as a result of gathering this data from the project's stakeholders: the first pillar addresses time management for the existing phase and how it will be incorporated into the new extension phase; the second pillar addresses performance in relation to project management issues in the delivery of the best quality of a construction project; and the third pillar addresses the scope of the new extension because it will significantly impact the other two pillars. This paper argues that a contemporary perspective which utilizes project management tools and techniques can contribute to the conservation of architectural heritage in line with the conservation principles.

Structural Equation Model for Information Technologization Success Index(ITSI) of Small and Medium Enterprise (구조방정식 모델을 이용한 중소기업의 IT화 성공지수(ITSI) 개발 연구)

  • Kim, Jung-Geon;Moon, Tae-Hee;Sohn, So-Young
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.338-348
    • /
    • 2004
  • OECD countries including Korea positively adopt performance-based budget systems which convert an input-centered system to an output-centered system to solve two baffling problems: public expense retrenchment and efficiency recovery of government management. Output management of IT project propelled in public sector becomes a prominent figure influenced by these keynote of policy. However, it is placed in difficult circumstances to develop a performance index and the methodology to cover characteristics of IT project, measuring the goal achievement of business and the customer contentment according to the phases of business progress. Existing studies of IT project accomplishment measurement have been fulfilled on the subject of business targeting on IT technology application, administrative information network business and national base of information network construction. Most of the studies have been executed using BSC or AHP to reflect synthetically business specifics of IT project from a methodological point of view. In this study, we propose a structural equation model (SEM) to develop a performance index which measures the outcome of IT project according to the phases of business progress, avoiding a simple presentation of project outcome or conceptual frame. The proposed SEM is applied to the survey results of "IT support project for Small and medium business". Based on the fitted model, we apply ACSI concept to develop an Information Technologization Success Index (ITSI). This index allows us comparison of several IT vendors as well as feedback information for further improvement.

The Impacts of Requirement Uncertainty and Standardization on Software Project Performance : A Comparison of Korea and USA (요구사항 불확실성과 표준화가 소프트웨어 프로젝트 성과에 미치는 영향 : 한국과 미국의 비교연구)

  • 나관식
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.15-27
    • /
    • 2004
  • Most software projects inevitably involve various types and degrees of uncertainty. Without proper risk assessment and coordination, software projects can easily run out of control and consume significant additional resource. Thus, risk management techniques are critical issues to information system researchers. Previous empirical studies of U.S. software firms support the adoption of development standardization and user requirement analysis techniques in risk-based software project management. Using data collected from software projects developed in Korea during 1999-2000, we conduct a comparative study to determine how risk management strategies impact software product and process performance in countries with dissimilar IT capabilities. In addition, we offer an alternative conceptualization of residual performance risk. We show that the use of residual performance risk as an intervening variable is inappropriate in IT developing countries like Korea where the role of late stage risk control remedies are critical. A revised model is proposed that generates more reliable empirical implications for Korean software projects.

  • PDF